SN | Orgnization | Tender Id | Tender Reference No | Tender Title | PublishedDate | Amount(UPLC Charges) | Payment | Payment Detail |
1 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227514_1 | 272/5 | SUPPLY AND ELECTRIFICATION WORK | 11-Jul-2018 09:00 AM | 250.00 | | |
2 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_179471_1 | 3254/2018 | Operation of DG Set 40KVA | | 250.00 | | |
3 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_204040_1 | E/M(325)/2018-236 | E/M (325)/2018-236 | 16-May-2018 10:00 AM | 250.00 | | |
4 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_204055_1 | E/M(325)/2018-236 | E/M (325)/2018-236 | 16-May-2018 10:00 AM | 250.00 | | |
5 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_81633_1 | E/M(325)/2017-1863 | Replacement of LED light inplace of S.V lamp in 02 Nos High Mast Light 16Mtr at N.M.Y.Barabanki. | | 391.70 | | |
6 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_81633_2 | E/M(325)/2017-1863 | Replacement of LED light inplace of S.V lamp at N.M.Y. Hardoi. | | 673.70 | | |
7 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_81633_3 | E/M(325)/2017-1863 | Replacement of LED light inplace of S.V lamp in 02 Nos High Mast Light and Street light Pole at N.M.Y. Gonda. | | 250.00 | | |
8 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_81633_4 | E/M(325)/2017-1863 | Replacement of LED light inplace of S.V lamp at N.M.Y. Lakhimpur. | | 707.50 | | |
9 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_81633_5 | E/M(325)/2017-1863 | S/F of Over Head Retro Reflective sign board-02Nos And Cantilever Retro Reflective sign board-02Nos. at N.M.Y Kayamganj, Distt. Farukhabad. | | 250.00 | | |
10 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_81633_6 | E/M(325)/2017-1863 | External Electrification, LED light, Pole painting and cabling work at N.M.Y Kayamganj, Distt. Farukhabad. | | 270.70 | | |
11 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_81633_7 | E/M(325)/2017-1863 | Internal electrification in office Builing, Staff Quarters, Type fist 04Nos, Type IInd -04Nos, Type IIrd -01No. Pump House, DG room at N.M.Y Kayamganj, Distt. Farukhabad. | | 250.00 | | |
12 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_81633_8 | E/M(325)/2017-1863 | Replacement of LED light inplace of S.V lamp in 01 Nos High Mast Light and Street light Pole at N.M.Y Mahmudabad. Distt. Sitapur. | | 254.00 | | |
13 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_82436_1 | E/M(325)/2017-1911 | Decoration of Kisan Mandi Bhawan, Gomti Nagar, Lucknow on 14 December 2017 to 15 December 2017 on the occasion of Independence Day -2017 | | 250.00 | | |
14 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_87896_1 | E/M (325)/2017-2238 | Comprehensive Maintanance of 07 nos Lift Installed at kishan Mandi Bhawan Gomti Nagar lko | | 250.00 | | |
15 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_95643_1 | E/M(325)/17-2409 | upply and Installation of 63 KVA Transformers and Other Related Works. | | 250.00 | | |
16 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_117289_2 | 2696/2017 | Replacement of 06 nos Passenger Lift 09 and 10 Stops (ECE Make) Capacity 13 Passenger (884Kg) installed in Kisan Mandi Bhawan Gomti Nagar Lko | | 250.00 | | |
17 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_117279_2 | 2017/2699 | S/I/T/C of New 09 and 10 Stops Passenger Lift Capacity 13 Passenger (884Kg) in Kisan Mandi Bhawan Gomti Nagar Lko. | | 250.00 | | |
18 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_123368_1 | 2782/2017 | Supply, Installation, Testing and Commissioning of 2.0 MT capacity Vapour Heat Treatment machine (V.H.T.) with complete accessories along puff panelling VHT related sorting / grading and quarantine area at Mango Pack House, Rehmen Khera, Lucknow faci | | 250.00 | | |
19 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_128649_1 | 2864/2017-18 | Annual Comprehensive Maintenance andopration of 680ton air conditioning plant installed at kisan mandi bhawan gomti nagar lucknow | | 326.92 | | |
20 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2017_RKUMP_128811_1 | 2888/207-18 | Supply, Installation, Testing and Commissioning of 2.0 MT capacity Vapour Heat Treatment machine (V.H.T.) for Mango, other fruits and vegetables with complete accessories, along with puff panelling for VHT related sorting / grading and quarantine are | | 250.00 | | |
21 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_133378_1 | 2916/2017-18 | Decoration of Kisan Mandi Bhawan, Gomti Nagar, Lucknw on Republic Day -2018 | | 250.00 | | |
22 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_140694_1 | 2999/2017 | S/I/T/C of Fire Detection and Fire Alarm System and Fire Hydrant System At Kisan Mandi Bhawan Gomti Nagar Lko. | | 873.33 | | |
23 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_145867_1 | 3068/2018 | COMPREHENSIVE MAINTENANCE AND OPRATION OF 50MT COMPUTERISED ELECTRONIC WEIGH BRIDGE INTALLED IN UP | | 250.00 | | |
24 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_179449_1 | 3265-2018 | Operation and maintenance of fire fighting and fire alarm system | | 861.10 | | |
25 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_185148_1 | 3279/2018 | S/I/T/C of Fire Detection and Fire Alarm System and Fire Hydrant System At Kisan Mandi Bhawan Gomti Nagar Lko. | 07-Apr-2018 09:00 AM | 873.33 | | |
26 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_186584_1 | 3348 NAWABGANJ | 2) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Nawabganj(Gonda) | 10-Apr-2018 09:00 AM | 250.00 | | |
27 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_186595_1 | 3348 HAIDERGARH | 3) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Haidergrah(Barabanki) | 10-Apr-2018 09:00 AM | 250.00 | | |
28 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_186606_1 | 3348 RURA | 4) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Rura(Kanpur Dehat) | 10-Apr-2018 09:00 AM | 250.00 | | |
29 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_186622_1 | 3348 JHIJHAK | 5) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Jhinjhak(Kanpur Dehat) | 10-Apr-2018 09:00 AM | 250.00 | | |
30 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_186640_1 | 3348 UTTARIPURA | 6) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Uttaripura(Kanpur Dehat) | 10-Apr-2018 09:00 AM | 250.00 | | |
31 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_186651_1 | 2248 PALIYA | 7) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY-paliya(Lakhimpur) | 10-Apr-2018 09:00 AM | 250.00 | | |
32 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_186658_1 | 3348 MAGALGANJ | 8) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY-Magalganj(Lakhimpur) | 10-Apr-2018 09:00 AM | 250.00 | | |
33 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_186681_1 | 3348 GOLA | 9) Annual Comprehensive Maintenance and operation work for three years of existing 02 No. 50MT Electronic Computerizd weigh bridge at NMY- Gola(Lakhimpur) | 10-Apr-2018 09:00 AM | 382.32 | | |
34 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_186697_1 | 3348 AURIAYA | 10) Annual Comprehensive Maintenance and operation work for three years of existing 02 No. 50MT Electronic Computerizd weigh bridge at NMY- Auriaya | 10-Apr-2018 09:00 AM | 382.32 | | |
35 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_186702_1 | 3348 BAHRICH | 11) Annual Comprehensive Maintenance and operation work for three years of existing 02 No. 50MT Electronic Computerizd weigh bridge at NMY- Bahrich | 10-Apr-2018 09:00 AM | 382.32 | | |
36 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192402_1 | E/M (325)/2018-110, Dated 17/04/2018 | Providing Services of Electrician, Lift Oprater and Pump Oprater at RKUMP Lucknow | 19-Apr-2018 01:00 PM | 264.21 | | |
37 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_1 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Uttaripura(Kanpur Dehat) | 20-Apr-2018 11:30 AM | 250.00 | | |
38 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_2 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 05 No. 50MT Electronic Computerizd weigh bridge at NMY- Naubasta(Kanpur) | 20-Apr-2018 12:45 PM | 382.32 | | |
39 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_3 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 05 No. 50MT Electronic Computerizd weigh bridge at NMY- BAHRICH | 20-Apr-2018 05:55 PM | 250.00 | | |
40 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_4 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 05 No. 50MT Electronic Computerizd weigh bridge at NMY- Auriya | 21-Apr-2018 09:00 AM | 250.00 | | |
41 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_5 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 05 No. 50MT Electronic Computerizd weigh bridge at NMY- GOLA | 21-Apr-2018 09:00 AM | 250.00 | | |
42 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_6 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 05 No. 50MT Electronic Computerizd weigh bridge at NMY- PALIYA | 21-Apr-2018 09:00 AM | 250.00 | | |
43 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_7 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- JHINJHAK | 21-Apr-2018 09:00 AM | 250.00 | | |
44 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227521_1 | 272/7 | SUPPLY GENSET HIGHMAST LED WORK | 11-Jul-2018 03:30 PM | 250.00 | | |
45 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_8 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- RURA | 21-Apr-2018 09:00 AM | 250.00 | | |
46 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_9 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- HAIDERGRAH | 21-Apr-2018 09:00 AM | 250.00 | | |
47 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_10 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- MAGALGANJ | 21-Apr-2018 12:00 PM | 250.00 | | |
48 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_11 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- nawabganj | 21-Apr-2018 12:00 PM | 250.00 | | |
49 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_192875_12 | 106/2018 | Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- GONDA | 21-Apr-2018 12:00 PM | 250.00 | | |
50 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_193440_1 | 74/2018 | COMPREHENSIVE MAINTENANCE OF 07 NOS LIFTS CAPACITY 13 PASSENGER(884KG) INSTALLED IN KISHAN MANDI BHAWAN GOMTI NAGAR LUCKNOW | 21-Apr-2018 01:00 PM | 250.00 | | |
51 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_204859_1 | E/M(325)/2018-215 | Internal Electrification in Staff Qtrs Type I 2Nos Type II 02Nos Type III offices pump house check post A type shop 5 nos B type shop 10 nos C type shop 27 nos APF in vegetable market at NMY Safdarganj Barabanki | 18-May-2018 09:00 AM | 283.03 | | |
52 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_205250_1 | E/M(325)/2018-215-3 | Repairing of LT Line SF TPMO Set Street Light etc SF of 150Ltr Capacity 03Nos water cooler RO water purifier 03Nos 4KVA Steblizer Construction of water cooler case GI Pipe line and cabling work at NMY Gola Lakhimpur | 19-May-2018 09:00 AM | 250.00 | | |
53 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_205822_1 | E/M(325)/2018-215-10 | Internal wiring in check post WB Room Repairing of LT Line SF of Led Light on pole High Mast SF of 150Ltr Capacity 03Nos water cooler RO water purifier 03Nos 4KVA Steblizer at NMY Madhauijang | 21-May-2018 09:00 AM | 264.49 | | |
54 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_205829_1 | E/M(325)/2018-215-9 | Repairing of Internal Wiring in office Building, Internal Wiring in APF 12 44M 02Nos Repariring of LT Line Led Light cabling work Etc NMY Sandila Hardoi | 21-May-2018 09:00 AM | 250.00 | | |
55 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_205980_1 | E/M(325)/2018-215-2B | S/F of LED Light 200W 24Nos 110 to 130W 35Nos Steel Tubular Pole 08Nos Rewiring of Office toilet block tightening of LT line DB of 500 Amp for substation and Cabling laying works And SF of 150Ltr Capacity 01Nos water cooler RO water purifier 01N | 22-May-2018 09:00 AM | 250.00 | | |
56 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_206002_1 | E/M(325)/2018-215-2A | S/F of LED Light 200W 64Nos 110W to 130W 68Nos Steel Tubular Pole 09Nos Submersible Pump 02Nos wiring in toilet block MCCB control panel gate 15HP lightes and Cabling works etc at NMY Sitapur Road Lucknow | 22-May-2018 09:00 AM | 436.47 | | |
57 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_206236_1 | E/M(325)/2018-215-1 | Street light convert in to LED light LT line work cabling other related work at mandi parishad awasya colony Gomti Nagar Lucknow | 22-May-2018 09:00 AM | 250.00 | | |
58 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_206238_1 | E/M(325)/2018-215-5 | Repairing Extension of LT Line Cabling SI of 15HP Submersible Pump Panel etc at NMY Chakarpur Bhouti Kanpur | 22-May-2018 09:00 AM | 411.73 | | |
59 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_205694_1 | 215 | Repairing work of External Electrification, LED light, Pole painting and S/F of 01 Nos LED High Mast Light with cabling work | 22-May-2018 10:00 AM | 250.00 | | |
60 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_205908_1 | 215 | External Electrification, LED light, Pole painting and cabling work | 22-May-2018 10:00 AM | 255.43 | | |
61 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_205914_1 | 215 | S AND F of 02 Nos LED High Mast Light AND repair work of external electrification LED light pole painting with cabeling work | 22-May-2018 10:00 AM | 293.79 | | |
62 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_205936_1 | 215 | S/F of 150 Ltr. Capacity 04 Nos. water cooler. RO water purifier 04 Nos., 4KVA stabilizer, Construction of water cooler case, GI pipe line construction and S/F of LED flood light on old high mast with Cabling, main Switch etc. cabling AND Constructi | 22-May-2018 10:00 AM | 250.00 | | |
63 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_205964_1 | 215 | S/F of 150 Ltr. Capacity 05 Nos. water cooler. RO water purifier 05 Nos., 4KVA stabilizer, Construction of water cooler case, GI pipe line construction and Repairing work of External Electrification, LED light, Pole painting and cabling work | 22-May-2018 10:00 AM | 454.83 | | |
64 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_206184_1 | 215 | External Electrification, LED light, Pole painting and cabling | 22-May-2018 10:00 AM | 250.00 | | |
65 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_206317_1 | E/M(325)/2018-215-2C | S/F of LED Light 200W 24Nos 110 to 130W 40Nos Steel Tubular Pole 05Nos Wiring in toilet block gate lights RO water purifier and Cable laying works etc at NMY Fish Market Lucknow | 23-May-2018 09:00 AM | 250.00 | | |
66 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_217872_1 | 438 | Comprehensive maintenance of seven No. Lifts | 16-Jun-2018 09:00 AM | 250.00 | | |
67 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227505_1 | 215 | Supply item Repairing Electrical work | 11-Jul-2018 09:00 AM | 250.00 | | |
68 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_209127_1 | E/M(325)/2018-230-5 | Repairing of LT Line SF of LED Light Cabling works etc At NMY Haidergarh Barabanki | 26-May-2018 06:00 PM | 250.00 | | |
69 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_209155_1 | E/M(325)/2018-230-1 | Repairing Rewiring of Internal Electrification in diffrent type Bld And APF 04 Nos Pump House 02Nos at at NMY Mahamudabad | 26-May-2018 06:00 PM | 250.00 | | |
70 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_209247_1 | E/M(325)/2018-230-2B | Internal Electrification in office BuildingAPF 12 88 Mtr 01 Nos A type Shop 07Nos B type shop 05Nos C type shop 25Nos Check Post Record Room at NMY Risiya Distt Behraich | 26-May-2018 06:00 PM | 250.00 | | |
71 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_209339_1 | E/M(325)/2018-230-2A | Reparing of LT Line HT Line SF of LED light 0f Cabling Works at NMY Reciya Baharich | 26-May-2018 06:00 PM | 258.59 | | |
72 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_209407_1 | E/M(325)/2018-230-3A | Exsiting High Mast Lighting system and Existing MHL Light convert into LED Light at NMY Bahraich | 26-May-2018 06:00 PM | 359.43 | | |
73 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_209432_1 | E/M(325)/2018-230-3B | SITC 02 No 30 mtr LED High Mast Lighting system and Existing MHL Light convert into LED Light and SF of 150Ltr Capacity 02Nos water cooler RO water purifier 02Nos, 4KVA Steblizer Construction of water cooler case GI Pipe line and cabling work at NMY | 26-May-2018 06:00 PM | 332.20 | | |
74 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_209498_1 | E/M(325)/2018-230-6 | SF of Led light 110 W to 130W Steel Tubuler Pole cabling work Etc At NMY Leaharpur | 26-May-2018 06:00 PM | 250.00 | | |
75 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_209771_1 | E/M(325)/2018-230-4 | Repairing shifting of LT line and of 110 to 130 watt LED Light DB of 500 Amp for sub station TPMO DO fuse etc and Cable laying works SF of 150Ltr Capacity 03Nos water cooler RO water purifier 03Nos 4KVA Steblizer Construction of water cooler cas | 28-May-2018 09:00 AM | 250.00 | | |
76 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_210002_1 | E/M (325)/2018-291, Dated 25/05/2018 | Providing Manpower Services of Electrician, Lift Oprater and Pump Oprater at Kisan Mandi Bhawan Gomtinagar, Lucknow | 29-May-2018 09:00 AM | 264.21 | | |
77 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_210002_2 | E/M (325)/2018-291, Dated 25/05/2018 | Comprehensive Maintenance of 07 Nos Lift Capaciy 13 Passenger (884 Kg) installed in Kishan Mandi Bhawan Gomti Nagar Lucknow | 29-May-2018 09:00 AM | 250.00 | | |
78 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_224965_1 | E/M(325)/2018-272-2A | Repairing of LT Line SF of LED Street Light related works At NMY Karnailganj Gonda | 05-Jul-2018 04:00 PM | 250.00 | | |
