Tender detail with uplc charges
SNOrgnizationTender IdTender Reference NoTender TitlePublishedDateAmount(UPLC Charges)PaymentPayment Detail
1SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227514_1272/5SUPPLY AND ELECTRIFICATION WORK11-Jul-2018 09:00 AM250.00
2SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_179471_13254/2018Operation of DG Set 40KVA 250.00
3SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_204040_1E/M(325)/2018-236E/M (325)/2018-23616-May-2018 10:00 AM250.00
4SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_204055_1E/M(325)/2018-236E/M (325)/2018-23616-May-2018 10:00 AM250.00
5SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_81633_1 E/M(325)/2017-1863Replacement of LED light inplace of S.V lamp in 02 Nos High Mast Light 16Mtr at N.M.Y.Barabanki.391.70
6SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_81633_2 E/M(325)/2017-1863Replacement of LED light inplace of S.V lamp at N.M.Y. Hardoi.673.70
7SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_81633_3 E/M(325)/2017-1863Replacement of LED light inplace of S.V lamp in 02 Nos High Mast Light and Street light Pole at N.M.Y. Gonda.250.00
8SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_81633_4 E/M(325)/2017-1863Replacement of LED light inplace of S.V lamp at N.M.Y. Lakhimpur.707.50
9SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_81633_5 E/M(325)/2017-1863S/F of Over Head Retro Reflective sign board-02Nos And Cantilever Retro Reflective sign board-02Nos. at N.M.Y Kayamganj, Distt. Farukhabad.250.00
10SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_81633_6 E/M(325)/2017-1863External Electrification, LED light, Pole painting and cabling work at N.M.Y Kayamganj, Distt. Farukhabad.270.70
11SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_81633_7 E/M(325)/2017-1863Internal electrification in office Builing, Staff Quarters, Type fist 04Nos, Type IInd -04Nos, Type IIrd -01No. Pump House, DG room at N.M.Y Kayamganj, Distt. Farukhabad.250.00
12SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_81633_8 E/M(325)/2017-1863Replacement of LED light inplace of S.V lamp in 01 Nos High Mast Light and Street light Pole at N.M.Y Mahmudabad. Distt. Sitapur.254.00
13SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_82436_1E/M(325)/2017-1911Decoration of Kisan Mandi Bhawan, Gomti Nagar, Lucknow on 14 December 2017 to 15 December 2017 on the occasion of Independence Day -2017250.00
14SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_87896_1E/M (325)/2017-2238Comprehensive Maintanance of 07 nos Lift Installed at kishan Mandi Bhawan Gomti Nagar lko250.00
15SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_95643_1E/M(325)/17-2409upply and Installation of 63 KVA Transformers and Other Related Works.250.00
16SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_117289_22696/2017 Replacement of 06 nos Passenger Lift 09 and 10 Stops (ECE Make) Capacity 13 Passenger (884Kg) installed in Kisan Mandi Bhawan Gomti Nagar Lko 250.00
17SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_117279_22017/2699 S/I/T/C of New 09 and 10 Stops Passenger Lift Capacity 13 Passenger (884Kg) in Kisan Mandi Bhawan Gomti Nagar Lko. 250.00
18SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_123368_12782/2017Supply, Installation, Testing and Commissioning of 2.0 MT capacity Vapour Heat Treatment machine (V.H.T.) with complete accessories along puff panelling VHT related sorting / grading and quarantine area at Mango Pack House, Rehmen Khera, Lucknow faci250.00
19SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_128649_12864/2017-18Annual Comprehensive Maintenance andopration of 680ton air conditioning plant installed at kisan mandi bhawan gomti nagar lucknow326.92
20SE Zone-1||Dy Director Construction(E-M), Lucknow2017_RKUMP_128811_12888/207-18Supply, Installation, Testing and Commissioning of 2.0 MT capacity Vapour Heat Treatment machine (V.H.T.) for Mango, other fruits and vegetables with complete accessories, along with puff panelling for VHT related sorting / grading and quarantine are250.00
21SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_133378_12916/2017-18Decoration of Kisan Mandi Bhawan, Gomti Nagar, Lucknw on Republic Day -2018250.00
22SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_140694_12999/2017S/I/T/C of Fire Detection and Fire Alarm System and Fire Hydrant System At Kisan Mandi Bhawan Gomti Nagar Lko.873.33
23SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_145867_13068/2018COMPREHENSIVE MAINTENANCE AND OPRATION OF 50MT COMPUTERISED ELECTRONIC WEIGH BRIDGE INTALLED IN UP250.00
24SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_179449_13265-2018Operation and maintenance of fire fighting and fire alarm system861.10
25SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_185148_13279/2018S/I/T/C of Fire Detection and Fire Alarm System and Fire Hydrant System At Kisan Mandi Bhawan Gomti Nagar Lko.07-Apr-2018 09:00 AM873.33
26SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_186584_13348 NAWABGANJ2) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Nawabganj(Gonda)10-Apr-2018 09:00 AM250.00
27SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_186595_13348 HAIDERGARH3) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Haidergrah(Barabanki)10-Apr-2018 09:00 AM250.00
28SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_186606_13348 RURA4) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Rura(Kanpur Dehat)10-Apr-2018 09:00 AM250.00
29SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_186622_13348 JHIJHAK5) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Jhinjhak(Kanpur Dehat)10-Apr-2018 09:00 AM250.00
30SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_186640_13348 UTTARIPURA6) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Uttaripura(Kanpur Dehat)10-Apr-2018 09:00 AM250.00
31SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_186651_12248 PALIYA7) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY-paliya(Lakhimpur)10-Apr-2018 09:00 AM250.00
32SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_186658_13348 MAGALGANJ8) Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY-Magalganj(Lakhimpur)10-Apr-2018 09:00 AM250.00
33SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_186681_13348 GOLA9) Annual Comprehensive Maintenance and operation work for three years of existing 02 No. 50MT Electronic Computerizd weigh bridge at NMY- Gola(Lakhimpur)10-Apr-2018 09:00 AM382.32
34SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_186697_13348 AURIAYA10) Annual Comprehensive Maintenance and operation work for three years of existing 02 No. 50MT Electronic Computerizd weigh bridge at NMY- Auriaya10-Apr-2018 09:00 AM382.32
35SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_186702_13348 BAHRICH11) Annual Comprehensive Maintenance and operation work for three years of existing 02 No. 50MT Electronic Computerizd weigh bridge at NMY- Bahrich10-Apr-2018 09:00 AM382.32
36SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192402_1E/M (325)/2018-110, Dated 17/04/2018Providing Services of Electrician, Lift Oprater and Pump Oprater at RKUMP Lucknow19-Apr-2018 01:00 PM264.21
37SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_1106/2018Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- Uttaripura(Kanpur Dehat)20-Apr-2018 11:30 AM250.00
38SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_2106/2018Annual Comprehensive Maintenance and operation work for three years of existing 05 No. 50MT Electronic Computerizd weigh bridge at NMY- Naubasta(Kanpur)20-Apr-2018 12:45 PM382.32
39SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_3106/2018Annual Comprehensive Maintenance and operation work for three years of existing 05 No. 50MT Electronic Computerizd weigh bridge at NMY- BAHRICH20-Apr-2018 05:55 PM250.00
40SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_4106/2018Annual Comprehensive Maintenance and operation work for three years of existing 05 No. 50MT Electronic Computerizd weigh bridge at NMY- Auriya21-Apr-2018 09:00 AM250.00
41SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_5106/2018Annual Comprehensive Maintenance and operation work for three years of existing 05 No. 50MT Electronic Computerizd weigh bridge at NMY- GOLA21-Apr-2018 09:00 AM250.00
42SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_6106/2018Annual Comprehensive Maintenance and operation work for three years of existing 05 No. 50MT Electronic Computerizd weigh bridge at NMY- PALIYA21-Apr-2018 09:00 AM250.00
43SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_7106/2018Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- JHINJHAK21-Apr-2018 09:00 AM250.00
44SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227521_1272/7SUPPLY GENSET HIGHMAST LED WORK11-Jul-2018 03:30 PM250.00
45SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_8106/2018Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- RURA 21-Apr-2018 09:00 AM250.00
46SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_9106/2018Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- HAIDERGRAH21-Apr-2018 09:00 AM250.00
47SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_10106/2018Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- MAGALGANJ21-Apr-2018 12:00 PM250.00
48SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_11106/2018Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- nawabganj21-Apr-2018 12:00 PM250.00
49SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_192875_12106/2018Annual Comprehensive Maintenance and operation work for three years of existing 01 No. 50MT Electronic Computerizd weigh bridge at NMY- GONDA21-Apr-2018 12:00 PM250.00
50SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_193440_174/2018COMPREHENSIVE MAINTENANCE OF 07 NOS LIFTS CAPACITY 13 PASSENGER(884KG) INSTALLED IN KISHAN MANDI BHAWAN GOMTI NAGAR LUCKNOW21-Apr-2018 01:00 PM250.00
51SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_204859_1E/M(325)/2018-215Internal Electrification in Staff Qtrs Type I 2Nos Type II 02Nos Type III offices pump house check post A type shop 5 nos B type shop 10 nos C type shop 27 nos APF in vegetable market at NMY Safdarganj Barabanki18-May-2018 09:00 AM283.03
52SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_205250_1E/M(325)/2018-215-3Repairing of LT Line SF TPMO Set Street Light etc SF of 150Ltr Capacity 03Nos water cooler RO water purifier 03Nos 4KVA Steblizer Construction of water cooler case GI Pipe line and cabling work at NMY Gola Lakhimpur19-May-2018 09:00 AM250.00
53SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_205822_1E/M(325)/2018-215-10Internal wiring in check post WB Room Repairing of LT Line SF of Led Light on pole High Mast SF of 150Ltr Capacity 03Nos water cooler RO water purifier 03Nos 4KVA Steblizer at NMY Madhauijang 21-May-2018 09:00 AM264.49
54SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_205829_1E/M(325)/2018-215-9Repairing of Internal Wiring in office Building, Internal Wiring in APF 12 44M 02Nos Repariring of LT Line Led Light cabling work Etc NMY Sandila Hardoi21-May-2018 09:00 AM250.00
55SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_205980_1E/M(325)/2018-215-2BS/F of LED Light 200W 24Nos 110 to 130W 35Nos Steel Tubular Pole 08Nos Rewiring of Office toilet block tightening of LT line DB of 500 Amp for substation and Cabling laying works And SF of 150Ltr Capacity 01Nos water cooler RO water purifier 01N22-May-2018 09:00 AM250.00
56SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_206002_1E/M(325)/2018-215-2AS/F of LED Light 200W 64Nos 110W to 130W 68Nos Steel Tubular Pole 09Nos Submersible Pump 02Nos wiring in toilet block MCCB control panel gate 15HP lightes and Cabling works etc at NMY Sitapur Road Lucknow22-May-2018 09:00 AM436.47
57SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_206236_1E/M(325)/2018-215-1Street light convert in to LED light LT line work cabling other related work at mandi parishad awasya colony Gomti Nagar Lucknow22-May-2018 09:00 AM250.00
58SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_206238_1E/M(325)/2018-215-5Repairing Extension of LT Line Cabling SI of 15HP Submersible Pump Panel etc at NMY Chakarpur Bhouti Kanpur22-May-2018 09:00 AM411.73
59SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_205694_1215Repairing work of External Electrification, LED light, Pole painting and S/F of 01 Nos LED High Mast Light with cabling work22-May-2018 10:00 AM250.00
60SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_205908_1215External Electrification, LED light, Pole painting and cabling work 22-May-2018 10:00 AM255.43
61SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_205914_1215S AND F of 02 Nos LED High Mast Light AND repair work of external electrification LED light pole painting with cabeling work 22-May-2018 10:00 AM293.79
62SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_205936_1215S/F of 150 Ltr. Capacity 04 Nos. water cooler. RO water purifier 04 Nos., 4KVA stabilizer, Construction of water cooler case, GI pipe line construction and S/F of LED flood light on old high mast with Cabling, main Switch etc. cabling AND Constructi22-May-2018 10:00 AM250.00
63SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_205964_1215S/F of 150 Ltr. Capacity 05 Nos. water cooler. RO water purifier 05 Nos., 4KVA stabilizer, Construction of water cooler case, GI pipe line construction and Repairing work of External Electrification, LED light, Pole painting and cabling work22-May-2018 10:00 AM454.83
64SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_206184_1215External Electrification, LED light, Pole painting and cabling22-May-2018 10:00 AM250.00
65SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_206317_1E/M(325)/2018-215-2CS/F of LED Light 200W 24Nos 110 to 130W 40Nos Steel Tubular Pole 05Nos Wiring in toilet block gate lights RO water purifier and Cable laying works etc at NMY Fish Market Lucknow23-May-2018 09:00 AM250.00
66SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_217872_1438Comprehensive maintenance of seven No. Lifts16-Jun-2018 09:00 AM250.00
67SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227505_1215Supply item Repairing Electrical work 11-Jul-2018 09:00 AM250.00
68SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_209127_1E/M(325)/2018-230-5Repairing of LT Line SF of LED Light Cabling works etc At NMY Haidergarh Barabanki26-May-2018 06:00 PM250.00
69SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_209155_1E/M(325)/2018-230-1Repairing Rewiring of Internal Electrification in diffrent type Bld And APF 04 Nos Pump House 02Nos at at NMY Mahamudabad26-May-2018 06:00 PM250.00
70SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_209247_1E/M(325)/2018-230-2BInternal Electrification in office BuildingAPF 12 88 Mtr 01 Nos A type Shop 07Nos B type shop 05Nos C type shop 25Nos Check Post Record Room at NMY Risiya Distt Behraich26-May-2018 06:00 PM250.00
71SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_209339_1E/M(325)/2018-230-2AReparing of LT Line HT Line SF of LED light 0f Cabling Works at NMY Reciya Baharich26-May-2018 06:00 PM258.59
72SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_209407_1E/M(325)/2018-230-3AExsiting High Mast Lighting system and Existing MHL Light convert into LED Light at NMY Bahraich26-May-2018 06:00 PM359.43
73SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_209432_1E/M(325)/2018-230-3BSITC 02 No 30 mtr LED High Mast Lighting system and Existing MHL Light convert into LED Light and SF of 150Ltr Capacity 02Nos water cooler RO water purifier 02Nos, 4KVA Steblizer Construction of water cooler case GI Pipe line and cabling work at NMY26-May-2018 06:00 PM332.20
74SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_209498_1E/M(325)/2018-230-6SF of Led light 110 W to 130W Steel Tubuler Pole cabling work Etc At NMY Leaharpur 26-May-2018 06:00 PM250.00
75SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_209771_1E/M(325)/2018-230-4Repairing shifting of LT line and of 110 to 130 watt LED Light DB of 500 Amp for sub station TPMO DO fuse etc and Cable laying works SF of 150Ltr Capacity 03Nos water cooler RO water purifier 03Nos 4KVA Steblizer Construction of water cooler cas28-May-2018 09:00 AM250.00
76SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_210002_1E/M (325)/2018-291, Dated 25/05/2018Providing Manpower Services of Electrician, Lift Oprater and Pump Oprater at Kisan Mandi Bhawan Gomtinagar, Lucknow29-May-2018 09:00 AM264.21
77SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_210002_2E/M (325)/2018-291, Dated 25/05/2018Comprehensive Maintenance of 07 Nos Lift Capaciy 13 Passenger (884 Kg) installed in Kishan Mandi Bhawan Gomti Nagar Lucknow29-May-2018 09:00 AM250.00
78SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_224965_1E/M(325)/2018-272-2ARepairing of LT Line SF of LED Street Light related works At NMY Karnailganj Gonda05-Jul-2018 04:00 PM250.00
79SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_224994_1E/M(325)/2018-272-2BRepairing of Internal electrification in A B C type shop APF canteen Pump house office check post At NMY Kaarnailganj Gonda05-Jul-2018 04:00 PM250.00
80SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225088_1E/M(325)/2018-272-1AConstruction of LTLine Double Pole Structure SF of 63KVA Transformer LED street light on pole Cabling Works etc at NMY Safdarganj Barabanki05-Jul-2018 04:00 PM250.00
81SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225123_1E/M(325)/2018-272-1BSupply Erection Testing Commissioning of 2 Nos 16 Mtr High Mast Lighting System with 8 Nos LED Flood Light at NMY Safdarganj Barabanki05-Jul-2018 04:00 PM250.00
82SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225148_1E/M(325)/2018-272-6AInternal Electrification in B Type Shops 06Nos C Type Shops 20Nos APF12 88 03 Nos APF 9 16 01 No Gate02Nos Toilet Block Grain Etc at NMY Gonda05-Jul-2018 04:00 PM250.00
83SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225168_1E/M(325)/2018-272-6BInternal Electrification in B Type Shops 08Nos C Type Shops 20Nos Supper market 20 Nos Gate02 No Toilet Block and Rewiring of Internal electrification in office building Fruit and Vegetable NMY FV Gonda05-Jul-2018 04:00 PM250.00
84SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225187_1E/M(325)/2018-272-6CRepairing of LT Line SF of LED light Cabling works etc at NMY FV Gonda05-Jul-2018 04:30 PM250.00
85SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225782_1E/M(325)/2018-230-R5Repairing of LT Line SF of LED Light Cabling works etc At NMY Haidergarh Barabanki06-Jul-2018 04:00 PM250.00
86SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225862_1E/M(325)/2018-230-R3AExsiting High Mast Lighting system and Existing MHL Light convert into LED Light at NMY Bahraich06-Jul-2018 04:00 PM359.43
87SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225882_1E/M(325)/2018-230-3ASITC 02 No 30 mtr LED High Mast Lighting system and Existing MHL Light convert into LED Light and SF of 150Ltr Capacity 02Nos water cooler RO water purifier work at NMY Bahraich06-Jul-2018 04:00 PM332.20
88SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225903_1E/M(325)/2018-230-R1Repairing Rewiring of Internal Electrification in diffrent type Bld And APF 04 Nos Pump House 02Nos at at NMY Mahamudabad06-Jul-2018 04:00 PM250.00
89SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225925_1E/M(325)/2018-230-R2AReparing of LT Line HT Line SF of LED light 0f Cabling Works at NMY Reciya bahraich06-Jul-2018 04:00 PM258.59
90SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225936_1E/M(325)/2018-230-R2BInternal Electrification in office BuildingAPF 12 88 Mtr 01 Nos A type Shop 07Nos B type shop 05Nos C type shop 25Nos Check Post Record Room at NMY Risiya Distt Behraich06-Jul-2018 04:00 PM250.00
91SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_225953_1E/M(325)/2018-215-R11Internal Electrification in Staff Qtrs Type offices pump house check post A type shop 5 nos B type shop 10 nos C type shop 27 nos APF in vegetable market at NMY Safdarganj Barabanki06-Jul-2018 04:00 PM283.03
92SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_226937_1E/M(325)/2018-215-R10Internal wiring in check post WB Room Repairing of LT Line SF of Led Light on pole High Mast SF of 150Ltr Capacity 03Nos water cooler RO water purifier 03Nos 4KVA Steblizer at NMY Madhawganj10-Jul-2018 09:00 AM264.49
93SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_226952_1E/M(325)/2018-215-R9Repairing of Internal Wiring in office Building Internal Wiring in APF M 02Nos Repariring of LT Line Led Light cabling work Etc NMY Sandila Hardoi 10-Jul-2018 09:00 AM250.00
94SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_226983_1E/M(325)/2018-215-R6SF of Led light 110 to 130W Steel Tubuler Pole cabling work Etc At NMY Leaharpur10-Jul-2018 09:00 AM250.00
95SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227008_1E/M(325)/2018-215-R3SF of Led Light on pole High Mast at NMY Sitapur10-Jul-2018 09:00 AM361.86
96SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227206_1E/M(325)/2018-215-R4ARepairing of LT Line Replacement of Damage Pole SF of Led Light at at NMY Sahabad10-Jul-2018 01:00 PM250.00
97SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227213_1E/M(325)/2018-215-R4BSupply Erection Testing Commissioning of 3 Nos 16 Mtr High Mast Lighting System with 8 Nos LED Flood Light at NMY Sahabad 10-Jul-2018 01:00 PM250.00
98SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227771_1215/5Repairing /Extension of L.T. Line, cabling, S/F of 15 HP. Submersible Pump, Panel etc. at NMY Chakarpur, Bhauti Kanpur11-Jul-2018 04:00 PM411.73
99SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227788_1215/1Street Light convert in to LED Light, LT Line work, Cabling and other Related work at Mandi Parishad Awasiya Colony Gomti Nagar LKO.11-Jul-2018 04:30 PM250.00
100SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227671_1E/M(325)/2018-230-R4Repairing shifting of LT line sub station TPMO DO fuse etc and Cable laying works SF of 150Ltr Capacity 03Nos water cooler RO water purifier 03Nos 4KVA Steblizer Construction of water cooler case GI Pipe line and cabling work at NMY Bangarmau12-Jul-2018 09:00 AM250.00
101SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227685_1E/M(325)/2018-215-R2BSF of LED Light Capacity 01Nos water cooler RO water purifier 01Nos 4KVA Steblizer Construction of water cooler case GI Pipe line and cabling work at NMY Dubbagga Lucknow12-Jul-2018 09:00 AM250.00
102SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227692_1E/M(325)/2018-215-R2CSF of LED Light 200W 24Nos 110 to 130W 40Nos Steel Tubular Pole 05Nos Wiring in toilet block gate lights RO water purifier and Cable laying works etc at NMY Fish Market Lucknow12-Jul-2018 09:00 AM250.00
103SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227705_1E/M(325)/2018-215-R2ASF of LED Light 200W 64Nos 110W to 130W68Nos Steel Tubular Pole 09Nos Submersible Pump 02Nos wiring in toilet block MCCB control panel gate 15HP lightes and Cabling works etc at NMY Sitapur Rd Lucknow12-Jul-2018 09:00 AM436.47
104SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227724_1E/M(325)/2018-215-R7ASF of 150 Ltr Capacity 04 Nos water cooler RO water purifier 04 Nos 4KVA stabilize LED flood light on old high mast with Cabling, main Switch etc. cabling Construction of Tube Well SF of 1 0 HP Submersible Pump work at NMY Chibramau Distt Kannouj12-Jul-2018 09:00 AM250.00
105SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227743_1E/M(325)/2018-215-R4ASF of 150 Ltr Capacity 05 Nos water cooler RO water purifier 05 Nos 4KVA stabilizer Construction of water cooler case GI pipe line construction and RO water purifier 02 Nos 4KVA stabilizer NMY Fruit Mandi Arrah Pahadpur Distt Farukhabad12-Jul-2018 09:00 AM454.89
106SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227752_1E/M(325)/2018-215-R4BSF of 02 Nos LED High Mast Light repair work of external electrification LED light pole painting with cabeling work at fruit mandi, Arrah Pahadpur Dist Farukhabad12-Jul-2018 09:00 AM293.79
107SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227762_1E/M(325)/2018-215-R6Repairing work of External Electrification LED light Pole painting and SF of 01 Nos LED High Mast Light with cabling work at NMY Kamalganj Mandi Distt Farukhabad12-Jul-2018 09:00 AM250.00
108SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227778_1E/M(325)/2018-215-R7BExternal Electrification LED light Pole painting and cabling work at NMY Chibramau Distt Kannouj12-Jul-2018 09:00 AM255.43
109SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_227791_1E/M(325)/2018-215-R8External Electrification LED light Pole painting and cabling work at NMY Kannouj12-Jul-2018 09:00 AM250.00
110SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_235481_1E/M 746Comprehensive Maintenance of VIP Lift and Passenger Lift02-Aug-2018 06:30 PM250.00
111SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_235743_1E/M 746-IDecoration of Kissan Mandi Bhawan, Gomti Nagar, Lucknow02-Aug-2018 06:40 PM1237.62
112SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_248209_1e/m 951Comprehensive Maintenance of 07 Lifts Capacity 13 Passenger installed in kissan Mandi Bhawan Gomti Nagar LKO.11-Sep-2018 10:00 AM250.00
113SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249089_1E/M,325,980S/F of water cooler.with RO,LED flood light on old high mast with Cabling, main Switch etc. Cons. of Tube Well and S/F of 1.0 H.P. Submersible Pump .17-Sep-2018 10:00 AM250.00
114SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249097_1E/M,325,980A,Repairing of External Electrification and Supply /Fixing of LED Light on Pole etc. works.17-Sep-2018 10:00 AM255.43
115SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249116_1E/M,325/980/BRepairing work of External Electrification, LED light, Pole painting and S/F of 01 Nos LED High Mast Light with cabling work at N.M.Y Kamalganj Mandi, Distt. Farukhabad.17-Sep-2018 10:00 AM250.00
116SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249132_1E/M,325/2018/980CInternal Electrification in Different Types Building and Shops17-Sep-2018 10:00 AM283.03
117SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249144_1E/M,325/2018/980DInternal Electrification in Different Type Building/ Shops and A.P.F. etc.17-Sep-2018 10:00 AM250.00
118SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249153_1E/M,325/2018/980ERepairing Of H.T. /L.T Line and S/F of LED lights etc. 17-Sep-2018 10:00 AM258.59
119SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249160_1E/M,325/2018/980ES/F of LED Light in 30 Mtr. Hight High Mast Light and Repairing of LT Line etc.17-Sep-2018 10:00 AM359.43
120SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249543_1E/M/325/980Repairing of L.T. Line, S/F of LED Light and Cabling works and Internal Rewiring A.P.F. 02Nos. 17-Sep-2018 10:00 AM250.00
121SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249624_1E/M/325/980Repairing of Internal Wiring in office Building, Internal Wiring in A.P.F. 12x44M- 02Nos, Repairing of L.T. Line Led Light and cabling work Etc .17-Sep-2018 10:00 AM250.00
122SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249643_1E/M/325/980Repairing of L.T. Line. and Replacement of Damage Pole, S/F of Led Light17-Sep-2018 10:00 AM335.59
123SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249680_1E/M,325/980G Internal wiring in check post and W.B. Room Repairing of L.T. Line, S/F of Led Light on pole and High Mast and S/F of 150Ltr. Capacity 03Nos. water cooler. RO water purifier 03Nos, 4KVA Steblizer. 17-Sep-2018 10:00 AM264.49
124SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249692_1 E/M,325/980H Repairing /Extension of LT Line, cabling, S/F of 15 HP Submersible Pump, Panel etc. 17-Sep-2018 10:00 AM411.73
125SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249709_1 E/M,325/980ISTREET LIGHT CONVERT INTO LED LIGHT, LT LINE WORK, CABLING and OTHER RELATED WORK AT MANDI PARISHAD, AWASIYA COLONY17-Sep-2018 10:00 AM250.00
126SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249773_1 E/M,325/980J/F of LED Light-200W-64Nos, 110W to 130W-68Nos,Steel Tubular Pole-09Nos, 15HP Submersible Pump-02Nos, wiring in toilet block ,MCCB control panel, gate lightes and Cabling works etc.17-Sep-2018 10:00 AM436.47
127SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249783_1 E/M,325/980K S/F of LED Light-200W-24Nos, 110 to 130W-40Nos, Steel Tubular Pole-05Nos, Wiring in toilet block, gate lights RO water purifier and Cable laying works etc. OR S/F of LED Light-200W-24Nos, 110 to 130W-40Nos, Steel Tubular Pole17-Sep-2018 10:00 AM250.00
128SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249817_1E/M,325/980LS/F of water cooler witth R.O., LED Light-200W-24Nos,110 to 130W-35Nos,Steel Tubular Pole-08Nos,Rewiring of Office and toilet block, tightening of LT line, DB of 500 Amp for substation and Cabling laying works etc.17-Sep-2018 10:00 AM250.00
129SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_249824_1E/M,325/980L Repairing of LT Line and internal Electrification in APFetc. At N.M.Y. F and V Gonda.17-Sep-2018 10:00 AM334.04
130SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_250547_1 E/M,325/980PInternal Electrification in Buildings APF. And Repairing of L.T. Line at NMY Mahmoodabad.17-Sep-2018 10:00 AM280.40
131SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_250567_1E/M,325/980PInternal Electrification,Lighting System and AC Works in Office of OSD , Legal at Kisan Mandi Bhawan Gomti Nagar, Lko17-Sep-2018 10:00 AM250.00
132SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_250576_1E/M,325/ 2018/980R Internal Wiring in Godawn 1000Mt- 03Nos , S/F of Steel Tubular Pole and LED Street Light-16 Nos.etc. at N.M.Y.Lakhimpur.17-Sep-2018 10:00 AM250.00
133SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_250847_1E/M,325/ 2018/980RInternal Rewiring in A.P.F. 4No and 7Nos , S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos, 4KVA Steblizer, Construction of water cooler case, GI Pipe line and cabling work 17-Sep-2018 10:00 AM250.00
134SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_250858_1 E/M,325/ 2018/980S Internal Wiring in APF, Pump House, Repairing of L.T. Line. and S/F T.P.M.O. Set , LED Light on Pole OR High Mast, 03Nos. water cooler with RO and cabling work etc. 17-Sep-2018 10:00 AM314.69
135SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253540_1 E/M/325/1042G Extension of LT Line, S/F of LED Light and Cabling Work at NMY (F and V ) Gonda.28-Sep-2018 10:00 AM250.00
136SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253544_1E/M/325/1042HRepairing of Internal electrification in A B C type shop, APF canteen, Pump house, office and repairing of LT Line At NMY Karnailganj, Gonda.28-Sep-2018 10:00 AM319.36
137SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253546_1 E/M/325/1042H R /S of LT line , S/F of LED Light on Pole/ High Mast, Cabling and S/F of water cooler/ RO water purifier 03Nos water cooler etc. work at NMY. Bangermau28-Sep-2018 10:00 AM275.75
138SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253550_1E/M/325/1042IRepairing of L.T. Line. and S/F of Led Light on pole and High Mast .at NMY Sandi28-Sep-2018 10:00 AM250.00
139SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253554_1 E/M/325/1042JS/F of Led light, Steel Tubuler Pole and cabling work Etc, Repairing of Internal Electrification At N.M.Y. Leaharpur. 28-Sep-2018 10:00 AM250.00
140SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253558_1 E/M/325/1042K S/F of Led Light on pole and High Mast and Internal Rewiring at NMY Sitapur 28-Sep-2018 10:00 AM431.43
141SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253562_1 E/M/325/1042L S/F of Over Head Retro Reflective sign board and Cantilever Retro Reflective sign board at N.M.Y. Sandi.28-Sep-2018 10:00 AM250.00
142SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253565_1 E/M/325/1042M Internal Electrifiication in Pestiside Lab at NMYNauvasta, Kanpur, Distt.- Kanpur Nagar.28-Sep-2018 10:00 AM250.00
143SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253566_1 E/M/325/1042M Internal Electrifiication in Kisan Shop-10 No. at NMY Uttaripira Distt. Kanpur.28-Sep-2018 10:00 AM250.00
144SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253575_1 E/M/325/1042M External Electrification, LED Light on old high mast light at N.M.Y Kannauj and External Electrification, LED light, Pole painting and cabling work at SMY Tirwa Distt. Kannauj28-Sep-2018 10:00 AM305.52
145SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253720_1 E/M/325/1042N Internal Electrification in different type and Building Etc.and Rewiring of Internal electrification in office building at NMY (F/V and Grain) Gonda.28-Sep-2018 10:00 AM426.64
146SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253816_1E/M/325/1042PS/I of 25KVA silent D.G. Set, S/F of LED Light and Reparing of H.M.Lighting system with related cabling works etc. at N.M.Y. Mohommadi (Lakhimpur).28-Sep-2018 10:00 AM250.00
147SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_253823_1E/M/325/1042QS/F of 150Ltr. Capacity 02 Nos. water Cooler, RO. Water Purifier 02 Nos., KVA Steblizer, Construction of water cooler case, G.I. Pipe line and cabling work at Kissan Bazar Gomti Nagar, Lucknow.28-Sep-2018 10:00 AM250.00
148SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_252670_1E/M/325/1042AS/F of 150 Ltr. Capacity 05 Nos. water cooler. RO water purifie, 05 No.External Electrification, LED light, Pole painting and cabling work and L.E.D. Light on old high mast light etc. at N.M.Y. Satanpur Mandi and S/F of 150 Ltr. Capacity 02 Nos. wa28-Sep-2018 10:30 AM533.32
149SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_252692_1 E/M/325/1042B S/F of 02 Nos LED High Mast Light and repair work of external electrification LED light pole painting with cabeling work 28-Sep-2018 10:30 AM293.79
150SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_252927_1 E/M/325/1042C Construction of L.T.Line,LED street light on pole and Cabling Works and s/i/t/c of 2 Nos. 16 Mtr.High Mast Lighting System t at N.M.Y. Safdarganj ,Barabanki.28-Sep-2018 10:30 AM352.15
151SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_252932_1 E/M/325/1042F S/F of LED light in 30M highmast , 150 Litre capacity water cooler and repairing of LT line at NMY Bahraich.28-Sep-2018 10:30 AM332.20
152SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_263159_1 E/M/325/1237A Internal Electrification in Pump House at NMY Mihirpurwa, Distt. Bahraich.17-Oct-2018 03:00 PM250.00
153SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_263191_1 E/M/325/1237B Construction of Tubewell size 300mm. X 200mm. And S/F of 15 H.P. Submersible Pump at Kissan Mandi Bhawan, LKO.17-Oct-2018 03:00 PM306.39
154SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_263209_1 E/M/325/1237C S/F of LED Light on High mast and Steel Tubular Pole, wiring in toilet block ,control panel and RO and Cabling works etc. at NMY Fish Market, Lucknow17-Oct-2018 03:00 PM250.00
155SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_263224_1 E/M/325/1237D Internal Electrification inToilet Block-02 No. at NMY Arrah Pahadpur, Distt. Farukhabad17-Oct-2018 03:00 PM250.00
156SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_263240_1E/M/325/1237EInternal Electrification inToilet Block-02 No. at NMYHardoi Distt. Hardoi17-Oct-2018 03:00 PM250.00
157SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_263252_1 E/M/325/1237F Internal Electrification in different type shops and Building at N.M.Y Kernailganj Distt. Gonda.17-Oct-2018 03:00 PM250.00
158SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_263405_1 E/M/325/1237G CONSTRUCTION OF TUBE WELL SIZE 300mm x 200mm and S/F of 15 H.P Submersible Pump AT N.M.Y. Mihipurwa (Bahraich)17-Oct-2018 05:00 PM250.00
159SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_263263_1 E/M/325/1237F Internal Electrification in different Type Shops , Repairing and extention of L.T. Line at NMY Nawab ganj. Distt. Gonda18-Oct-2018 01:00 PM254.85
160SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_263741_1E/M/325/1237G Internal And External Electrifiication in 1000 MT Godown at NMY Gonda.18-Oct-2018 01:00 PM250.00
161SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_263809_1 E/M/325/1237H Internal Electrification in Different Type Shops, Supper market and Toilet Block Etc. Or Rewiring of Internal electrification in office building at N.M.Y (F/V and Grain) Gonda. Distt. Gonda18-Oct-2018 04:15 PM426.63
162SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_281344_1E/M(325)/2018-1566Annual Comprehensive Maintenance and Operation of 680 Ton A.C. Plant Systen Installed at NMY Kissan Mandi Bhawan11-Dec-2018 10:00 AM326.92
163SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_283637_1E/MVHT/2018-1597S/I/T/C of 2.5 MT Capacity VHT Machine with related work and Puff Paneling at Mango Pack House , Rahmankhera, Lucknow14-Dec-2018 03:00 PM4576.94
164SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_287962_1 E/M(325)/2018-1665 Internal Electrification in ModernToilet Block 3Nos. at NMY Chibramau27-Dec-2018 10:30 AM250.00
165SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_287982_1E/M(325)/2018-1665-IDecoration Of Kissan Mandi Bhawan Building, Gomti Nagar, Lucknow on Republic Day, 201927-Dec-2018 10:30 AM250.00
166SE Zone-1||Dy Director Construction(E-M), Lucknow2018_RKUMP_287998_1 E/M(325)/2018-1665 Internal Electrification in ModernToilet Block and its related work at NMY Bangermau,Unnao27-Dec-2018 10:30 AM250.00
167SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_293972_2 E/M(EOI)/2019-1744 Selection Of consultancy Agency as PMC for the Design, tendering, Technical Project Supervision During execution and construction of Modern Cold Storage, Ripening Facilities And other Paraphernalia At 26 Selected APMC in UP.12-Jan-2019 10:00 AM250.00
168SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_295645_1E/M(325)/2018-1803 Supply/I/T/C of Full Colour Ticker Board Display Addressing system at Various Mandies in UP17-Jan-2019 12:00 PM250.00
169SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_296874_1E/M(325)/2019-1794 Repairing of HT/LT Line,with arial Bunch condutor and cabling works at NMY. Barabanki24-Jan-2019 10:00 AM484.74
170SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_296899_1E/M(325)/2019-1794 Rewirig of Enternal Electrification of A.P.F. 5 Nos. and S/F of 150Ltr. Capacity 02 Nos. water Cooler, RO. Water Purifier 02 Nos., KVA Steblizer, Construction of water cooler case, G.I. Pipe line and cabling work at NMY. Barabanki.24-Jan-2019 10:00 AM250.00
171SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_296916_1E/M(325)/2019-1794Repair work of enternal electrfication in guest house, Office, F.R.H. and LED Light on old High mast at N.M.Y. Jaswant Nagar, Etawah24-Jan-2019 10:00 AM383.38
172SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_296928_1E/M(325)/2019-1794 Repair work of L.T. Line, LED Light, Pole Painting, Cabling Work and S/I of 25KVA silent D.G. Set with related cabling works etc. at N.M.Y. Jaswant Nagar, Distt . Etawah24-Jan-2019 10:00 AM310.19
173SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_296937_1E/M(325)/2019-1794 S/F LED Light in Existing, High Mast Lighting system 04 nos. and LED Street on Pole at N.M.Y. Unnao.24-Jan-2019 10:00 AM250.00
174SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_296941_1 E/M(325)/2019-1794 S/F of 150 Ltr. Capacity 03 Nos. water cooler with RO System and External Electrification, LED Light and Internal Electrification in APF. 12 X 88m -1No. with cabling work at N.M.Y. Shamshabad, Kaimganj Distt. Farukhabad.24-Jan-2019 10:00 AM250.00
175SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_297844_1 E/M(325)/2019-1794 External Electrification and Internal Electrifiication in Office Building, A.P.F., C Type Shop-06 No., Godown, Guard Roomat NMY Pihani Distt.-Hardoi.24-Jan-2019 10:00 AM250.00
176SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_297865_1E/M(325)/2019-1794 S/F of Cantilever Retro Reflective Sign Board 02 nos. at SMY Pihani, Shahabad Distt. Hardoi.24-Jan-2019 10:00 AM250.00
177SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_300076_1 E/M(VHT)/2019-1821 S/I/T/C of 2.5 MT Capacity VHT Machine with related work and Puff Paneling at Mango Pack House, Rahmankhera, Lko.28-Jan-2019 06:30 PM4576.94
178SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_303958_1E/M(325)/2019-1871 Supply/I/T/C of Full Colour Ticker Board Display Addressing system at Various Mandies in UP05-Feb-2019 06:00 PM250.00
179SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_313259_1E/M(325)/2019-1911S/F of Cantilever Retro Reflective Sign Board 02 nos. at SMY Pihani, Shahabad Distt. Hardoi.21-Feb-2019 10:30 AM250.00
180SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_313280_1 E/M(325)/2019-1911 Internal and External Electrification and S/F of LED Light at NMY Laherpur21-Feb-2019 10:30 AM250.00
181SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_313299_1E/M(325)/2019-1911 Internal and External Electrification and S/F of LED Light at NMY Sitapur.21-Feb-2019 10:30 AM250.00
182SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_313318_1E/M(325)/2019-1911 Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri.21-Feb-2019 10:30 AM250.00
183SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_313336_1 E/M(325)/2019-1911 Internal Electrification in Toilet Block and its related work at NMY Madhoganj.21-Feb-2019 10:30 AM250.00
184SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_313366_1E/M(325)/2019-1911 Internal wiring in Modern Toilet Block 01 nos. at NMY Kaimganj, Distt. Farukhabad.21-Feb-2019 10:30 AM250.00
185SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_313453_1 E/M(325)/2019-1911 Repairing of H.T./ L.T. Line, Rewiring of Internal electrification in defferent Type Buildings / Shops and Constrution of Tubwell 02 Nos. and S/F of 1 HP. Submersible Pump at NMY Kesarganj, Bahraich.21-Feb-2019 10:30 AM291.10
186SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_313482_1E/M(325)/2019-1911 Internal Electrification in Toilet Block works etc. at NMY Bahraich.21-Feb-2019 10:30 AM250.00
187SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_315539_1E/M(325)/2019-1911Internal Eiectrification in office Building,Guest House and vipdan room and Extension of LT Line /External Electrification and Double Pole Structure, Cabling Work etc at NMY Baripal Kanpur.21-Feb-2019 10:30 AM265.38
188SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_315569_1 E/M(325)/2019-1911 Repaiting of LT Line and S/F of Street Light at NMY Achhalda Distt. Auraiya.21-Feb-2019 10:30 AM250.00
189SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_315639_1 E/M(325)/2019-1911 S/F of 150 Ltr. Capacity 02 Nos. water cooler,RO water purifier 02 Nos., 4 KVA Steblizer, Construction of water cooler case and cabling work at NMY Unnao.21-Feb-2019 10:30 AM250.00
190SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_315746_1E/M(325)/2019-1911 Repairing of LT.Line ,wire tightening , pole painting, LED Light on pole, 02 Nos. 16 Metre High Mast Light and Lighting arrangement in APF etc. at NMY Purwa, Distt. Unnao.21-Feb-2019 10:30 AM250.00
191SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_315787_1E/M(325)/2019-1911S/F of GI Pole, LED Light,Cabling works etc. OR Internal Electrification in Office Building, C Type Shops 05 Nos, Check Post, Toilet Block in APC 02 Nos, Etc. at S.M.Y Bighapur Distt. Unnao21-Feb-2019 10:30 AM250.00
192SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_315812_1 E/M(325)/2019-1911 S/F of Cantilever Retro Reflective Sign Board 02 nos. at SMY Bighapur, Purwa.21-Feb-2019 10:30 AM250.00
193SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_315835_1E/M(325)/2019-1911 Supply installation, demonstration and amp commissioning of Computerized Scada PLC based Seed Pre cleaner , Grain cleaner with Elevator Capacity 3TPH at NMY. Grain Gonda 21-Feb-2019 10:30 AM250.00
194SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_317081_1E/M(325)/2019-1960Rewirig of Enternal Electrification of A.P.F. 5 Nos. and S/F of 150Ltr. Capacity 02 Nos. water Cooler, RO. Water Purifier 02 Nos, KVA Steblizer, Construction of water cooler case, G.I. Pipe line and cabling work at NMY. Barabanki.22-Feb-2019 10:00 AM250.00
195SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_317116_1E/M(325)/2019-1960Repair work of L.T. Line, LED Light, Pole Painting, Cabling Work and S/I of 25KVA silent D.G. Set with related cabling works etc. at N.M.Y Jaswant Nagar, Distt . Etawah.22-Feb-2019 10:00 AM310.19
196SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_318335_1E/M(325)/2019-1960Repairing of HT/LT Line,with arial Bunch condutor and cabling works at NMY. Barabanki.22-Feb-2019 01:30 PM484.74
197SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_318763_1E/M(325)/2019-1941Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Tikonia.25-Feb-2019 10:00 AM250.00
198SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_318867_1E/M(325)/2019-1941Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Tirwaganj.25-Feb-2019 10:00 AM250.00
199SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_318911_1 E/M(325)/2019-1941 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Kesarganj.25-Feb-2019 10:00 AM250.00
200SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_320319_1E/M(325)/2019-1941 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Dubagga.25-Feb-2019 10:00 AM250.00
201SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_320399_1E/M(325)/2019-1941 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Achhalda.25-Feb-2019 10:00 AM250.00
202SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_320450_1E/M(325)/2019-1941 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Dibiyapur.25-Feb-2019 10:00 AM250.00
203SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_320484_1 E/M(325)/2019-1941 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Mohammadabad.25-Feb-2019 10:00 AM250.00
204SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_320535_1E/M(325)/2019-1941 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mahmudabad.25-Feb-2019 10:00 AM382.32
205SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_322186_1E/M(325)/2019-1941 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Chibramau.25-Feb-2019 12:30 PM382.32
206SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_322229_1E/M(325)/2019-1941 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Farukhabad.25-Feb-2019 12:40 PM382.32
207SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_322261_1E/M(325)/2019-1941 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Kannauj.25-Feb-2019 12:55 PM382.32
208SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_322290_1E/M(325)/2019-1941Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Madhoganj.25-Feb-2019 01:10 PM382.32
209SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_322320_1E/M(325)/2019-1941Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mohammadi.25-Feb-2019 01:20 PM382.32
210SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_322354_1E/M(325)/2019-1941Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Shahabad.25-Feb-2019 01:35 PM382.32
211SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_322375_1E/M(325)/2019-1941Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Sandila.25-Feb-2019 01:45 PM382.32
212SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_322401_1E/M(325)/2019-1941Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Kernailganj.25-Feb-2019 02:10 PM382.32
213SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_322441_1E/M(325)/2019-1941Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Jaswantnagar.25-Feb-2019 02:15 PM382.32
214SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335499_1E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mahmudabad.09-Mar-2019 05:00 PM382.32
215SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335523_1 E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Chibramau.09-Mar-2019 05:00 PM382.32
216SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335541_1E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Farukhabad.09-Mar-2019 05:00 PM382.32
217SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335557_1E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Kannauj.09-Mar-2019 05:00 PM382.32
218SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335565_1 E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Madhoganj.09-Mar-2019 05:00 PM382.32
219SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335572_1E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mohammadi.09-Mar-2019 05:00 PM382.32
220SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335581_1 E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Shahabad.09-Mar-2019 05:00 PM382.32
221SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335589_1E/M(325)/2019-2062Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Sandila.09-Mar-2019 05:00 PM382.32
222SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335598_1E/M(325)/2019-2062Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Krenailganj.09-Mar-2019 05:00 PM382.32
223SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335607_1 E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Jaswantnagar.09-Mar-2019 05:00 PM382.32
224SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335614_1 E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Tikonia.09-Mar-2019 05:00 PM250.00
225SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335628_1 E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY Tirwaganj.09-Mar-2019 05:00 PM250.00
226SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335639_1 E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Kesarganj.09-Mar-2019 05:00 PM250.00
227SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335654_1E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Dubagga.09-Mar-2019 05:00 PM250.00
228SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335666_1E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Achalda.09-Mar-2019 05:00 PM250.00
229SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335675_1 E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Dibiyapur.09-Mar-2019 05:00 PM250.00
230SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335687_1 E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Mohammadabad.09-Mar-2019 05:00 PM250.00
231SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_335499_2E/M(325)/2019-2062 Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mahmudabad.09-Mar-2019 05:00 PM382.32
232SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_337512_1E/M(325)/2019-2066 Providing Man Power Services of Electrician, Lift Operater and Pump Operater at Kissan Mandi Bhawan Gomti Nagar, Lko.18-Mar-2019 10:00 AM277.53
233SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_337519_1E/M(325)/2019-2066 Operation of Fire Fighting and fire Alarm System at Kissan Mandi Bhawan, Gomti Nagar Lko18-Mar-2019 10:00 AM250.00
234SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_336757_1E/M(325)/2019-2066Internal and External Electrification and S/F of LED Light at NMY Sitapur.20-Mar-2019 10:00 AM250.00
235SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_336781_1E/M(325)/2019-2066Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri.20-Mar-2019 10:00 AM250.00
236SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_336791_1 E/M(325)/2019-2066 S/F of Cantilever Retro Reflective Sign Board 02 nos. at SMY Pihani, Shahabad Distt. Hardoi.20-Mar-2019 10:00 AM250.00
237SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_336803_1E/M(325)/2019-2066 S/F of Cantilever Retro Reflective Sign Board 02 nos. at SMY Pali, Shahabad Distt. Hardoi.20-Mar-2019 10:00 AM250.00
238SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_337183_1E/M(325)/2019-2066 Internal / External Electrification work s/f of 1 No. Semi High Mast Light at N.M.Y Maigalganj Distt. Lakhimpur Kheri.20-Mar-2019 10:00 AM250.00
239SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_337185_1 E/M(325)/2019-2066 S/E of 01 No Over Head Type Retro Reflective High Intensity Sign Board on Main Gate and 01 No Cantilever Type Retro Reflective High Intensity Sign Board on Main Road at NMY. Bangarmau Distt. Unnao.20-Mar-2019 10:00 AM250.00
240SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_337414_1E/M(325)/2019-2066 NMY BARIPAL, Distt. Kanpur Nagar.20-Mar-2019 10:00 AM250.00
241SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_337422_1E/M(325)/2019-2066 Extention of LT Line for Service Connection, S/F of Street LED Light etc. work AMH Paraukh NMY RURA Distt. Kanpur Dehat.20-Mar-2019 10:00 AM250.00
242SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_337523_1