79 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_224994_1 | E/M(325)/2018-272-2B | Repairing of Internal electrification in A B C type shop APF canteen Pump house office check post At NMY Kaarnailganj Gonda | 05-Jul-2018 04:00 PM | 250.00 | | |
80 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225088_1 | E/M(325)/2018-272-1A | Construction of LTLine Double Pole Structure SF of 63KVA Transformer LED street light on pole Cabling Works etc at NMY Safdarganj Barabanki | 05-Jul-2018 04:00 PM | 250.00 | | |
81 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225123_1 | E/M(325)/2018-272-1B | Supply Erection Testing Commissioning of 2 Nos 16 Mtr High Mast Lighting System with 8 Nos LED Flood Light at NMY Safdarganj Barabanki | 05-Jul-2018 04:00 PM | 250.00 | | |
82 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225148_1 | E/M(325)/2018-272-6A | Internal Electrification in B Type Shops 06Nos C Type Shops 20Nos APF12 88 03 Nos APF 9 16 01 No Gate02Nos Toilet Block Grain Etc at NMY Gonda | 05-Jul-2018 04:00 PM | 250.00 | | |
83 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225168_1 | E/M(325)/2018-272-6B | Internal Electrification in B Type Shops 08Nos C Type Shops 20Nos Supper market 20 Nos Gate02 No Toilet Block and Rewiring of Internal electrification in office building Fruit and Vegetable NMY FV Gonda | 05-Jul-2018 04:00 PM | 250.00 | | |
84 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225187_1 | E/M(325)/2018-272-6C | Repairing of LT Line SF of LED light Cabling works etc at NMY FV Gonda | 05-Jul-2018 04:30 PM | 250.00 | | |
85 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225782_1 | E/M(325)/2018-230-R5 | Repairing of LT Line SF of LED Light Cabling works etc At NMY Haidergarh Barabanki | 06-Jul-2018 04:00 PM | 250.00 | | |
86 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225862_1 | E/M(325)/2018-230-R3A | Exsiting High Mast Lighting system and Existing MHL Light convert into LED Light at NMY Bahraich | 06-Jul-2018 04:00 PM | 359.43 | | |
87 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225882_1 | E/M(325)/2018-230-3A | SITC 02 No 30 mtr LED High Mast Lighting system and Existing MHL Light convert into LED Light and SF of 150Ltr Capacity 02Nos water cooler RO water purifier work at NMY Bahraich | 06-Jul-2018 04:00 PM | 332.20 | | |
88 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225903_1 | E/M(325)/2018-230-R1 | Repairing Rewiring of Internal Electrification in diffrent type Bld And APF 04 Nos Pump House 02Nos at at NMY Mahamudabad | 06-Jul-2018 04:00 PM | 250.00 | | |
89 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225925_1 | E/M(325)/2018-230-R2A | Reparing of LT Line HT Line SF of LED light 0f Cabling Works at NMY Reciya bahraich | 06-Jul-2018 04:00 PM | 258.59 | | |
90 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225936_1 | E/M(325)/2018-230-R2B | Internal Electrification in office BuildingAPF 12 88 Mtr 01 Nos A type Shop 07Nos B type shop 05Nos C type shop 25Nos Check Post Record Room at NMY Risiya Distt Behraich | 06-Jul-2018 04:00 PM | 250.00 | | |
91 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_225953_1 | E/M(325)/2018-215-R11 | Internal Electrification in Staff Qtrs Type offices pump house check post A type shop 5 nos B type shop 10 nos C type shop 27 nos APF in vegetable market at NMY Safdarganj Barabanki | 06-Jul-2018 04:00 PM | 283.03 | | |
92 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_226937_1 | E/M(325)/2018-215-R10 | Internal wiring in check post WB Room Repairing of LT Line SF of Led Light on pole High Mast SF of 150Ltr Capacity 03Nos water cooler RO water purifier 03Nos 4KVA Steblizer at NMY Madhawganj | 10-Jul-2018 09:00 AM | 264.49 | | |
93 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_226952_1 | E/M(325)/2018-215-R9 | Repairing of Internal Wiring in office Building Internal Wiring in APF M 02Nos Repariring of LT Line Led Light cabling work Etc NMY Sandila Hardoi | 10-Jul-2018 09:00 AM | 250.00 | | |
94 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_226983_1 | E/M(325)/2018-215-R6 | SF of Led light 110 to 130W Steel Tubuler Pole cabling work Etc At NMY Leaharpur | 10-Jul-2018 09:00 AM | 250.00 | | |
95 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227008_1 | E/M(325)/2018-215-R3 | SF of Led Light on pole High Mast at NMY Sitapur | 10-Jul-2018 09:00 AM | 361.86 | | |
96 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227206_1 | E/M(325)/2018-215-R4A | Repairing of LT Line Replacement of Damage Pole SF of Led Light at at NMY Sahabad | 10-Jul-2018 01:00 PM | 250.00 | | |
97 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227213_1 | E/M(325)/2018-215-R4B | Supply Erection Testing Commissioning of 3 Nos 16 Mtr High Mast Lighting System with 8 Nos LED Flood Light at NMY Sahabad | 10-Jul-2018 01:00 PM | 250.00 | | |
98 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227771_1 | 215/5 | Repairing /Extension of L.T. Line, cabling, S/F of 15 HP. Submersible Pump, Panel etc. at NMY Chakarpur, Bhauti Kanpur | 11-Jul-2018 04:00 PM | 411.73 | | |
99 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227788_1 | 215/1 | Street Light convert in to LED Light, LT Line work, Cabling and other Related work at Mandi Parishad Awasiya Colony Gomti Nagar LKO. | 11-Jul-2018 04:30 PM | 250.00 | | |
100 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227671_1 | E/M(325)/2018-230-R4 | Repairing shifting of LT line sub station TPMO DO fuse etc and Cable laying works SF of 150Ltr Capacity 03Nos water cooler RO water purifier 03Nos 4KVA Steblizer Construction of water cooler case GI Pipe line and cabling work at NMY Bangarmau | 12-Jul-2018 09:00 AM | 250.00 | | |
101 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227685_1 | E/M(325)/2018-215-R2B | SF of LED Light Capacity 01Nos water cooler RO water purifier 01Nos 4KVA Steblizer Construction of water cooler case GI Pipe line and cabling work at NMY Dubbagga Lucknow | 12-Jul-2018 09:00 AM | 250.00 | | |
102 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227692_1 | E/M(325)/2018-215-R2C | SF of LED Light 200W 24Nos 110 to 130W 40Nos Steel Tubular Pole 05Nos Wiring in toilet block gate lights RO water purifier and Cable laying works etc at NMY Fish Market Lucknow | 12-Jul-2018 09:00 AM | 250.00 | | |
103 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227705_1 | E/M(325)/2018-215-R2A | SF of LED Light 200W 64Nos 110W to 130W68Nos Steel Tubular Pole 09Nos Submersible Pump 02Nos wiring in toilet block MCCB control panel gate 15HP lightes and Cabling works etc at NMY Sitapur Rd Lucknow | 12-Jul-2018 09:00 AM | 436.47 | | |
104 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227724_1 | E/M(325)/2018-215-R7A | SF of 150 Ltr Capacity 04 Nos water cooler RO water purifier 04 Nos 4KVA stabilize LED flood light on old high mast with Cabling, main Switch etc. cabling Construction of Tube Well SF of 1 0 HP Submersible Pump work at NMY Chibramau Distt Kannouj | 12-Jul-2018 09:00 AM | 250.00 | | |
105 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227743_1 | E/M(325)/2018-215-R4A | SF of 150 Ltr Capacity 05 Nos water cooler RO water purifier 05 Nos 4KVA stabilizer Construction of water cooler case GI pipe line construction and RO water purifier 02 Nos 4KVA stabilizer NMY Fruit Mandi Arrah Pahadpur Distt Farukhabad | 12-Jul-2018 09:00 AM | 454.89 | | |
106 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227752_1 | E/M(325)/2018-215-R4B | SF of 02 Nos LED High Mast Light repair work of external electrification LED light pole painting with cabeling work at fruit mandi, Arrah Pahadpur Dist Farukhabad | 12-Jul-2018 09:00 AM | 293.79 | | |
107 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227762_1 | E/M(325)/2018-215-R6 | Repairing work of External Electrification LED light Pole painting and SF of 01 Nos LED High Mast Light with cabling work at NMY Kamalganj Mandi Distt Farukhabad | 12-Jul-2018 09:00 AM | 250.00 | | |
108 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227778_1 | E/M(325)/2018-215-R7B | External Electrification LED light Pole painting and cabling work at NMY Chibramau Distt Kannouj | 12-Jul-2018 09:00 AM | 255.43 | | |
109 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_227791_1 | E/M(325)/2018-215-R8 | External Electrification LED light Pole painting and cabling work at NMY Kannouj | 12-Jul-2018 09:00 AM | 250.00 | | |
110 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_235481_1 | E/M 746 | Comprehensive Maintenance of VIP Lift and Passenger Lift | 02-Aug-2018 06:30 PM | 250.00 | | |
111 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_235743_1 | E/M 746-I | Decoration of Kissan Mandi Bhawan, Gomti Nagar, Lucknow | 02-Aug-2018 06:40 PM | 1237.62 | | |
112 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_248209_1 | e/m 951 | Comprehensive Maintenance of 07 Lifts Capacity 13 Passenger installed in kissan Mandi Bhawan Gomti Nagar LKO. | 11-Sep-2018 10:00 AM | 250.00 | | |
113 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249089_1 | E/M,325,980 | S/F of water cooler.with RO,LED flood light on old high mast with Cabling, main Switch etc. Cons. of Tube Well and S/F of 1.0 H.P. Submersible Pump . | 17-Sep-2018 10:00 AM | 250.00 | | |
114 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249097_1 | E/M,325,980A, | Repairing of External Electrification and Supply /Fixing of LED Light on Pole etc. works. | 17-Sep-2018 10:00 AM | 255.43 | | |
115 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249116_1 | E/M,325/980/B | Repairing work of External Electrification, LED light, Pole painting and S/F of 01 Nos LED High Mast Light with cabling work at N.M.Y Kamalganj Mandi, Distt. Farukhabad. | 17-Sep-2018 10:00 AM | 250.00 | | |
116 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249132_1 | E/M,325/2018/980C | Internal Electrification in Different Types Building and Shops | 17-Sep-2018 10:00 AM | 283.03 | | |
117 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249144_1 | E/M,325/2018/980D | Internal Electrification in Different Type Building/ Shops and A.P.F. etc. | 17-Sep-2018 10:00 AM | 250.00 | | |
118 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249153_1 | E/M,325/2018/980E | Repairing Of H.T. /L.T Line and S/F of LED lights etc. | 17-Sep-2018 10:00 AM | 258.59 | | |
119 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249160_1 | E/M,325/2018/980E | S/F of LED Light in 30 Mtr. Hight High Mast Light and Repairing of LT Line etc. | 17-Sep-2018 10:00 AM | 359.43 | | |
120 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249543_1 | E/M/325/980 | Repairing of L.T. Line, S/F of LED Light and Cabling works and Internal Rewiring A.P.F. 02Nos. | 17-Sep-2018 10:00 AM | 250.00 | | |
121 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249624_1 | E/M/325/980 | Repairing of Internal Wiring in office Building, Internal Wiring in A.P.F. 12x44M- 02Nos, Repairing of L.T. Line Led Light and cabling work Etc . | 17-Sep-2018 10:00 AM | 250.00 | | |
122 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249643_1 | E/M/325/980 | Repairing of L.T. Line. and Replacement of Damage Pole, S/F of Led Light | 17-Sep-2018 10:00 AM | 335.59 | | |
123 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249680_1 | E/M,325/980G | Internal wiring in check post and W.B. Room Repairing of L.T. Line, S/F of Led Light on pole and High Mast and S/F of 150Ltr. Capacity 03Nos. water cooler. RO water purifier 03Nos, 4KVA Steblizer. | 17-Sep-2018 10:00 AM | 264.49 | | |
124 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249692_1 | E/M,325/980H | Repairing /Extension of LT Line, cabling, S/F of 15 HP Submersible Pump, Panel etc. | 17-Sep-2018 10:00 AM | 411.73 | | |
125 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249709_1 | E/M,325/980I | STREET LIGHT CONVERT INTO LED LIGHT, LT LINE WORK, CABLING and OTHER RELATED WORK AT MANDI PARISHAD, AWASIYA COLONY | 17-Sep-2018 10:00 AM | 250.00 | | |
126 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249773_1 | E/M,325/980J | /F of LED Light-200W-64Nos, 110W to 130W-68Nos,Steel Tubular Pole-09Nos, 15HP Submersible Pump-02Nos, wiring in toilet block ,MCCB control panel, gate lightes and Cabling works etc. | 17-Sep-2018 10:00 AM | 436.47 | | |
127 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249783_1 | E/M,325/980K | S/F of LED Light-200W-24Nos, 110 to 130W-40Nos, Steel Tubular Pole-05Nos, Wiring in toilet block, gate lights RO water purifier and Cable laying works etc. OR S/F of LED Light-200W-24Nos, 110 to 130W-40Nos, Steel Tubular Pole | 17-Sep-2018 10:00 AM | 250.00 | | |
128 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249817_1 | E/M,325/980L | S/F of water cooler witth R.O., LED Light-200W-24Nos,110 to 130W-35Nos,Steel Tubular Pole-08Nos,Rewiring of Office and toilet block, tightening of LT line, DB of 500 Amp for substation and Cabling laying works etc. | 17-Sep-2018 10:00 AM | 250.00 | | |
129 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_249824_1 | E/M,325/980L | Repairing of LT Line and internal Electrification in APFetc. At N.M.Y. F and V Gonda. | 17-Sep-2018 10:00 AM | 334.04 | | |
130 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_250547_1 | E/M,325/980P | Internal Electrification in Buildings APF. And Repairing of L.T. Line at NMY Mahmoodabad. | 17-Sep-2018 10:00 AM | 280.40 | | |
131 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_250567_1 | E/M,325/980P | Internal Electrification,Lighting System and AC Works in Office of OSD , Legal at Kisan Mandi Bhawan Gomti Nagar, Lko | 17-Sep-2018 10:00 AM | 250.00 | | |
132 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_250576_1 | E/M,325/ 2018/980R | Internal Wiring in Godawn 1000Mt- 03Nos , S/F of Steel Tubular Pole and LED Street Light-16 Nos.etc. at N.M.Y.Lakhimpur. | 17-Sep-2018 10:00 AM | 250.00 | | |
133 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_250847_1 | E/M,325/ 2018/980R | Internal Rewiring in A.P.F. 4No and 7Nos , S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos, 4KVA Steblizer, Construction of water cooler case, GI Pipe line and cabling work | 17-Sep-2018 10:00 AM | 250.00 | | |
134 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_250858_1 | E/M,325/ 2018/980S | Internal Wiring in APF, Pump House, Repairing of L.T. Line. and S/F T.P.M.O. Set , LED Light on Pole OR High Mast, 03Nos. water cooler with RO and cabling work etc. | 17-Sep-2018 10:00 AM | 314.69 | | |
135 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253540_1 | E/M/325/1042G | Extension of LT Line, S/F of LED Light and Cabling Work at NMY (F and V ) Gonda. | 28-Sep-2018 10:00 AM | 250.00 | | |
136 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253544_1 | E/M/325/1042H | Repairing of Internal electrification in A B C type shop, APF canteen, Pump house, office and repairing of LT Line At NMY Karnailganj, Gonda. | 28-Sep-2018 10:00 AM | 319.36 | | |
137 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253546_1 | E/M/325/1042H | R /S of LT line , S/F of LED Light on Pole/ High Mast, Cabling and S/F of water cooler/ RO water purifier 03Nos water cooler etc. work at NMY. Bangermau | 28-Sep-2018 10:00 AM | 275.75 | | |
138 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253550_1 | E/M/325/1042I | Repairing of L.T. Line. and S/F of Led Light on pole and High Mast .at NMY Sandi | 28-Sep-2018 10:00 AM | 250.00 | | |
139 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253554_1 | E/M/325/1042J | S/F of Led light, Steel Tubuler Pole and cabling work Etc, Repairing of Internal Electrification At N.M.Y. Leaharpur. | 28-Sep-2018 10:00 AM | 250.00 | | |
140 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253558_1 | E/M/325/1042K | S/F of Led Light on pole and High Mast and Internal Rewiring at NMY Sitapur | 28-Sep-2018 10:00 AM | 431.43 | | |
141 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253562_1 | E/M/325/1042L | S/F of Over Head Retro Reflective sign board and Cantilever Retro Reflective sign board at N.M.Y. Sandi. | 28-Sep-2018 10:00 AM | 250.00 | | |
142 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253565_1 | E/M/325/1042M | Internal Electrifiication in Pestiside Lab at NMYNauvasta, Kanpur, Distt.- Kanpur Nagar. | 28-Sep-2018 10:00 AM | 250.00 | | |
143 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253566_1 | E/M/325/1042M | Internal Electrifiication in Kisan Shop-10 No. at NMY Uttaripira Distt. Kanpur. | 28-Sep-2018 10:00 AM | 250.00 | | |
144 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253575_1 | E/M/325/1042M | External Electrification, LED Light on old high mast light at N.M.Y Kannauj and External Electrification, LED light, Pole painting and cabling work at SMY Tirwa Distt. Kannauj | 28-Sep-2018 10:00 AM | 305.52 | | |
145 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253720_1 | E/M/325/1042N | Internal Electrification in different type and Building Etc.and Rewiring of Internal electrification in office building at NMY (F/V and Grain) Gonda. | 28-Sep-2018 10:00 AM | 426.64 | | |
146 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253816_1 | E/M/325/1042P | S/I of 25KVA silent D.G. Set, S/F of LED Light and Reparing of H.M.Lighting system with related cabling works etc. at N.M.Y. Mohommadi (Lakhimpur). | 28-Sep-2018 10:00 AM | 250.00 | | |
147 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_253823_1 | E/M/325/1042Q | S/F of 150Ltr. Capacity 02 Nos. water Cooler, RO. Water Purifier 02 Nos., KVA Steblizer, Construction of water cooler case, G.I. Pipe line and cabling work at Kissan Bazar Gomti Nagar, Lucknow. | 28-Sep-2018 10:00 AM | 250.00 | | |
148 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_252670_1 | E/M/325/1042A | S/F of 150 Ltr. Capacity 05 Nos. water cooler. RO water purifie, 05 No.External Electrification, LED light, Pole painting and cabling work and L.E.D. Light on old high mast light etc. at N.M.Y. Satanpur Mandi and S/F of 150 Ltr. Capacity 02 Nos. wa | 28-Sep-2018 10:30 AM | 533.32 | | |
149 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_252692_1 | E/M/325/1042B | S/F of 02 Nos LED High Mast Light and repair work of external electrification LED light pole painting with cabeling work | 28-Sep-2018 10:30 AM | 293.79 | | |
150 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_252927_1 | E/M/325/1042C | Construction of L.T.Line,LED street light on pole and Cabling Works and s/i/t/c of 2 Nos. 16 Mtr.High Mast Lighting System t at N.M.Y. Safdarganj ,Barabanki. | 28-Sep-2018 10:30 AM | 352.15 | | |
151 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_252932_1 | E/M/325/1042F | S/F of LED light in 30M highmast , 150 Litre capacity water cooler and repairing of LT line at NMY Bahraich. | 28-Sep-2018 10:30 AM | 332.20 | | |
152 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_263159_1 | E/M/325/1237A | Internal Electrification in Pump House at NMY Mihirpurwa, Distt. Bahraich. | 17-Oct-2018 03:00 PM | 250.00 | | |
153 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_263191_1 | E/M/325/1237B | Construction of Tubewell size 300mm. X 200mm. And S/F of 15 H.P. Submersible Pump at Kissan Mandi Bhawan, LKO. | 17-Oct-2018 03:00 PM | 306.39 | | |
154 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_263209_1 | E/M/325/1237C | S/F of LED Light on High mast and Steel Tubular Pole, wiring in toilet block ,control panel and RO and Cabling works etc. at NMY Fish Market, Lucknow | 17-Oct-2018 03:00 PM | 250.00 | | |
155 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_263224_1 | E/M/325/1237D | Internal Electrification inToilet Block-02 No. at NMY Arrah Pahadpur, Distt. Farukhabad | 17-Oct-2018 03:00 PM | 250.00 | | |
156 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_263240_1 | E/M/325/1237E | Internal Electrification inToilet Block-02 No. at NMYHardoi Distt. Hardoi | 17-Oct-2018 03:00 PM | 250.00 | | |
157 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_263252_1 | E/M/325/1237F | Internal Electrification in different type shops and Building at N.M.Y Kernailganj Distt. Gonda. | 17-Oct-2018 03:00 PM | 250.00 | | |
158 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_263405_1 | E/M/325/1237G | CONSTRUCTION OF TUBE WELL SIZE 300mm x 200mm and S/F of 15 H.P Submersible Pump AT N.M.Y. Mihipurwa (Bahraich) | 17-Oct-2018 05:00 PM | 250.00 | | |
159 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_263263_1 | E/M/325/1237F | Internal Electrification in different Type Shops , Repairing and extention of L.T. Line at NMY Nawab ganj. Distt. Gonda | 18-Oct-2018 01:00 PM | 254.85 | | |
160 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_263741_1 | E/M/325/1237G | Internal And External Electrifiication in 1000 MT Godown at NMY Gonda. | 18-Oct-2018 01:00 PM | 250.00 | | |
161 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_263809_1 | E/M/325/1237H | Internal Electrification in Different Type Shops, Supper market and Toilet Block Etc. Or Rewiring of Internal electrification in office building at N.M.Y (F/V and Grain) Gonda. Distt. Gonda | 18-Oct-2018 04:15 PM | 426.63 | | |
162 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_281344_1 | E/M(325)/2018-1566 | Annual Comprehensive Maintenance and Operation of 680 Ton A.C. Plant Systen Installed at NMY Kissan Mandi Bhawan | 11-Dec-2018 10:00 AM | 326.92 | | |
163 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_283637_1 | E/MVHT/2018-1597 | S/I/T/C of 2.5 MT Capacity VHT Machine with related work and Puff Paneling at Mango Pack House , Rahmankhera, Lucknow | 14-Dec-2018 03:00 PM | 4576.94 | | |
164 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_287962_1 | E/M(325)/2018-1665 | Internal Electrification in ModernToilet Block 3Nos. at NMY Chibramau | 27-Dec-2018 10:30 AM | 250.00 | | |
165 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_287982_1 | E/M(325)/2018-1665-I | Decoration Of Kissan Mandi Bhawan Building, Gomti Nagar, Lucknow on Republic Day, 2019 | 27-Dec-2018 10:30 AM | 250.00 | | |
166 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2018_RKUMP_287998_1 | E/M(325)/2018-1665 | Internal Electrification in ModernToilet Block and its related work at NMY Bangermau,Unnao | 27-Dec-2018 10:30 AM | 250.00 | | |
167 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_293972_2 | E/M(EOI)/2019-1744 | Selection Of consultancy Agency as PMC for the Design, tendering, Technical Project Supervision During execution and construction of Modern Cold Storage, Ripening Facilities And other Paraphernalia At 26 Selected APMC in UP. | 12-Jan-2019 10:00 AM | 250.00 | | |
168 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_295645_1 | E/M(325)/2018-1803 | Supply/I/T/C of Full Colour Ticker Board Display Addressing system at Various Mandies in UP | 17-Jan-2019 12:00 PM | 250.00 | | |
169 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_296874_1 | E/M(325)/2019-1794 | Repairing of HT/LT Line,with arial Bunch condutor and cabling works at NMY. Barabanki | 24-Jan-2019 10:00 AM | 484.74 | | |
170 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_296899_1 | E/M(325)/2019-1794 | Rewirig of Enternal Electrification of A.P.F. 5 Nos. and S/F of 150Ltr. Capacity 02 Nos. water Cooler, RO. Water Purifier 02 Nos., KVA Steblizer, Construction of water cooler case, G.I. Pipe line and cabling work at NMY. Barabanki. | 24-Jan-2019 10:00 AM | 250.00 | | |
171 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_296916_1 | E/M(325)/2019-1794 | Repair work of enternal electrfication in guest house, Office, F.R.H. and LED Light on old High mast at N.M.Y. Jaswant Nagar, Etawah | 24-Jan-2019 10:00 AM | 383.38 | | |
172 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_296928_1 | E/M(325)/2019-1794 | Repair work of L.T. Line, LED Light, Pole Painting, Cabling Work and S/I of 25KVA silent D.G. Set with related cabling works etc. at N.M.Y. Jaswant Nagar, Distt . Etawah | 24-Jan-2019 10:00 AM | 310.19 | | |
173 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_296937_1 | E/M(325)/2019-1794 | S/F LED Light in Existing, High Mast Lighting system 04 nos. and LED Street on Pole at N.M.Y. Unnao. | 24-Jan-2019 10:00 AM | 250.00 | | |
174 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_296941_1 | E/M(325)/2019-1794 | S/F of 150 Ltr. Capacity 03 Nos. water cooler with RO System and External Electrification, LED Light and Internal Electrification in APF. 12 X 88m -1No. with cabling work at N.M.Y. Shamshabad, Kaimganj Distt. Farukhabad. | 24-Jan-2019 10:00 AM | 250.00 | | |
175 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_297844_1 | E/M(325)/2019-1794 | External Electrification and Internal Electrifiication in Office Building, A.P.F., C Type Shop-06 No., Godown, Guard Roomat NMY Pihani Distt.-Hardoi. | 24-Jan-2019 10:00 AM | 250.00 | | |
176 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_297865_1 | E/M(325)/2019-1794 | S/F of Cantilever Retro Reflective Sign Board 02 nos. at SMY Pihani, Shahabad Distt. Hardoi. | 24-Jan-2019 10:00 AM | 250.00 | | |
177 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_300076_1 | E/M(VHT)/2019-1821 | S/I/T/C of 2.5 MT Capacity VHT Machine with related work and Puff Paneling at Mango Pack House, Rahmankhera, Lko. | 28-Jan-2019 06:30 PM | 4576.94 | | |
178 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_303958_1 | E/M(325)/2019-1871 | Supply/I/T/C of Full Colour Ticker Board Display Addressing system at Various Mandies in UP | 05-Feb-2019 06:00 PM | 250.00 | | |
179 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_313259_1 | E/M(325)/2019-1911 | S/F of Cantilever Retro Reflective Sign Board 02 nos. at SMY Pihani, Shahabad Distt. Hardoi. | 21-Feb-2019 10:30 AM | 250.00 | | |
180 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_313280_1 | E/M(325)/2019-1911 | Internal and External Electrification and S/F of LED Light at NMY Laherpur | 21-Feb-2019 10:30 AM | 250.00 | | |
181 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_313299_1 | E/M(325)/2019-1911 | Internal and External Electrification and S/F of LED Light at NMY Sitapur. | 21-Feb-2019 10:30 AM | 250.00 | | |
182 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_313318_1 | E/M(325)/2019-1911 | Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri. | 21-Feb-2019 10:30 AM | 250.00 | | |
183 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_313336_1 | E/M(325)/2019-1911 | Internal Electrification in Toilet Block and its related work at NMY Madhoganj. | 21-Feb-2019 10:30 AM | 250.00 | | |
184 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_313366_1 | E/M(325)/2019-1911 | Internal wiring in Modern Toilet Block 01 nos. at NMY Kaimganj, Distt. Farukhabad. | 21-Feb-2019 10:30 AM | 250.00 | | |
185 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_313453_1 | E/M(325)/2019-1911 | Repairing of H.T./ L.T. Line, Rewiring of Internal electrification in defferent Type Buildings / Shops and Constrution of Tubwell 02 Nos. and S/F of 1 HP. Submersible Pump at NMY Kesarganj, Bahraich. | 21-Feb-2019 10:30 AM | 291.10 | | |
186 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_313482_1 | E/M(325)/2019-1911 | Internal Electrification in Toilet Block works etc. at NMY Bahraich. | 21-Feb-2019 10:30 AM | 250.00 | | |
187 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_315539_1 | E/M(325)/2019-1911 | Internal Eiectrification in office Building,Guest House and vipdan room and Extension of LT Line /External Electrification and Double Pole Structure, Cabling Work etc at NMY Baripal Kanpur. | 21-Feb-2019 10:30 AM | 265.38 | | |
188 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_315569_1 | E/M(325)/2019-1911 | Repaiting of LT Line and S/F of Street Light at NMY Achhalda Distt. Auraiya. | 21-Feb-2019 10:30 AM | 250.00 | | |
189 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_315639_1 | E/M(325)/2019-1911 | S/F of 150 Ltr. Capacity 02 Nos. water cooler,RO water purifier 02 Nos., 4 KVA Steblizer, Construction of water cooler case and cabling work at NMY Unnao. | 21-Feb-2019 10:30 AM | 250.00 | | |
190 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_315746_1 | E/M(325)/2019-1911 | Repairing of LT.Line ,wire tightening , pole painting, LED Light on pole, 02 Nos. 16 Metre High Mast Light and Lighting arrangement in APF etc. at NMY Purwa, Distt. Unnao. | 21-Feb-2019 10:30 AM | 250.00 | | |
191 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_315787_1 | E/M(325)/2019-1911 | S/F of GI Pole, LED Light,Cabling works etc. OR Internal Electrification in Office Building, C Type Shops 05 Nos, Check Post, Toilet Block in APC 02 Nos, Etc. at S.M.Y Bighapur Distt. Unnao | 21-Feb-2019 10:30 AM | 250.00 | | |
192 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_315812_1 | E/M(325)/2019-1911 | S/F of Cantilever Retro Reflective Sign Board 02 nos. at SMY Bighapur, Purwa. | 21-Feb-2019 10:30 AM | 250.00 | | |
193 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_315835_1 | E/M(325)/2019-1911 | Supply installation, demonstration and amp commissioning of Computerized Scada PLC based Seed Pre cleaner , Grain cleaner with Elevator Capacity 3TPH at NMY. Grain Gonda | 21-Feb-2019 10:30 AM | 250.00 | | |
194 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_317081_1 | E/M(325)/2019-1960 | Rewirig of Enternal Electrification of A.P.F. 5 Nos. and S/F of 150Ltr. Capacity 02 Nos. water Cooler, RO. Water Purifier 02 Nos, KVA Steblizer, Construction of water cooler case, G.I. Pipe line and cabling work at NMY. Barabanki. | 22-Feb-2019 10:00 AM | 250.00 | | |
195 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_317116_1 | E/M(325)/2019-1960 | Repair work of L.T. Line, LED Light, Pole Painting, Cabling Work and S/I of 25KVA silent D.G. Set with related cabling works etc. at N.M.Y Jaswant Nagar, Distt . Etawah. | 22-Feb-2019 10:00 AM | 310.19 | | |
196 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_318335_1 | E/M(325)/2019-1960 | Repairing of HT/LT Line,with arial Bunch condutor and cabling works at NMY. Barabanki. | 22-Feb-2019 01:30 PM | 484.74 | | |
197 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_318763_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Tikonia. | 25-Feb-2019 10:00 AM | 250.00 | | |
198 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_318867_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Tirwaganj. | 25-Feb-2019 10:00 AM | 250.00 | | |
199 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_318911_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Kesarganj. | 25-Feb-2019 10:00 AM | 250.00 | | |
200 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_320319_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Dubagga. | 25-Feb-2019 10:00 AM | 250.00 | | |
201 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_320399_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Achhalda. | 25-Feb-2019 10:00 AM | 250.00 | | |
202 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_320450_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Dibiyapur. | 25-Feb-2019 10:00 AM | 250.00 | | |
203 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_320484_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Mohammadabad. | 25-Feb-2019 10:00 AM | 250.00 | | |
204 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_320535_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mahmudabad. | 25-Feb-2019 10:00 AM | 382.32 | | |
205 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_322186_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Chibramau. | 25-Feb-2019 12:30 PM | 382.32 | | |
206 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_322229_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Farukhabad. | 25-Feb-2019 12:40 PM | 382.32 | | |
207 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_322261_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Kannauj. | 25-Feb-2019 12:55 PM | 382.32 | | |
208 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_322290_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Madhoganj. | 25-Feb-2019 01:10 PM | 382.32 | | |
209 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_322320_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mohammadi. | 25-Feb-2019 01:20 PM | 382.32 | | |
210 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_322354_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Shahabad. | 25-Feb-2019 01:35 PM | 382.32 | | |
211 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_322375_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Sandila. | 25-Feb-2019 01:45 PM | 382.32 | | |
212 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_322401_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Kernailganj. | 25-Feb-2019 02:10 PM | 382.32 | | |
213 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_322441_1 | E/M(325)/2019-1941 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Jaswantnagar. | 25-Feb-2019 02:15 PM | 382.32 | | |
214 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335499_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mahmudabad. | 09-Mar-2019 05:00 PM | 382.32 | | |
215 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335523_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Chibramau. | 09-Mar-2019 05:00 PM | 382.32 | | |
216 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335541_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Farukhabad. | 09-Mar-2019 05:00 PM | 382.32 | | |
217 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335557_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Kannauj. | 09-Mar-2019 05:00 PM | 382.32 | | |
218 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335565_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Madhoganj. | 09-Mar-2019 05:00 PM | 382.32 | | |
219 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335572_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mohammadi. | 09-Mar-2019 05:00 PM | 382.32 | | |
220 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335581_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Shahabad. | 09-Mar-2019 05:00 PM | 382.32 | | |
221 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335589_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Sandila. | 09-Mar-2019 05:00 PM | 382.32 | | |
222 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335598_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Krenailganj. | 09-Mar-2019 05:00 PM | 382.32 | | |
223 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335607_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Jaswantnagar. | 09-Mar-2019 05:00 PM | 382.32 | | |
224 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335614_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Tikonia. | 09-Mar-2019 05:00 PM | 250.00 | | |
225 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335628_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY Tirwaganj. | 09-Mar-2019 05:00 PM | 250.00 | | |
226 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335639_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Kesarganj. | 09-Mar-2019 05:00 PM | 250.00 | | |
227 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335654_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Dubagga. | 09-Mar-2019 05:00 PM | 250.00 | | |
228 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335666_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Achalda. | 09-Mar-2019 05:00 PM | 250.00 | | |
229 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335675_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Dibiyapur. | 09-Mar-2019 05:00 PM | 250.00 | | |
230 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335687_1 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Mohammadabad. | 09-Mar-2019 05:00 PM | 250.00 | | |
231 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_335499_2 | E/M(325)/2019-2062 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mahmudabad. | 09-Mar-2019 05:00 PM | 382.32 | | |
232 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_337512_1 | E/M(325)/2019-2066 | Providing Man Power Services of Electrician, Lift Operater and Pump Operater at Kissan Mandi Bhawan Gomti Nagar, Lko. | 18-Mar-2019 10:00 AM | 277.53 | | |
233 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_337519_1 | E/M(325)/2019-2066 | Operation of Fire Fighting and fire Alarm System at Kissan Mandi Bhawan, Gomti Nagar Lko | 18-Mar-2019 10:00 AM | 250.00 | | |
234 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_336757_1 | E/M(325)/2019-2066 | Internal and External Electrification and S/F of LED Light at NMY Sitapur. | 20-Mar-2019 10:00 AM | 250.00 | | |
235 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_336781_1 | E/M(325)/2019-2066 | Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri. | 20-Mar-2019 10:00 AM | 250.00 | | |
236 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_336791_1 | E/M(325)/2019-2066 | S/F of Cantilever Retro Reflective Sign Board 02 nos. at SMY Pihani, Shahabad Distt. Hardoi. | 20-Mar-2019 10:00 AM | 250.00 | | |
237 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_336803_1 | E/M(325)/2019-2066 | S/F of Cantilever Retro Reflective Sign Board 02 nos. at SMY Pali, Shahabad Distt. Hardoi. | 20-Mar-2019 10:00 AM | 250.00 | | |
238 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_337183_1 | E/M(325)/2019-2066 | Internal / External Electrification work s/f of 1 No. Semi High Mast Light at N.M.Y Maigalganj Distt. Lakhimpur Kheri. | 20-Mar-2019 10:00 AM | 250.00 | | |
239 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_337185_1 | E/M(325)/2019-2066 | S/E of 01 No Over Head Type Retro Reflective High Intensity Sign Board on Main Gate and 01 No Cantilever Type Retro Reflective High Intensity Sign Board on Main Road at NMY. Bangarmau Distt. Unnao. | 20-Mar-2019 10:00 AM | 250.00 | | |
240 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_337414_1 | E/M(325)/2019-2066 | NMY BARIPAL, Distt. Kanpur Nagar. | 20-Mar-2019 10:00 AM | 250.00 | | |
241 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_337422_1 | E/M(325)/2019-2066 | Extention of LT Line for Service Connection, S/F of Street LED Light etc. work AMH Paraukh NMY RURA Distt. Kanpur Dehat. | 20-Mar-2019 10:00 AM | 250.00 | | |
242 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_337523_1 | E/M(325)/2019-2066 | Internal electrification in B type shop 14 Nos. check post 02 Nos. Godown 01 No.,Rewiring of staff Qtr. And Lighting System around Pounds at NMY Barabanki. | 20-Mar-2019 10:00 AM | 321.05 | | |
243 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_337627_1 | E/M(325)/2019-2066 | Internal / External Electrifiication in Office Building, A.P.F., C Type Shop 06 No., Godown, Guard Room at NMY. Pali Distt. Hardoi. | 20-Mar-2019 10:00 AM | 250.00 | | |
244 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_337663_1 | E/M(325)/2019-2066 | Repairing / Rewiring of residance type staff quarter, check post, pump house, APF,office, farmer rest house, toilet block and guest house at N.M.Y. Bangarmau,Unnao. | 20-Mar-2019 10:00 AM | 250.00 | | |
245 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_350821_1 | E/M(325)/2019-20-281 | Internal electrification in B type shop 14 Nos. check post 02 Nos. Godown 01 No.,Rewiring of staff Qtr. And Lighting System around Pounds at NMY Barabanki. | 07-Jun-2019 10:00 AM | 321.05 | | |
246 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_350862_1 | E/M(325)/2019-20-281 | Internal / External Electrification work s/f of 1 No. Semi High Mast Light at N.M.Y Maigalganj Distt. Lakhimpur Kheri. | 07-Jun-2019 10:00 AM | 250.00 | | |
247 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_350892_1 | E/M(325)/2019-20-281 | S/F of 150 Ltr. Capacity 03 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Case and other related Work at NMY BARIPAL, Distt. Kanpur Nagar. | 07-Jun-2019 10:00 AM | 250.00 | | |
248 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_350944_1 | E/M(325)/2019-20-281 | Extention of LT Line for Service Connection S/F of Street LED Light etc work AMH Paraukh NMY RURA Distt Kanpur Dehat | 07-Jun-2019 10:00 AM | 250.00 | | |
249 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_350978_1 | E/M(325)/2019-20-281 | Internal / External Electrifiication in Office Building, A.P.F , C Type Shop 06 No, Godown, Guard Room at NMY Pali Distt. Hardoi. | 07-Jun-2019 10:00 AM | 250.00 | | |
250 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_350994_1 | E/M(325)/2019-20-281 | Internal and External Electrification and S/F of LED Light at NMY Sitapur. | 07-Jun-2019 10:00 AM | 250.00 | | |
251 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351025_1 | E/M(325)/2019-20-281 | Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri | 07-Jun-2019 10:00 AM | 250.00 | | |
252 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351165_1 | E/M(325)/2019-20-281 | Operation of Fire Fighting and fire Alarm System at Kissan Mandi Bhawan, Gomti Nagar Lko. | 07-Jun-2019 10:00 AM | 250.00 | | |
253 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351173_1 | E/M(325)/2019-20-281 | Providing Man Power Services of Electrician, Lift Operater and Pump Operater at Kissan Mandi Bhawan Gomti Nagar, Lko | 07-Jun-2019 10:00 AM | 277.53 | | |
254 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351180_1 | E/M(325)/2019-20-281 | Operation of DG Set 40 KVA with distribution Panel all Window AC etc, 24 Hrs. Operation at Kissan Mandi Bhawan, Gomti Nagar Lko | 07-Jun-2019 10:00 AM | 250.00 | | |
255 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351186_1 | E/M(325)/2019-20-281 | Repairing / Rewiring of residance type staff quarter, check post, pump house, APF,office, farmer rest house, toilet block and guest house at N.M.Y. Bangarmau,Unnao. | 07-Jun-2019 10:00 AM | 250.00 | | |
256 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351194_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Krenailganj. | 07-Jun-2019 10:00 AM | 382.32 | | |
257 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351197_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Sandila. | 07-Jun-2019 10:00 AM | 382.32 | | |
258 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351200_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Shahabad. | 07-Jun-2019 10:00 AM | 382.32 | | |
259 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351203_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mohammadi. | 07-Jun-2019 10:00 AM | 382.32 | | |
260 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351204_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Madhoganj. | 07-Jun-2019 10:00 AM | 382.32 | | |
261 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351491_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Kannauj. | 07-Jun-2019 10:00 AM | 382.32 | | |
262 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351505_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Farukhabad. | 07-Jun-2019 10:00 AM | 382.32 | | |
263 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351522_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mahmudabad. | 07-Jun-2019 10:00 AM | 382.32 | | |
264 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351549_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Chibramau. | 07-Jun-2019 10:00 AM | 382.32 | | |
265 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351573_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Jaswantnagar. | 07-Jun-2019 10:00 AM | 382.32 | | |
266 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351593_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Tikonia. | 07-Jun-2019 10:00 AM | 250.00 | | |
267 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351603_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY Tirwaganj | 07-Jun-2019 10:00 AM | 250.00 | | |
268 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351611_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Kesarganj. | 07-Jun-2019 10:00 AM | 250.00 | | |
269 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351617_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Dubagga | 07-Jun-2019 10:00 AM | 250.00 | | |
270 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351624_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Achalda. | 07-Jun-2019 10:00 AM | 250.00 | | |
271 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351779_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Dibiyapur. | 07-Jun-2019 01:00 PM | 250.00 | | |
272 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_351790_1 | E/M(325)/2019-297 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Mohammadabad. | 07-Jun-2019 01:10 PM | 250.00 | | |
273 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_361419_1 | E/M(325)/2019-443 | Internal / External Electrifiication in Office Building, A.P.F., C Type Shop 06 No., Godown, Guard Room at NMY. Pali Distt. Hardoi | 06-Jul-2019 01:35 PM | 250.00 | | |
274 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_361533_1 | E/M(325)/2019-443 | Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri | 06-Jul-2019 02:30 PM | 250.00 | | |
275 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_361584_1 | E/M(325)/2019-443 | S/E of 01 No Over Head Type Retro Reflective High Intensity Sign Board on Main Gate and 01 No Cantilever Type Retro Reflective High Intensity Sign Board on Main Road at NMY. Bangarmau Distt. Unnao. | 06-Jul-2019 04:00 PM | 250.00 | | |
276 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_361628_1 | E/M(325)/2019-443 | Operation of Fire Fighting and fire Alarm System at Kissan Mandi Bhawan, Gomti Nagar Lko. | 06-Jul-2019 05:00 PM | 250.00 | | |
277 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_361640_1 | E/M(325)/2019-443 | Providing Man Power Services of Electrician, Lift Operater and Pump Operater at Kissan Mandi Bhawan Gomti Nagar, Lko | 06-Jul-2019 05:15 PM | 277.53 | | |
278 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_361660_1 | E/M(325)/2019-443 | Internal wiring in Store Room and Lighting System at NMYMango Pack House, Rahman Khera, Lko | 06-Jul-2019 06:00 PM | 250.00 | | |
279 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_362085_1 | E/M(325)/2019-443 | Internal Electrification in Toilet Block and its related work at NMY Uttaripura, Distt. Kanpur Dehat. | 08-Jul-2019 04:30 PM | 250.00 | | |
280 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_365557_1 | E/M/325/2019-20-627 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Sitapur Road Lko. | 20-Jul-2019 03:00 PM | 264.02 | | |
281 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_365599_1 | E/M/325/2019-20-627 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Kaimganj, Farukhabad. | 20-Jul-2019 03:00 PM | 264.02 | | |
282 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_365606_1 | E/M/325/2019-20-627 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Paliya, Khiri. | 20-Jul-2019 03:00 PM | 264.02 | | |
283 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_365611_1 | E/M/325/2019-20-627 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Bahraich. | 20-Jul-2019 03:00 PM | 264.02 | | |
284 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_365294_1 | E/M/325/2019-20-542 | S/I/T/C of VHT Machine Capacity 2500 Kg Batch along with all accessories at Mango Pack House facility Rehmenkhera Lucknow. | 20-Jul-2019 05:00 PM | 4198.06 | | |
285 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_367033_1 | E/M/325/2019-20-693 | Decoration of Kisan Mandi Bhawan, Gomti Nagar, Lucknw on Independence Day 2019 | 26-Jul-2019 10:00 AM | 250.00 | | |
286 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_367071_1 | E/M/325/2019-20-689 | Internal wiring in Store Room and Lighting System at NMYMango Pack House, Rahman Khera, Lko. | 26-Jul-2019 10:30 AM | 250.00 | | |
287 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_367098_1 | E/M(325)/2019-689 | Providing Man Power Services of Electrician, Lift Operater and Pump Operater at Kissan Mandi Bhawan Gomti Nagar, Lko | 26-Jul-2019 10:30 AM | 277.53 | | |
288 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_367524_1 | E/M/325/2019-20-693 | Repairing work of L.T. Line, LED Light, Pole Painting, Cabling Work at N.M.Y, Bharthana, Distt. Etawah. | 27-Jul-2019 10:00 AM | 328.62 | | |
289 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_367535_1 | E/M/325/2019-20-693 | S/F of LED flood light on old high mast with Cabling, main Switch etc. Work and S/F of 15 H.P Submersible Pump AT N.M.Y. Bharthna,Etawah. | 27-Jul-2019 10:00 AM | 250.00 | | |
290 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_367616_1 | E/M/325/2019-20-689 | Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri | 27-Jul-2019 10:30 AM | 250.00 | | |
291 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_367622_1 | E/M/325/2019-20-689 | Internal / External Electrifiication in Office Building, A.P.F., C Type Shop 06 No., Godown, Guard Room at NMY. Pali Distt. Hardoi | 27-Jul-2019 10:30 AM | 250.00 | | |
292 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_367638_1 | E/M/325/2019-20-712 | Supply / Installation / Testing / Commissoning of VHT PLANT And Its related work at Mango Pack House RahmanKhera Lko. | 27-Jul-2019 01:00 PM | 4850.00 | | |
293 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_367895_1 | E/M 325/2019-443 /E/M 325/2019-689 DATED 22-07-19 | Internal Electrifiication in Toilet Block at NMY UttaripuraDistt.- Kanpur | 27-Jul-2019 05:30 PM | 250.00 | | |
294 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_374094_1 | E/M/325/2019-20-803 | Modernisation/Upgradation of 03 Nos. Passenger Lift 09 Stops Capacity, 13 Passenger 884Kg. Installed in Kissan Mandi Bhawan Gomti Nagar Lko. | 22-Aug-2019 02:40 PM | 588.68 | | |
295 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_378287_1 | E/M/325/2019-20-899 | Comprehensive Maintenance and Operation work of 1 No. 50 Mt. and 25 Mt. Electronic Computerized Weigh Bridge installed in Different Mandi Yards of U.P. | 05-Sep-2019 10:00 AM | 250.00 | | |
296 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_378329_1 | E/M/325/2019-20-916 | Providing Man Power Services of Electrician, Lift Operater and Pump Operater at Kissan Mandi Bhawan Gomti Nagar, Lko | 05-Sep-2019 10:00 AM | 277.53 | | |
297 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_378334_1 | E/M/325/2019-20-916 | Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri | 05-Sep-2019 10:00 AM | 250.00 | | |
298 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_378338_1 | E/M/325/2019-20-916 | Internal wiring in Store Room and Lighting System at NMY Mango Pack House, Rahman Khera, Lko. | 05-Sep-2019 04:00 PM | 250.00 | | |
299 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_378795_1 | E/M/325/2019-20-920 | Comprehensive Maintenance of 01 No. VIP Lift and 03 Nos. Passenger Lifts at Kisan Mandi Bhawan Vibhuti Khand Gomti Nagar Lko. | 06-Sep-2019 01:00 PM | 250.00 | | |
300 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_387134_1 | E/M/325/2019-20-1064 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Bahraich. | 01-Oct-2019 11:00 AM | 264.02 | | |
301 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_387186_1 | E/M/325/2019-20-1064 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Paliya, Khiri. | 01-Oct-2019 11:00 AM | 264.02 | | |
302 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_387606_1 | E/M/325/2019-20-1064 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Kaimganj, Farukhabad. | 01-Oct-2019 03:30 PM | 264.02 | | |
303 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_387774_1 | E/M/325/2019-20-1064 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Sitapur Road Lko | 03-Oct-2019 02:00 PM | 264.02 | | |
304 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_388773_1 | E/M/325/2019-20-1086 | Modernisation/Upgradation of 03 Nos. Passenger Lift 09 Stops Capacity, 13 Passenger 884Kg. Installed in Kissan Mandi Bhawan Gomti Nagar Lko. | 04-Oct-2019 02:00 PM | 588.68 | | |
305 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_393893_1 | E/M/325/2019-20-1189 | Outsouricing of Man Power Services at Kissan Mandi Bhawan, Vibuti Khand, Gomti Nagar LKO | 18-Oct-2019 02:40 PM | 277.53 | | |
306 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_398838_1 | E/M/325/2019-20-1230 | Modernisation/Upgradation of 03 Nos. Passenger Lift 09 Stops Capacity, 13 Passenger 884Kg. Installed in Kissan Mandi Bhawan Gomti Nagar Lko. | 02-Nov-2019 11:45 AM | 588.68 | | |
307 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_398845_1 | E/M/325/2019-20-1276 | Outsouricing of Man Power Services at Kissan Mandi Bhawan, Vibuti Khand, Gomti Nagar LKO | 02-Nov-2019 12:30 PM | 277.53 | | |
308 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_398865_1 | E/M/325/2019-20-1218 | S/F of Cubical Box, Stay Set and Cabling Works etc. At NMY Fish Market, hardoi Road, Lko. | 02-Nov-2019 12:35 PM | 250.00 | | |
309 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_399545_1 | E/M/325/2019-20-1218 | Internal/External Electrification in 1000 MT. Godown at N.M.Y. F/V Gonda Distt. Gonda. | 04-Nov-2019 04:30 PM | 250.00 | | |
310 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_399567_1 | E/M/325/2019-20-1218 | Internal Electrification in Toilet Block works etc. at NMY Barabanki | 04-Nov-2019 05:40 PM | 250.00 | | |
311 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_399631_1 | E/M/325/2019-20-1218 | Supply, installation, demonstration and amp commissioning of Computerized Scada PLC based Seed Pre cleaner / Grain cleaner with Elevator Capacity 3TPH at NMY Grain Gonda . | 04-Nov-2019 06:30 PM | 250.00 | | |
312 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_400166_1 | E/M/325/2019-20-1218 | Repair work of Rewiring Internal Electrification in A types shop 10 Nos. B type shop 10 Nos. C types shop 10 Nos. Staff Quarter 1 4 Nos., police chowki, Check Post 02 Nos. at N.M.Y. Kaimganj, District Farukhabad | 05-Nov-2019 06:15 PM | 250.00 | | |
313 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_400215_1 | E/M/325/2019-20-1218 | Internal Wiring in Office Building Farmer Rest House, Police Chowki, CheckPost 02 Nos. A Type Shop 2 Nos, B Type Shop 8 Nos, C Type Shop 14 Nos. APF 12X88 02 Nos. Sachiv Awas etc. at NMY Kamalganj. Distt. Farukhabad | 06-Nov-2019 12:00 PM | 250.00 | | |
314 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_400510_1 | E/M/325/2019-20-1218 | Internal Electrification Work in E NAM building, FRH, Canteen, Building at Modernise NMY Kaimganj, District Farukhabad | 06-Nov-2019 01:45 PM | 286.08 | | |
315 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_400428_1 | E/M/325/2019-20-1218 | S/F of 02 Nos LED High Mast Light and LED light on old High mast Light 16meter with accessories and LED Light on pole with cabling work at Modernised at NMY Kaimganj Distt. Farrukhabad. | 06-Nov-2019 02:20 PM | 268.37 | | |
316 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_400555_1 | E/M/325/2019-20-1218 | Internal Electrification Work in E-NAM building, FRH, Canteen, Building at Modernise NMY, Pailya District Kheeri | 06-Nov-2019 03:30 PM | 755.63 | | |
317 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_400585_1 | E/M/325/2019-20-1218 | Internal Electrification in Farmer Rest House at NMY Gola Distt. Lakhimpur | 06-Nov-2019 03:50 PM | 250.00 | | |
318 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_400603_1 | E/M/325/2019-20-1218 | Repairing of LT Line, Painting of Pole, S/F LED Street Light Fittings, S/I/T/C of 2 No. High Mast at NMY, Paila Distt. Kheeri | 06-Nov-2019 04:30 PM | 250.24 | | |
319 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_401007_1 | E/M/325/2019-20-1218 | Internal Electrification Work in building, C type shop 2 Nos, Toilet Block, check post and A.P.F. at Modernise NMY,Mishrikh District Sitapur | 07-Nov-2019 02:00 PM | 359.29 | | |
320 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_401023_1 | E/M/325/2019-20-1218 | S/E of 02 No Over Head Retro Reflective Sign Board and 01 No Cantilever Type Retro Reflective Sign Board at NMY. Mishrikh Distt. Sitapur. | 07-Nov-2019 03:00 PM | 250.00 | | |
321 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_401060_1 | E/M/325/2019-20-1218 | Internal Electrification / Cu. Rewiring of B Type shop 15 No., C Type shop 75 No., Police Chauwki and S/F of High Mast Lightening system, Cabling etc. at N.M.Y. Bangermau Distt. Unnao. | 07-Nov-2019 03:30 PM | 290.18 | | |
322 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_401074_1 | E/M/325/2019-20-1218 | Repairing of LT Line and S/F of High Mast 02 Nos. and S/F of LED light on pole and S/F of 03 nos. Water Cooler with RO and 15 HP Submersibile Pump at N.M.Y.Payagpur Distt. Bahraich. | 07-Nov-2019 04:20 PM | 250.00 | | |
323 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_401187_1 | E/M/325/2019-20-1218 | S/E of 01 No Over Head Retro Reflective Sign Board and 02 No Cantilever Type Retro Reflective Sign Board at NMY. Payagpur Distt. Bahraich. | 07-Nov-2019 05:30 PM | 250.00 | | |
324 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_401224_1 | E/M/325/2019-20-1218 | Internal Electrifiication in Toilet Block at NMY Risiya Distt. Bahraich | 07-Nov-2019 06:30 PM | 250.00 | | |
325 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_401788_1 | E/M/325/2019-20-1218 | Construction of H.T./L.T line,Double Pole Structure,S/F of 250 KVA Transformer 2No.,LED street light on pole , S/F of40/25 KVA DG Set and cabling works etc at N.M.Y. Bhinga Distt.Bahrich . | 09-Nov-2019 10:30 AM | 1513.76 | | |
326 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_401855_1 | E/M/325/2019-20-1218 | Internal Electrification in Different type Buildings, Shops and APF and Cabling works etc at N.M.Y. Bhinga Distt.Bahrich | 09-Nov-2019 12:00 PM | 537.71 | | |
327 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_401883_1 | E/M/325/2019-20-1218 | Supply, installation, demonstration and amp commissioning of Computerized Scada PLC based Seed Pre cleaner / Grain cleaner with Elevator Capacity 3TPH at NMY Grain Gonda . | 09-Nov-2019 01:10 PM | 250.00 | | |
328 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_402520_1 | E/M/325/2019-20-1064 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Kaimganj, Farukhabad | 11-Nov-2019 06:50 PM | 264.02 | | |
329 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_402783_1 | E/M/325/2019-20-1064 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Sitapur Road, Lucknow. | 12-Nov-2019 05:20 PM | 264.02 | | |
330 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_402796_1 | E/M/325/2019-20-1064 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Palia Kheeri. | 12-Nov-2019 05:45 PM | 264.02 | | |
331 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_402801_1 | E/M/325/2019-20-1064 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Bahraich | 12-Nov-2019 05:50 PM | 264.02 | | |
332 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_406467_1 | E/M/325/2019-20-1365 | Repairing of Automatic Electronic Sorting/Grading Line, Hot Water Immersion Treatment unit, S/o Plastic Crates, Hydraulic Pallet, Air Circulator, Tubular Drying Fan and Vacuum Cleaning Machine etc. at Mango Pack House, Rehman Khera Lko. | 22-Nov-2019 10:00 AM | 250.00 | | |
333 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_409909_1 | E/M/325/2019-20-1385 | Comprehensive Maintenance and Operation of 680 Ton A.C. Plant installed at Kisan Mandi Bhawan, Gomti Nagar, Lko. | 03-Dec-2019 02:50 PM | 326.92 | | |
334 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_412491_1 | E/M/325/2019-20-1475 | Repair work of Rewiring Internal Electrification in A types shop 10 Nos. B type shop 10 Nos. C types shop 10 Nos. Staff Quarter 14 Nos., police chowki, Check Post 02 Nos. at N.M.Y. Kaimganj, District Farrukhabad | 11-Dec-2019 04:00 PM | 250.00 | | |
335 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_412503_1 | E/M/325/2019-20-1475 | Supply, installation, demonstration and amp commissioning of Computerised Scada PLC based Seed Pre cleaner / Grain cleaner with Elevator Capacity 3TPH at NMY Grain Gonda. | 11-Dec-2019 04:00 PM | 250.00 | | |
336 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_412794_1 | E/M/325/2019-20-1475 | Internal Wiring in Old A, B, C Type Shops, APF 12X88 and New C Type Shops, Tiolet Block , S/F of Water Cooler with RO System, Development of Tube well and Ext. of LT line and Lighting System etc. at NMY Sitapur Road, Lucknow. | 12-Dec-2019 02:00 PM | 1081.07 | | |
337 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_412831_1 | E/M/325/2019-20-1475 | Internal Electrification in Toilet Block works etc. at NMY Barabanki. | 12-Dec-2019 02:30 PM | 250.00 | | |
338 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_412945_1 | E/M/325/2019-20-1475 | Internal Electrification in Different type Buildings, Shops and APF and Cabling works etc at N.M.Y. Bhinga Distt.Bahrich | 12-Dec-2019 05:00 PM | 503.55 | | |
339 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2019_RKUMP_412959_1 | E/M/325/2019-20-1475 | Construction of H.T./L.T line,Double Pole Structure, S/F of 250 KVA Transformer 2No.,LED street light on pole, S/F of 40/25 KVA DG Set and cabling works etc at N.M.Y. Bhinga Distt.Bahrich . | 12-Dec-2019 05:00 PM | 1513.76 | | |
340 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_428927_1 | E/M/325/2020-1536 | Repair work of Rewiring Internal Electrification in A types shop 10 Nos. B type shop 10 Nos. C types shop 10 Nos. Staff Quarter 1 4 Nos., police chowki, Check Post 02 Nos. at N.M.Y. Kaimganj, District Farrukhabad. | 28-Jan-2020 06:00 PM | 250.00 | | |
341 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429254_1 | E/M/325/2020-1536 | Internal Wiring in Old A, B,C Type Shops, APF 12X88 and New C Type Shops, Tiolet Block , S/F of Water Cooler with RO System , Development of Tube well and Ext. of LT line and Lighting System etc. At NMY Sitapur Road. Lucknow. | 30-Jan-2020 10:00 AM | 1081.07 | | |
342 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429362_1 | E/M/325/2020-1536 | S/F of Modular Switch / Switch Boards, LED Lights / Fans, Gyser and its related Works etc. in Community center, Club, and Guest house at Mandi Parishad, Awasiya Colony, Vibhuti Khand, Gomti Nagar, Lucknow. | 30-Jan-2020 10:00 AM | 250.00 | | |
343 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429368_1 | E/M/325/2020-1536 | Internal Electrification in Residence 07 No Type 1 , 7 No Type 2, 1 No Type 3, Bank, Office building check post and cable connection etc. work at NMY GOLA . | 30-Jan-2020 10:00 AM | 250.00 | | |
344 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429372_1 | E/M/325/2020-1536 | S/F of 01 No.Cantilever Type Retro Reflective Sign Board at NMY Gola. | 30-Jan-2020 10:00 AM | 250.00 | | |
345 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429373_1 | E/M/325/2020-1536 | Internal/ External Electrification in office Building , A.P.F. C type shop 06 No. Godown , Guard Room at NMY Tambaur Distt. Sitapur | 30-Jan-2020 10:00 AM | 250.00 | | |
346 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429379_1 | E/M/325/2020-1536 | S/F of Water Cooler with RO System and its related Works At Kisan Mandi Bhawan, Gomti Nagar, Lko. | 30-Jan-2020 10:00 AM | 250.00 | | |
347 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429385_1 | E/M/325/2020-1536 | Repairing of L.T Line, Painting of Pole, S/F LED Street Light Fittings, S/I/T/C of 2 No. High Mast OR S/F of 150 Ltr. Capacity Water Cooler with RO System and its related Works at NMY Tikonia District Kheeri | 30-Jan-2020 10:00 AM | 250.00 | | |
348 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429387_1 | E/M/325/2020-1536 | S/E of 01 No Over Head Retro Reflective Sign Board and Cantilever Type Retro Reflective Sign Board 02 Nos. at NMY. Tikonia | 30-Jan-2020 10:00 AM | 250.00 | | |
349 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429448_1 | E/M/325/2020-1536 | Internal and External Electrification in Boys Hostel CSAU Kanpur. | 30-Jan-2020 12:30 PM | 304.95 | | |
350 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429482_1 | E/M/325/2020-1536 | S/F For Manual Alarm System at Boys Hostel C.S.A.U. Kanpur. | 30-Jan-2020 01:30 PM | 250.00 | | |
351 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429489_1 | E/M/325/2020-1536 | CONSTRUCTION OF TUBE WELL SIZE 200mm x 200mm and S/F of 7.5 H.P Submersible Pump AT N.M.Y. C.S.A.U. Kanpur. | 30-Jan-2020 01:30 PM | 250.00 | | |
352 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429505_1 | E/M/325/2020-1536 | Internal Electrification in Krishi Vipdan Office at NMY Kanpur. | 30-Jan-2020 01:40 PM | 250.00 | | |
353 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429520_1 | E/M/325/2020-1536 | S/E/T/C of High Mast 01 No. And S/F of LED Street Light on pole and painting of pole at SMY Akbarpur, Kanpur Dehat. | 30-Jan-2020 02:15 PM | 250.00 | | |
354 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429572_1 | E/M/325/2020-1536 | S/F of LED Street Flood Light, Main/ Sub Control Panel in KMB and Watch Tower and Electrification in Toilet Block and Cabling works and its related works at Kisan Mandi Bhawan Gomti Nagar Lko. | 30-Jan-2020 03:40 PM | 515.80 | | |
355 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_429585_1 | E/M/325/2020-1536 | S/F of LED flood Light on old H.M.Lighting system and on Pole and cabling works etc. at N.M.Y. Kisan Bazar, Vibhuti Khand, Gomti Nagar, Lucknow. | 30-Jan-2020 04:15 PM | 507.91 | | |
356 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_435552_1 | E/M/325/2020-1834 | S/F of LED Street Flood Light, Main/Sub Control Panel in KMB and Cabling works and its related works at Kisan Mandi Bhawan Gomti Nagar, Lko. | 15-Feb-2020 02:00 PM | 496.72 | | |
357 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_435565_1 | E/M/325/2020-1834 | S/F of LED Street Flood Light in Watch Tower and Electrification in Toilet Block and Cabling works and its related works at Kisan Mandi Bhawan Gomti Nagar, Lko. | 15-Feb-2020 02:30 PM | 250.00 | | |
358 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_435608_1 | E/M/325/2020-1834 | S/F of LED flood Light on old H.M.Lighting system and on Pole and cabling works etc. at N.M.Y. Kisan Bazar, Vibhuti Khand, Gomti Nagar, Lucknow. | 15-Feb-2020 03:15 PM | 455.99 | | |
359 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_435696_1 | E/M/325/2020-1834 | Internal Electrifiication in 01 No. Toilet Block at NMY KamalGanj Distt. Farrukhabad. | 15-Feb-2020 04:45 PM | 250.00 | | |
360 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_435705_1 | E/M/325/2020-1834 | Internal Electrification in 02 Nos.Toilet Block at NMY Etawah Distt. Etawah. | 15-Feb-2020 05:00 PM | 250.00 | | |
361 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_435714_1 | E/M/325/2020-1834 | Internal Electrification in 1 No.Toilet Block works etc. at NMY Bharthana Distt. Etawah. | 15-Feb-2020 05:15 PM | 250.00 | | |
362 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_436114_1 | E/M/325/2020-1830 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Sitapur Road, Lucknow | 17-Feb-2020 04:00 PM | 264.02 | | |
363 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_436188_1 | E/M/325/2020-1830 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Kaimganj, Farrukhabad. | 17-Feb-2020 05:30 PM | 264.02 | | |
364 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_436209_1 | E/M/325/2020-1830 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Palia, Kheeri. | 17-Feb-2020 05:50 PM | 264.02 | | |
365 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_436231_1 | E/M/325/2020-1830 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Bahraich. | 17-Feb-2020 06:15 PM | 264.02 | | |
366 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_437646_1 | E/M/325/2020-1811 | Extension/Re. of LT Line, S/F of Street LED Light and LED Light on 16 Metre High Mast Light 04 Nos, S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos. 4KVA Steblizer, GI Pipe line and cabling work at NMY Nanpara Distt. Behraich. | 20-Feb-2020 06:20 PM | 405.26 | | |
367 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_438327_1 | E/M/325/2020-1811 | S/E of 01 No Over Head Retro Reflective Sign Board and 02 No Cantilever Type Retro Reflective Sign Board at NMY. Nanpara Distt. Bahraich. | 22-Feb-2020 02:45 PM | 250.00 | | |
368 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_438341_1 | E/M/325/2020-1811 | S/E of 01 No Over Head Retro Reflective Sign Board and 02 No Cantilever Type Retro Reflective Sign Board at NMY. Bhinga Distt. Bahraich. | 22-Feb-2020 03:30 PM | 250.00 | | |
369 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_438386_1 | E/M/325/2020-1811 | Fire Detection and alarm system for admin Block at NMY Bhinga Distt. Bahraich. | 22-Feb-2020 03:50 PM | 250.00 | | |
370 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_438403_1 | E/M/325/2020-1811 | S/E of 01 No Over Head Retro Reflective Sign Board and 02 No Cantilever Type Retro Reflective Sign Board at NMY. Mihirpurwa Distt. Bahraich. | 22-Feb-2020 05:00 PM | 250.00 | | |
371 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_438452_1 | E/M/325/2020-1811 | S/E of 01 No Over Head Retro Reflective Sign Board and 01 No Cantilever Type Retro Reflective Sign Board at NMY. Kernailganj Distt. Gonda. | 22-Feb-2020 05:25 PM | 250.00 | | |
372 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_438498_1 | E/M/325/2020-1811 | Repairing of L.T Line, Painting of Pole, S/F LED Street Light Fittings, S/I/T/C of 2 No. High Mast at NMY, Pailya District Kheeri | 22-Feb-2020 06:00 PM | 250.24 | | |
373 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_438513_1 | E/M/325/2020-1811 | Repairing of L.T Line, Painting of Pole, S/F LED Street Light Fittings, S/I/T/C of 2 No. High Mast OR S/F of 150 Ltr. Capacity Water Cooler with RO System and its related Works at NMY, Tikonia District Kheeri | 22-Feb-2020 06:15 PM | 250.00 | | |
374 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_438538_1 | E/M/325/2020-1811 | CONSTRUCTION OF TUBE WELL SIZE 300mm x 200mm and S/F of 15 H.P Submersible Pump AT N.M.Y. Bhinga, Bahraich. | 22-Feb-2020 06:35 PM | 250.00 | | |
375 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_439087_1 | E/M/325/2020-1811 | CONSTRUCTION OF TUBE WELL SIZE 300mm x 200mm and S/F of 15 H.P Submersible Pump AT N.M.Y. Bhinga, Bahraich. | 24-Feb-2020 06:10 PM | 250.00 | | |
376 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440146_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY. Etawah. | 27-Feb-2020 10:00 AM | 417.60 | | |
377 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440149_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Kaimganj. | 27-Feb-2020 10:00 AM | 417.60 | | |
378 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440151_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Farukhabad. | 27-Feb-2020 10:00 AM | 417.60 | | |
379 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440156_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bharthana. | 27-Feb-2020 10:00 AM | 417.60 | | |
380 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440157_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur Road, Lucknow | 27-Feb-2020 10:00 AM | 417.60 | | |
381 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440160_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Lakhimpur. | 27-Feb-2020 10:00 AM | 417.60 | | |
382 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440161_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Gonda. | 27-Feb-2020 10:00 AM | 417.60 | | |
383 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440165_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Barabanki. | 27-Feb-2020 10:00 AM | 417.60 | | |
384 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440167_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur. | 27-Feb-2020 10:00 AM | 417.60 | | |
385 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440169_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Hardoi | 27-Feb-2020 10:00 AM | 417.60 | | |
386 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440172_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Naubasta | 27-Feb-2020 10:00 AM | 417.60 | | |
387 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_440058_1 | E/M/325/2020-1868 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY. Bangermau, Unnao. | 27-Feb-2020 10:30 AM | 417.60 | | |
388 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_441042_1 | E/M/325/2020-1860 | Internal and External Electrification in Boys Hostel CSAU Kanpur. | 28-Feb-2020 03:00 PM | 304.95 | | |
389 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_441071_1 | E/M/325/2020-1860 | S/F of 150 Ltr. Capacity 03 Nos. Water Cooler. 4 KVA Stebilizers, Construction of water cooler case and other related work. at N.M.Y. Uttaripura, District Kanpur Nagar. | 28-Feb-2020 03:15 PM | 250.00 | | |
390 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_441103_1 | E/M/325/2020-1860 | S/F For Manual Alarm System at Boys Hostel C.S.A.U. Kanpur. | 28-Feb-2020 03:30 PM | 250.00 | | |
391 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_441138_1 | E/M/325/2020-1860 | Internal Electrification Work in E-NAM building, FRH, Canteen, Building at Modernise NMY, Pailya District Kheeri | 28-Feb-2020 04:30 PM | 512.37 | | |
392 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_442660_1 | E/M/325/2020-1860 | Internal Electrification Work in E-NAM building, , Canteen, Drinking water facility, Building and Gate complex at Modernised NMY. Bahraich | 03-Mar-2020 03:15 PM | 284.60 | | |
393 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_444037_1 | E/M/325/2020-1976 | S/F of Water Cooler with RO System and its related Works At Kisan Mandi Bhawan, Gomti Nagar, Lko. | 05-Mar-2020 06:15 PM | 250.00 | | |
394 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_444061_1 | E/M/325/2020-1976 | S/F of Modular Switch / Switch Boards, LED Lights / Fans, Gyser and its related Works etc. in Community center, Club, Geust house and Community centre at Mandi Parishad, Awasiya Colony, Vibhuti Khand, Gomti Nagar, Lucknow. | 05-Mar-2020 06:30 PM | 250.00 | | |
395 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_444081_1 | E/M/325/2020-1976 | S/E/T/C of High Mast 01 No. And S/F of LED Street Light on pole and painting of pole at SMY Akbarpur, Kanpur Dehat. | 05-Mar-2020 06:45 PM | 250.00 | | |
396 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_453046_1 | E/M/325/2020-2034 | Electrical Non Schedule item for Cold Room and Ripening Room and its Related Works. | 20-Mar-2020 03:15 PM | 250.00 | | |
397 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_453944_1 | E/M/325/2020-2063 | S/E of Over Head / Cantilever Type Retro Reflective Sign Board. | 21-Mar-2020 02:15 PM | 250.00 | | |
398 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_453974_1 | E/M/325/2020-2061 | S/F of Water Cooler with RO System and its related Works. | 21-Mar-2020 02:30 PM | 250.00 | | |
399 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_466933_1 | E/M/325/2020-41 | Repairing of Griding Line, Hot water Plant, S/I/T/C of Cleaning Machine and Puff Panneling For cold Room/ Pre cooler room etc. At Mango Pack House, Rahman Khera, Hardoi Road Lko. | 06-May-2020 06:15 PM | 736.24 | | |
400 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_474716_1 | E/M/325/2020-74 | Replacement of brushing of shorting convare line, 01 no. pre cooler, converted in to chamber and commisionig of puff panneling in vegetable area and s/f of cleaning machine and upgardation of Hot water treatment etc. at Mango Pack House Malihabad Lko | 23-May-2020 02:30 PM | 736.25 | | |
401 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476011_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bangrmau,Unnao. | 27-May-2020 02:30 PM | 353.90 | | |
402 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476032_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Etawah. | 27-May-2020 02:55 PM | 353.90 | | |
403 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476052_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Kaimganj. | 27-May-2020 03:15 PM | 353.90 | | |
404 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476063_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Farukhabad. | 27-May-2020 03:30 PM | 353.90 | | |
405 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476077_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bharthana. | 27-May-2020 03:40 PM | 353.90 | | |
406 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476085_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur Road, Lko. | 27-May-2020 03:45 PM | 353.90 | | |
407 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476094_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Lakhimpur. | 27-May-2020 04:00 PM | 353.90 | | |
408 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476109_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Gonda. | 27-May-2020 04:15 PM | 353.90 | | |
409 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476121_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Barabanki. | 27-May-2020 04:30 PM | 353.90 | | |
410 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476134_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur. | 27-May-2020 05:00 PM | 353.90 | | |
411 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476148_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Hardoi. | 27-May-2020 05:00 PM | 353.90 | | |
412 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476421_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Naubasta. | 28-May-2020 01:30 PM | 353.90 | | |
413 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476471_1 | E/M/325/2020-108 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Sitapur Road Lko. | 28-May-2020 02:50 PM | 250.00 | | |
414 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476484_1 | E/M/325/2020-108 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Kaimganj, Farukhabad. | 28-May-2020 03:20 PM | 250.00 | | |
415 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476497_1 | E/M/325/2020-108 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY palia, Khiri. | 28-May-2020 03:20 PM | 250.00 | | |
416 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476512_1 | E/M/325/2020-108 | Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Bahraich | 28-May-2020 03:30 PM | 250.00 | | |
417 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476633_1 | E/M/325/2020-104 | S/E/T/C of High Mast 01 No. and S/F of LED Street Light on pole and painting of pole at SMY Akbarpur, Kanpur Dehat. | 28-May-2020 05:10 PM | 250.00 | | |
418 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476650_1 | E/M/325/2020-104 | Internal and External Electrification in Boys Hostel CSAU Kanpur | 28-May-2020 05:30 PM | 304.95 | | |
419 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476663_1 | E/M/325/2020-104 | Extension/repairing of LT Line, S/F of LED light on High Mast/ Pole, Inter. Electri. in diff. type Build., APF, Gate light and S/F of 02 Nos. water cooler and its related works. at NMY Nanpara Distt. Bahraich. | 28-May-2020 05:30 PM | 405.26 | | |
420 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_476678_1 | E/M/325/2020-104 | CONSTRUCTION OF TUBE WELL SIZE 300mm x 200mm and S/F of 15 H.P Submersible Pump AT N.M.Y. Bhinga, Bahraich. | 28-May-2020 05:30 PM | 250.00 | | |
421 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489352_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Etawah. | 02-Jul-2020 03:15 PM | 353.90 | | |
422 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489365_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Kaimganj. | 02-Jul-2020 03:15 PM | 353.90 | | |
423 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489339_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bangermau. | 02-Jul-2020 03:20 PM | 353.90 | | |
424 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489373_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Farukhabad. | 02-Jul-2020 03:30 PM | 353.90 | | |
425 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489382_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bharthna. | 02-Jul-2020 03:40 PM | 353.90 | | |
426 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489391_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur. | 02-Jul-2020 03:50 PM | 353.90 | | |
427 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489398_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur Road. | 02-Jul-2020 04:10 PM | 353.90 | | |
428 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489416_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Lakhimpur. | 02-Jul-2020 04:15 PM | 353.90 | | |
429 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489428_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Gonda. | 02-Jul-2020 04:30 PM | 353.90 | | |
430 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489435_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Barabanki. | 02-Jul-2020 04:45 PM | 353.90 | | |
431 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489441_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY hardoi. | 02-Jul-2020 04:50 PM | 353.90 | | |
432 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_489445_1 | E/M/325/2020-112 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Naubasta. | 02-Jul-2020 05:10 PM | 353.90 | | |
433 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501447_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Mithauli, Under Krishi Utpadan Mandi Samiti Maigalganj. | 22-Aug-2020 05:00 PM | 250.00 | | |
434 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501471_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Kalwamoti, Under Krishi Utpadan Mandi Samiti Maigalganj. | 22-Aug-2020 05:20 PM | 250.00 | | |
435 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501470_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Kakraha, Under Krishi Utpadan Mandi Samiti Maigalganj. | 22-Aug-2020 06:05 PM | 250.00 | | |
436 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501472_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Mithauli, Under Krishi Utpadan Mandi Samiti Maigalganj. | 24-Aug-2020 10:00 AM | 250.00 | | |
437 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501470_2 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Madaripurwa, Under Krishi Utpadan Mandi Samiti Maigalganj. | 24-Aug-2020 10:00 AM | 250.00 | | |
438 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501469_1 | E/M/325/2020 -410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Kakraha, Under Krishi Utpadan Mandi Samiti Maigalganj | 24-Aug-2020 10:00 AM | 250.00 | | |
439 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501464_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Birampur, Under Krishi Utpadan Mandi Samiti Maigalganj. | 24-Aug-2020 10:00 AM | 250.00 | | |
440 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501451_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Phoolbehar Under Krishi Utpadan Mandi Samiti Kheeri. | 24-Aug-2020 10:00 AM | 250.00 | | |
441 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501450_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Malpur Under Krishi Utpadan Mandi Samiti Kheeri. | 24-Aug-2020 10:00 AM | 250.00 | | |
442 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501449_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Nardaval Under Krishi Utpadan Mandi Samiti Kheeri. | 24-Aug-2020 10:00 AM | 250.00 | | |
443 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501457_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Balpur Pakaria Under Krishi Utpadan Mandi Samiti Biswa | 24-Aug-2020 10:00 AM | 250.00 | | |
444 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501458_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Sherpur Laval Under Krishi Utpadan Mandi Samiti Biswa | 24-Aug-2020 10:00 AM | 250.00 | | |
445 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501453_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Judaura Under Krishi Utpadan Mandi Samiti Hardoi. | 24-Aug-2020 10:00 AM | 250.00 | | |
446 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501446_1 | E/M/325/2020-410 | Internal electrification in01 no. Toilet Block at NMY. Mohammadi Distt. Lakhimpur. | 24-Aug-2020 10:00 AM | 250.00 | | |
447 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501447_2 | E/M/325/2020-410 | Internal electrification in01 no. Toilet Block at NMY. Maigalganj. | 24-Aug-2020 10:00 AM | 250.00 | | |
448 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_506212_1 | E/M/325/2020-403 | S/I/T/C of New Gearless Lift Capacity 16 Passenger, cable and its Related Works at Kisan Bazar,Gomti Nagar, Lko. | 29-Aug-2020 10:00 AM | 250.00 | | |
449 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501463_1 | E/M/325/2020 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Sonwa Under Krishi Utpadan Mandi Samiti Lucknow. | 31-Aug-2020 06:00 PM | 250.00 | | |
450 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501463_2 | E/M/325/2020 | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Sonwa, Under Krishi UtpadanMandi Samiti Lucknow | 31-Aug-2020 06:00 PM | 250.00 | | |
451 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501460_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Salempur, Under Krishi Utpadan Mandi Samiti Lucknow | 01-Sep-2020 09:00 AM | 250.00 | | |
452 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501462_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Latifpur, Under Krishi Utpadan Mandi Samiti Lucknow. | 01-Sep-2020 10:00 AM | 250.00 | | |
453 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501459_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Niwan Under Krishi Utpadan Mandi Samiti Banthra. | 01-Sep-2020 10:00 AM | 250.00 | | |
454 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_501455_1 | E/M/325/2020-410 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Maharajnagar Under Krishi Utpadan Mandi Samiti Biswa. | 01-Sep-2020 10:00 AM | 250.00 | | |
455 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_507592_1 | E/M/325/2020 -457 | S/E/T/C of High Mast 01 No. And S/F of LED Street Light on pole and painting of pole at SMY Akbarpur, Kanpur Dehat. | 08-Sep-2020 04:00 PM | 250.00 | | |
456 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_507591_1 | E/M/325/2020-457 | Extension/Re. of LT Line, S/F LED Light on 16 Metre H. M. Light 04 Nos, S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos. 4KVA Steblizer, GI Pipe line and cabling work at NMY Nanpara Distt. Bahraich. | 08-Sep-2020 04:50 PM | 405.26 | | |
457 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_507589_1 | E/M/325/2020-457 | Internal and External Electrification in Boys Hostel CSAU Kanpur | 08-Sep-2020 05:00 PM | 304.95 | | |
458 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_507587_1 | E/M/325/2020-457 | S/E/T/C of 06 No. High Mast Lighting with 8 Nos. LED Flood Light at NMY Naubasta, Distt. Kanpur. | 08-Sep-2020 05:15 PM | 375.40 | | |
459 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_507078_1 | E/M/325/2020-457 | Supply and Laying of Cable and its Related works at Mandi Parishad Awasiya Colony Gomti Nagar, Lko | 08-Sep-2020 05:40 PM | 250.00 | | |
460 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_507076_1 | E/M/325/2020-457 | Internal Electrifiication in 2 No. Modern Toilet Block at NMY Aloo Mandi Satanpur Distt. Farukhabad. | 08-Sep-2020 05:40 PM | 250.00 | | |
461 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_507074_1 | E/M/325/2020-457 | Internal Electrification in B type Shop 8 Nos. and Extension of LT Line at N.M.Y. Naubasta Distt. Kanpur. | 09-Sep-2020 10:00 AM | 250.00 | | |
462 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_526530_1 | E/M/325/2020-578 | S/I/T/C of New Gearless Lift Capacity 16 Passenger, cable and its Related Works at Kisan Bazar, Gomti Nagar, Lko. | 02-Nov-2020 10:00 AM | 250.00 | | |
463 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527137_1 | E/M/325/2020 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bangermau. | 16-Nov-2020 10:00 AM | 353.90 | | |
464 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527134_1 | E/M/325/2020-639 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Etawah. | 16-Nov-2020 10:00 AM | 353.90 | | |
465 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527133_1 | E/M/325/2020-639 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Kaimganj. | 16-Nov-2020 10:00 AM | 353.90 | | |
466 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527131_1 | E/M/325/2020-639 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Farukhabad. | 16-Nov-2020 10:00 AM | 353.90 | | |
467 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527130_1 | E/M/325/2020-639 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bharthna. | 16-Nov-2020 10:00 AM | 353.90 | | |
468 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527128_1 | E/M/325/2020-639 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur Road, Lko. | 16-Nov-2020 10:00 AM | 353.90 | | |
469 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527126_1 | E/M/325/2020-639 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Lakhimpur. | 16-Nov-2020 10:00 AM | 353.90 | | |
470 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527124_1 | E/M/325/2020-639 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Barabanki. | 16-Nov-2020 10:00 AM | 353.90 | | |
471 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527122_1 | E/M/325/2020-639 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur. | 16-Nov-2020 10:00 AM | 353.90 | | |
472 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527163_1 | E/M/325/2020-639 | Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Hardoi. | 16-Nov-2020 10:00 AM | 353.90 | | |
473 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527162_1 | E/M/325/2020-634 | CONSTRUCTION OF TUBE WELL SIZE 300mm x 200mm and S/F of 15 H.P Submersible Pump AT N.M.Y. Bhinga, Bahraich. | 17-Nov-2020 12:35 PM | 250.00 | | |
474 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527125_1 | E/M/325/2020-639 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Gonda. | 17-Nov-2020 12:50 PM | 250.00 | | |
475 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527152_1 | E/M/325/2020-642 | Supply and Laying of Cable and its Related works at Mandi Parishad Awasiya Colony Gomti Nagar, Lko | 23-Nov-2020 04:00 PM | 250.00 | | |
476 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527151_1 | E/M/325/2020-642 | Internal Electrifiication in 2 No. Modern Toilet Block at NMY Aloo Mandi Satanpur Distt. Farukhabad. | 23-Nov-2020 04:00 PM | 250.00 | | |
477 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527158_1 | E/M/325/2020-642 | Internal electrification in01 no. Toilet Block at NMY. Mohammadi Distt. Lakhimpur. | 23-Nov-2020 04:00 PM | 250.00 | | |
478 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527149_1 | E/M/325/2020-642 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Mithauli IInd, Kaluamoti, Madaripurwa, Kakraha, Virampur Under Krishi Utpadan Mandi Samiti Maigalganj | 23-Nov-2020 04:00 PM | 250.00 | | |
479 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527148_1 | E/M/325/2020-642 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Phoolbehar, Malpur, Nardaul Under Krishi Utpadan Mandi Samiti Kheeri. | 23-Nov-2020 04:15 PM | 250.00 | | |
480 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527145_1 | E/M/325/2020-642 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Balpur Pakaria, Maharajnagar Under Krishi Utpadan Mandi Samiti Biswa. Sitapur | 23-Nov-2020 04:20 PM | 250.00 | | |
481 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527144_1 | E/M/325/2020-642 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Sonwa, Salempur, Latifpur Under Krishi Utpadan Mandi Samiti Lucknow. | 23-Nov-2020 04:25 PM | 250.00 | | |
482 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527154_1 | E/M/325/2020-642 | S/E/T/C of 06 No. High Mast Lighting with 8 Nos. LED Flood Light at NMY Naubasta, Distt. Kanpur. | 23-Nov-2020 04:40 PM | 375.40 | | |
483 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527140_1 | E/M/325/2020-642 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Niwan Sherpur, Lawal Under Krishi Utpadan Mandi Samiti Banthara. | 23-Nov-2020 05:00 PM | 250.00 | | |
484 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527139_1 | E/M/325/2020-642 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Judaura Under Krishi Utpadan Mandi Samiti Hardoi. | 23-Nov-2020 05:15 PM | 250.00 | | |
485 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527138_1 | E/M/325/2020-642 | Internal electrification in 01 no. Toilet Block at NMY. Maigalganj | 23-Nov-2020 06:00 PM | 250.00 | | |
486 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_527161_1 | E/M/325/2020-676 | S/I/T/C of Fire Fighting System and Operation of Fire Fighting System in NMY Sitapur Road Lko. | 03-Dec-2020 12:15 PM | 1748.70 | | |
487 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_536030_1 | E/M/325/2020-711 | S/F of. 45 to 200 watt LED Flood/ Street Light Drivers etc. | 07-Dec-2020 12:30 PM | 250.00 | | |
488 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_539301_1 | E/M/325/2020-751 | Supply and Laying of Cable and its Related works at Mandi Parishad Awasiya Colony Gomti Nagar, Lko | 24-Dec-2020 04:00 PM | 250.00 | | |
489 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_539304_1 | E/M/325/2020-751 | Internal electrification in01 no. Toilet Block at NMY. Mohammadi Distt. Lakhimpur. | 24-Dec-2020 04:00 PM | 250.00 | | |
490 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_539307_1 | E/M/325/2020-751 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Mithauli IInd, Kaluamoti, Madaripurwa, Kakraha, Virampur Under Krishi Utpadan Mandi Samiti Maigalganj | 24-Dec-2020 04:15 PM | 250.00 | | |
491 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_539308_1 | E/M/325/2020-751 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Phoolbehar, Malpur, Nardaul Under Krishi Utpadan Mandi Samiti Kheeri. | 24-Dec-2020 04:30 PM | 250.00 | | |
492 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_539311_1 | E/M/325/2020-751 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Balpur Pakaria, Maharajnagar Under Krishi Utpadan Mandi Samiti Biswa. Sitapur | 24-Dec-2020 04:45 PM | 250.00 | | |
493 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_539313_1 | E/M/325/2020-751 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Sonwa, Salempur, Latifpur Under Krishi Utpadan Mandi Samiti Lucknow. | 24-Dec-2020 05:00 PM | 250.00 | | |
494 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_539315_1 | E/M/325/2020-751 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Niwan Sherpur, Lawal Under Krishi Utpadan Mandi Samiti Banthara. | 24-Dec-2020 05:15 PM | 250.00 | | |
495 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_539318_1 | E/M/325/2020-751 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Judaura Under Krishi Utpadan Mandi Samiti Hardoi. | 24-Dec-2020 05:30 PM | 250.00 | | |
496 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2020_RKUMP_539319_1 | E/M/325/2020-751 | Internal electrification in 01 no. Toilet Block at NMY. Maigalganj | 24-Dec-2020 05:45 PM | 250.00 | | |
497 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_542740_1 | E/M/325/2020-833 | Annual Comprehensive Maintenance of 01 No. VIP and 03 Nos. Passenger Lift installed at Kisan Mandi Bhawan Gomti Nagar Lko. | 02-Jan-2021 03:00 PM | 250.00 | | |
498 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_542738_1 | E/M/325/2020-833 | Annual Operation work of Fire Fighting, FireAlarm System installed at Kisan Mandi Bhawan Gomti Nagar Lko. | 02-Jan-2021 05:00 PM | 250.00 | | |
499 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_542736_1 | E/M/325/2020-833 | Annual Comprehensive Maintenance and Operation of 680 Ton AC Plant System installed at Kisan Mandi Bhawan Gomti Nagar Lko. | 02-Jan-2021 05:10 PM | 325.70 | | |
500 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543146_1 | E/M/325/2020-840 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gonda. | 04-Jan-2021 12:55 PM | 250.00 | | |
501 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543584_1 | E/M/325/2020-852 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Manjhoria Under Krishi Utpadan Mandi Samiti Lucknow. | 06-Jan-2021 10:00 AM | 250.00 | | |
502 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543585_1 | E/M/325/2020-852 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kuchlai Under Krishi Utpadan Mandi Samiti Mishrikh | 06-Jan-2021 12:45 PM | 250.00 | | |
503 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543584_2 | E/M/325/2020-852 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Majhoria Under Krishi Utpadan Mandi Samiti Lucknow. | 06-Jan-2021 12:45 PM | 250.00 | | |
504 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543587_1 | E/M/325/2020-852 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Khanjan Nagar Under Krishi Utpadan Mandi Samiti Maigalganj | 06-Jan-2021 01:15 PM | 250.00 | | |
505 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543589_1 | E/M/325/2020-852 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Asoha, Kurmi Gadhewa Under Krishi Utpadan Mandi Samiti Purwa, Unnao. | 06-Jan-2021 01:30 PM | 250.00 | | |
506 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543583_1 | E/M/325/2020-852 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Sherpur, Katka and Katiyara Under Krishi Utpadan Mandi Samiti Hargaon. | 06-Jan-2021 04:30 PM | 250.00 | | |
507 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543577_1 | E/M/325/2020-852 | Supply and Fixing of LED Street Lighting Panel etc work at N.M.Y Lakhimpur. | 13-Jan-2021 12:10 PM | 250.00 | | |
508 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543578_1 | E/M/325/2020-852 | Internal Wiring in APF 12 X 88 Mtr. 01 No. At NMY Maigalganj. | 13-Jan-2021 12:40 PM | 250.00 | | |
509 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543582_1 | E/M/325/2020-852 | Internal Electrification in Residential Quarters At NMY Leherpur, Hargaon. | 13-Jan-2021 01:00 PM | 250.00 | | |
510 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_545525_1 | E/M/325/2021-881 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kharauli Under Krishi Utpadan Mandi Samiti Unnao | 13-Jan-2021 02:15 PM | 250.00 | | |
511 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_545522_1 | E/M/325/2021-881 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Alipur Nichlaula Under Krishi Utpadan Mandi Samiti Bangermau | 13-Jan-2021 03:15 PM | 250.00 | | |
512 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543592_1 | E/M/325/2021-890 | Internal Electrifiication in 2 No. Modern Toilet Block at NMY Aloo Mandi Satanpur Distt. Farukhabad. | 14-Jan-2021 05:55 PM | 250.00 | | |
513 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_543593_1 | E/M/325/2021-900 | Repair/Replacement of defective spare parts fitted in Online hot water immersion treatment unit of Mango processing conveyor line and Replacement of defective spares parts fitted in Offline Hot water immersion treatment unit Capacity 500 Kg. / Batch | 15-Jan-2021 03:50 PM | 250.00 | | |
514 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_546344_1 | E/M/325/2021-909 | Electrification in samiti Office and Toilet Block at Kisan Bazar, Gomti Nagar, Lko. | 16-Jan-2021 05:15 PM | 250.00 | | |
515 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_550964_1 | E/M/325/2021-971 | Annual Operation work of Fire Fighting, FireAlarm System installed at Kisan Mandi Bhawan Gomti Nagar Lko. | 03-Feb-2021 02:10 PM | 250.00 | | |
516 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_550978_1 | E/M/325/2021-971 | Annual Comprehensive Maintenance of 01 No. VIP and 03 Nos. Passenger Lift installed at Kisan Mandi Bhawan Gomti Nagar Lko. | 03-Feb-2021 02:15 PM | 250.00 | | |
517 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_550988_1 | E/M/325/2021-971 | Annual Comprehensive Maintenance and Operation of 680 Ton AC Plant System installed at Kisan Mandi Bhawan Gomti Nagar Lko. | 03-Feb-2021 02:35 PM | 325.70 | | |
518 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_551275_1 | E/M/325/2021-1014 | Internal Wiring in APF 12 X 88 Mtr. 01 No. At NMY Maigalganj. | 04-Feb-2021 05:35 PM | 250.00 | | |
519 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_551277_1 | E/M/325/2021-1014 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kuchlai Under Krishi Utpadan Mandi Samiti Mishrikh. | 04-Feb-2021 06:00 PM | 250.00 | | |
520 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_551273_1 | E/M/325/2021-1014 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Khanjan Nagar Under Krishi Utpadan Mandi Samiti Maigalganj | 04-Feb-2021 06:15 PM | 250.00 | | |
521 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_551272_1 | E/M/325/2021-1018 | S/I of Dewatering Submersible Mud Pump and Its. Related works at Kisan Bazar, Gomti Nagar, Lko. | 05-Feb-2021 12:00 PM | 250.00 | | |
522 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560439_1 | E/M/325/2021-1125 | Internal Wiring in APF 12 X 88 Mtr. 01 No. At NMY Maigalganj. | 02-Mar-2021 11:30 AM | 250.00 | | |
523 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560441_1 | E/M/325/2021-1125 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kuchlai Under Krishi Utpadan Mandi Samiti Mishrikh. | 02-Mar-2021 11:30 AM | 250.00 | | |
524 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560440_1 | E/M/325/2021-1125 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Khanjan Nagar Under Krishi Utpadan Mandi Samiti Maigalganj | 02-Mar-2021 11:30 AM | 250.00 | | |
525 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560443_1 | E/M/325/2021-1125 | Annual Operation work of Fire Fighting, FireAlarm System installed at Kisan Mandi Bhawan Gomti Nagar Lko | 02-Mar-2021 11:30 AM | 250.00 | | |
526 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560442_1 | E/M/325/2021-1125 | Annual Comprehensive Maintenance of 01 No. VIP and 03 Nos. Passenger Lift installed at Kisan Mandi Bhawan Gomti Nagar Lko. | 02-Mar-2021 11:30 AM | 250.00 | | |
527 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560444_1 | E/M/325/2021-1125 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kharauli Under Krishi Utpadan Mandi Samiti Unnao | 02-Mar-2021 11:30 AM | 250.00 | | |
528 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560445_1 | E/M/325/2021-1125 | Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Alipur Nichlaula Under Krishi Utpadan Mandi Samiti Bangermau | 02-Mar-2021 11:30 AM | 250.00 | | |
529 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560822_1 | E/M/325/2021-1129 | Repairing Work of L.T. Line, LED Light on Poles / Pole mast , Pole Painting, Main switch, Cabling work and Rewiring of APF12X28 Mtr. 02 Nos., Farmer Rest House, Office at NMY Etawah. | 02-Mar-2021 05:00 PM | 309.44 | | |
530 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560817_1 | E/M/325/2021-1129 | Re-wiring in different types Building, and Repair work of L.T. Line, LED Light, S/F of LED flood ,15 H.P Submersible and Cabling, work etc. at N.M.Y. Mohammadabad, Distt. Farrukhabad. | 02-Mar-2021 05:30 PM | 306.37 | | |
531 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560798_1 | E/M/325/2021-1129 | LED Light on Poles/Pole mast, Pole Painting, Main switch, L.T. Line repair, Cabling work and Rewiring of Mandi Samiti Offic At NMY Pukhrayan. | 02-Mar-2021 05:50 PM | 250.00 | | |
532 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560794_1 | E/M/325/2021-1129 | S/F of LED Flood on High Mast at NMY Barabanki. | 02-Mar-2021 06:10 PM | 250.00 | | |
533 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560791_1 | E/M/325/2021-1129 | S/F of LED Flood on High Mast at NMY F/V Gonda | 02-Mar-2021 06:30 PM | 250.00 | | |
534 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_560786_1 | E/M/325/2021-1129 | S/F of LED Flood on High Mast at NMY Nawabganj, Gonda. | 03-Mar-2021 11:10 AM | 250.00 | | |
535 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_566839_1 | E/M/325/2021-1186 | S/I/T/C of 01TPH Grain Grading Plant of capacity1,2,5,AND20TPH and 2TPH Mobaile G. Gra.Plant, S/I/T/C of PotatoSorting. Grading Line /Onion gra.plant of capa. 1, 2, 4- 5TPH, S/I/T/Cof 300,500and1000 kg/day of segregated organic waste composting unit | 09-Mar-2021 04:30 PM | 250.00 | | |
536 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_566056_1 | E/M/325/2021-1182 | S/I of Dewatering Mud Pump and Its. Related works at Kisan Bazar, Gomti Nagar, Lko. | 09-Mar-2021 05:10 PM | 250.00 | | |
537 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_566762_1 | E/M/325/2021-1186 | S/I/T/C of 01TPH Grain Grading Plant of capacity1,2,5,AND20TPH and 2TPH Mobaile G. Gra.Plant, S/I/T/C of PotatoSorting. Grading Line /Onion gra.plant of capa. 1, 2, 4- 5TPH, S/I/T/Cof 300,500and1000 kg/day of segregated organic waste composting unit | 09-Mar-2021 05:25 PM | 250.00 | | |
538 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_572305_1 | E/M/325/2021-1226 | S/I/T/C of New Gearless Lift Capacity 13 Passenger, cable and its Related Work at Kisan Bazar , Gomti Nagar, Lko. | 20-Mar-2021 02:15 PM | 250.00 | | |
539 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_572314_1 | E/M/325/2021-1226 | S/F of 150 Ltr. Capacity 02 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Cage and other related Work and S/F of LED Light on High Mast etc. work At NMY Sandi, Hardoi. | 22-Mar-2021 04:40 PM | 250.00 | | |
540 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_572315_1 | E/M/325/2021-1226 | Repairing of LED Street light At NMY Hardoi. | 22-Mar-2021 05:00 PM | 250.00 | | |
541 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_573752_1 | E/M/325/2021-1240 | Annual Comprehensive Maintenance of 01 No. VIP and 03 Nos. Passenger Lift installed at Kisan Mandi Bhawan Gomti Nagar Lko. | 23-Mar-2021 01:20 PM | 250.00 | | |
542 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_579860_1 | E/M/325/2021-16 | S/I/T/C of 01TPH Grain Grading Plant of capacity1,2,5,AND 20TPH and 2TPH Mobaile G. Gra.Plant, S/I/T/C of Potato Sorting. Grading Line/Oniongra. plant of capa.1,2,4-5TPH, S/I/T/C of 300,500 and 1000 kg/day of segregated organic waste composting unit | 05-Apr-2021 06:50 PM | 250.00 | | |
543 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_585311_1 | E/M/325/2021-97 | Repairing Work of L.T. Line, LED Light on Poles / Pole mast , Pole Painting, Main switch, Cabling work and Rewiring of APF12X28 Mtr. 02 Nos., Farmer Rest House, Office at NMY Etawah. | 07-May-2021 03:00 PM | 309.44 | | |
544 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_585310_1 | E/M/325/2021-97 | Rewiring in different types Building and Repair work of L.T. Line, LED Light, S/F of LED flood , 15 H.P Submersible and Cabling work etc. at N.M.Y. Mohammadabad, Distt. Farrukhabad. | 07-May-2021 03:00 PM | 306.37 | | |
545 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_585309_1 | E/M/325/2021-97 | LED Light on Poles/Pole mast, Pole Painting, Main switch, L.T. Line repair, Cabling work and Rewiring of Mandi Samiti Offic At NMY Pukhrayan. | 07-May-2021 03:00 PM | 250.00 | | |
546 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_585306_1 | E/M/325/2021-97 | S/F of LED Flood on High Mast at NMY Nawabganj, Gonda. | 07-May-2021 03:45 PM | 250.00 | | |
547 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_585308_1 | E/M/325/2021-97 | S/F of LED Flood on High Mast at NMY Barabanki. | 07-May-2021 04:10 PM | 250.00 | | |
548 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_585307_1 | E/M/325/2021-97 | S/F of LED Flood on High Mast at NMY F/V Gonda | 07-May-2021 04:15 PM | 250.00 | | |
549 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_585305_1 | E/M/325/2021-97 | S/I/T/C of New Gearless Lift Capacity 13 Passenger, cable and its Related Work at Kisan Bazar , Gomti Nagar, Lko. | 07-May-2021 05:15 PM | 250.00 | | |
550 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_585304_1 | E/M/325/2021-97 | Repair/Replacement of defective spareparts fitted in Online hot water immersion treatment unit of Mangoprocessing conveyor line, Replace of defective spares parts fitted in Offline Hot water immer. treatment unit Capa.500 Kg/Batch. at MangoPackHouse, | 07-May-2021 05:30 PM | 250.00 | | |
551 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_586698_1 | E/M/325/2021-120 | S/I/T/C of 01TPH Grain Grading Plant of capacity1,2,5,AND 20TPH and 2TPH Mobaile G. Gra.Plant, S/I/T/C of Potato Sorting. Grading Line/Oniongra. plant of capa.1,2,4-5TPH, S/I/T/C of 300,500 and 1000 kg/day of segregated organic waste composting unit. | 15-May-2021 01:25 PM | 250.00 | | |
552 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593735_1 | E/M/325/2021-196 | S/F of 150 Ltr. Capacity 02 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Cage and other related Work and S/F of LED Light on High Mast etc. work At NMY Sandi, Hardoi. | 10-Jun-2021 04:40 PM | 250.00 | | |
553 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593742_1 | E/M/325/2021-192 | S/F of LED Flood on High Mast at NMY Barabanki. | 11-Jun-2021 12:30 PM | 250.00 | | |
554 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593734_2 | E/M/325/2021-196 | S/F of 150 Ltr. Capacity 02 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Cage and other related Work and S/F of LED Light on High Mast etc. work At NMY Sandi, Hardoi. | 11-Jun-2021 04:00 PM | 250.00 | | |
555 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593735_2 | E/M/325/2021-196 | S/F of 150 Ltr. Capacity 02 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Cage and other related Work and S/F of LED Light on High Mast etc. work At NMY Sandi, Hardoi. | 11-Jun-2021 04:00 PM | 250.00 | | |
556 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593735_3 | E/M/325/2021-196 | S/F of 150 Ltr. Capacity 02 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Cage and other related Work and S/F of LED Light on High Mast etc. work At NMY Sandi, Hardoi. | 11-Jun-2021 04:30 PM | 250.00 | | |
557 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593734_1 | E/M/325/2021-196 | Reapairing of LED Street light and other related work. At NMY- Hardoi | 11-Jun-2021 05:00 PM | 250.00 | | |
558 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593740_1 | E/M/325/2021-192 | S/F of LED Flood on High Mast at NMY Nawabganj, Gonda. | 11-Jun-2021 05:10 PM | 250.00 | | |
559 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593739_1 | E/M/325/2021-192 | S/I/T/C of New Gearless Lift Capacity 13 Passenger, cable and its Related Work at Kisan Bazar, Gomti Nagar, Lko | 12-Jun-2021 09:00 AM | 250.00 | | |
560 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593738_1 | E/M/325/2021-192 | Rewiring in different types Building and Repair work of L.T. Line, LED Light, S/F of LED flood , 15 H.P Submersible and Cabling work etc. at N.M.Y. Mohammadabad, Distt. Farrukhabad. | 12-Jun-2021 09:00 AM | 306.37 | | |
561 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593736_1 | E/M/325/2021-192 | Annual Comprehensive Maintenance of 01 No. VIP and 03 Nos Passenger Lift installed at Kisan Mandi Bhawan Gomti Nagar Lko | 12-Jun-2021 09:00 AM | 250.00 | | |
562 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593733_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 4 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Chakarpur, Bhauti Kanpur. | 17-Jun-2021 12:45 PM | 707.80 | | |
563 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593731_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Naubasta Kanpur. | 17-Jun-2021 01:30 PM | 353.90 | | |
564 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593729_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Auraiya. | 17-Jun-2021 03:00 PM | 353.90 | | |
565 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593728_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Bahraich. | 17-Jun-2021 03:30 PM | 353.90 | | |
566 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593712_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gola. | 17-Jun-2021 04:00 PM | 353.90 | | |
567 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593709_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Rura. | 17-Jun-2021 05:00 PM | 250.00 | | |
568 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593707_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Jhinjhak. | 17-Jun-2021 06:50 PM | 250.00 | | |
569 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593704_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Uttaripura. | 18-Jun-2021 09:00 AM | 250.00 | | |
570 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593702_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gonda. | 18-Jun-2021 09:00 AM | 250.00 | | |
571 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593701_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Nawabganj | 18-Jun-2021 09:00 AM | 250.00 | | |
572 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593700_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Maigalganj. | 18-Jun-2021 09:00 AM | 250.00 | | |
573 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593698_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Palia. | 18-Jun-2021 09:00 AM | 250.00 | | |
574 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_593695_1 | E/M/325/2021-222 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Haidergarh. | 18-Jun-2021 09:00 AM | 250.00 | | |
575 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_600866_1 | E/M/325/2021-306 | S/F of LED Flood on High Mast at NMY Barabanki. | 03-Jul-2021 04:00 PM | 250.00 | | |
576 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_600865_1 | E/M/325/2021-306 | S/F of LED Flood on High Mast at NMY Nawabganj, Gonda. | 03-Jul-2021 04:00 PM | 250.00 | | |
577 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602177_1 | E/M/325/2021-344 | S/F of Led Light and Electrification works etc. at IInd Floor Kisan Mandi Bhawan Gomti Nagar, Lko. | 08-Jul-2021 06:45 PM | 250.00 | | |
578 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602186_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 4 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Chakarpur, Bhauti Kanpur. | 09-Jul-2021 01:30 PM | 707.80 | | |
579 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602187_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Naubasta. Kanpur. | 09-Jul-2021 02:00 PM | 353.90 | | |
580 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602190_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Auraiya. | 09-Jul-2021 02:45 PM | 353.90 | | |
581 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602192_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Bahraich. | 09-Jul-2021 03:00 PM | 353.90 | | |
582 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602193_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gola Kheri. | 09-Jul-2021 03:30 PM | 250.00 | | |
583 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602195_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Rura, Kanpur Dehat. | 09-Jul-2021 03:30 PM | 250.00 | | |
584 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602196_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Jhinjhak, Kanpur Dehat. | 09-Jul-2021 04:30 PM | 250.00 | | |
585 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602197_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Uttaripura, Kanpur. | 09-Jul-2021 05:00 PM | 250.00 | | |
586 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602198_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gonda. | 09-Jul-2021 05:00 PM | 250.00 | | |
587 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602199_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Nawabganj, Gonda. | 09-Jul-2021 05:20 PM | 250.00 | | |
588 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602201_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Maigalganj, Kheri. | 09-Jul-2021 05:20 PM | 250.00 | | |
589 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602203_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Palia Kalan, Kheri. | 09-Jul-2021 05:40 PM | 250.00 | | |
590 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_602205_1 | E/M/325/2021-352 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Haidergarh. | 09-Jul-2021 06:00 PM | 250.00 | | |
591 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606417_1 | E/M/325/202-460 | Annual Comprehensive Maintenance and Operation work of existing 4 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Chakarpur, Bhauti Kanpur. | 05-Aug-2021 06:20 PM | 707.80 | | |
592 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606415_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Nabasta, Kanpur. | 05-Aug-2021 06:30 PM | 353.90 | | |
593 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606412_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Auraiya. | 06-Aug-2021 09:00 AM | 353.90 | | |
594 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606411_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Bahraich. | 06-Aug-2021 12:30 PM | 353.90 | | |
595 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606410_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gola, kheri. | 06-Aug-2021 01:00 PM | 250.00 | | |
596 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606409_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Rura. | 06-Aug-2021 01:20 PM | 250.00 | | |
597 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606407_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Jhinjhak, Kanpur Dehat. | 06-Aug-2021 03:00 PM | 250.00 | | |
598 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606406_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Uttaripura Kanpur Dehat. | 06-Aug-2021 03:30 PM | 250.00 | | |
599 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606404_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Gonda. | 06-Aug-2021 03:30 PM | 250.00 | | |
600 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606403_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Nawabganj,Gonda. | 06-Aug-2021 04:00 PM | 250.00 | | |
601 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606402_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Maigalganj, Lakhimpur Kheri. | 06-Aug-2021 04:15 PM | 250.00 | | |
602 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606400_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Palia, Lakhimpur Kheri. | 06-Aug-2021 04:40 PM | 250.00 | | |
603 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_606397_1 | E/M/325/2021-460 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Haidergarh, Barabanki. | 06-Aug-2021 04:50 PM | 250.00 | | |
604 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_609446_1 | E/M/325/2021-475 | S/F of Led Light and Electrification works etc. at IInd Floor Kisan Mandi Bhawan Gomti Nagar, Lko. | 07-Aug-2021 05:00 PM | 250.00 | | |
605 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612238_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 4 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Chakarpur, Bhauti Kanpur. | 19-Aug-2021 02:30 PM | 707.80 | | |
606 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612237_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Naubasta, Kanpur. | 19-Aug-2021 02:30 PM | 353.90 | | |
607 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612236_1 | E/M/325/2021- 511 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Auraiya. | 19-Aug-2021 03:00 PM | 353.90 | | |
608 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612235_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Bahraich. | 19-Aug-2021 04:00 PM | 353.90 | | |
609 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612233_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gola. | 19-Aug-2021 04:15 PM | 250.00 | | |
610 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612232_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Rura. | 19-Aug-2021 04:30 PM | 250.00 | | |
611 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612231_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Jhinjhak. | 19-Aug-2021 05:00 PM | 250.00 | | |
612 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612230_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Uttaripura. | 19-Aug-2021 05:00 PM | 250.00 | | |
613 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612229_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gonda. | 19-Aug-2021 05:00 PM | 250.00 | | |
614 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612228_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Nawabganj. | 19-Aug-2021 05:10 PM | 250.00 | | |
615 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612227_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Maigalganj. | 19-Aug-2021 05:30 PM | 250.00 | | |
616 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612226_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Palia. | 19-Aug-2021 05:45 PM | 250.00 | | |
617 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_612225_1 | E/M/325/2021-511 | Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Haidergarh. | 19-Aug-2021 05:50 PM | 250.00 | | |
618 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_613685_1 | E/M/325/2021-520 | S/F of Led Light and Electrification works etc. at IInd Floor Kisan Mandi Bhawan Gomti Nagar, Lko | 25-Aug-2021 05:00 PM | 250.00 | | |
619 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_621807_1 | E/M/325/2021-633 | Comprehensive Maintenance of 03 Nos. Passenger Lift at Kisan Mandi Bhawan, Gomti Nagar Lko. | 21-Sep-2021 04:30 PM | 250.00 | | |
620 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_621808_1 | E/M/325/2021-633 | Extension of LT Line, S/F of Street LED Light and Its Related work and Internal Electrification in C type shop 5 No. and 12 X 40 Mtr. APF. 01 No. At NMY Biswa, Sitapur. | 21-Sep-2021 06:30 PM | 250.00 | | |
621 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_634284_1 | E/M/325/2021-745 | Comprehensive Maintenance of 03 Nos. Passenger Lift at Kisan Mandi Bhawan, Gomti Nagar Lko. | 27-Oct-2021 10:00 AM | 250.00 | | |
622 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_634283_1 | E/M/325/2021-745 | Extension of LT Line, S/F of Street LED Light and Its Related work and Internal Electrification in C type shop 5 No. and 12 X 40 Mtr. APF. 01 No. At NMY Biswa, Sitapur. | 27-Oct-2021 10:00 AM | 250.00 | | |
623 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_646394_1 | E/M/325/2021-824 | Servicing of Lift, 380KVA DG Set, Diesel Fire Pump, S/F of Lighting Arrester, Street Light, Tube Light and Mud Pump and centrifusing of T/F oil etc. Works at 16, A.P. Sen Road, Lko. | 25-Nov-2021 12:45 PM | 250.00 | | |
624 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650245_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr Capacity 50 M.T. 2 No. At NMY Lucknow. | 03-Dec-2021 09:00 AM | 250.00 | | |
625 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650246_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr Capacity 50 M.T. 2 No. At NMY Madhoganj. | 03-Dec-2021 05:00 PM | 250.00 | | |
626 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650250_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr Capacity 50 M.T. 2 No. At NMY Kannauj. | 03-Dec-2021 05:00 PM | 250.00 | | |
627 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650254_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 2 No. At NMY Gonda. | 03-Dec-2021 05:00 PM | 250.00 | | |
628 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650257_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 2 No. At NMY Etawah. | 03-Dec-2021 05:10 PM | 250.00 | | |
629 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650259_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 2 No. At NMY Jaswant Nagar. | 03-Dec-2021 05:15 PM | 250.00 | | |
630 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650265_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 2 No. At NMY Mahammadi. | 03-Dec-2021 05:25 PM | 250.00 | | |
631 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650267_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 2 No. At NMY Bahraich. | 03-Dec-2021 05:45 PM | 250.00 | | |
632 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650268_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 1 No. At NMY Hardoi. | 03-Dec-2021 05:45 PM | 250.00 | | |
633 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650269_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 1 No. At NMY Auraiya. | 03-Dec-2021 06:00 PM | 250.00 | | |
634 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650276_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 1 No. At NMY Sitapur. | 03-Dec-2021 06:20 PM | 250.00 | | |
635 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2021_RKUMP_650273_1 | E/M/325/2021-851 | Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 1 No. At NMY Mohammadabad. | 03-Dec-2021 06:35 PM | 250.00 | | |
636 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2022_RKUMP_681603_1 | E/M/325/2022-1142 | Repairing of 02 Nos. Highmast LED Light and Street Light At NMY Saraimira, Kannauj. | 26-Mar-2022 06:00 PM | 250.00 | | |
637 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2022_RKUMP_681601_1 | E/M/325/2022-1142 | Repairing of 02 Nos. Highmast LED Light and Street Light OR S/F of Changeover Switch At NMY Farukhabad. | 26-Mar-2022 06:10 PM | 250.00 | | |
638 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2022_RKUMP_681599_1 | E/M/325/2022-1142 | Repairing of 02 Nos. Highmast / Street LED Light and S /F of LED Street Light At NMY Bahraich. | 26-Mar-2022 06:30 PM | 250.00 | | |
639 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2022_RKUMP_681598_1 | E/M/325/2022-1142 | Repairing of 06 Nos. Highmast LED Light At NMY Lakhimpur. | 26-Mar-2022 06:45 PM | 250.00 | | |
640 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2022_RKUMP_680606_1 | E/M/325/2022-1142 | S/L of 300 sqmm. 3.5 core Al. cable and S./f of 320. Change Over Switch and its related works etc at Kisan Bazar, Vibhuti khand Gomti Nagar Lucknow. | 28-Mar-2022 12:00 PM | 250.00 | | |
641 | SE Zone-1||Dy Director Construction(E-M), Lucknow | 2022_RKUMP_681597_1 | E/M/325/2022-1142 | Repairing of 02 Nos. Highmast LED Light and Street Light OR S/F of Changeover Switch At NMY Grain Gonda. | 28-Mar-2022 12:10 PM | 250.00 | | |
Total | | | | | | 211809.54 | | |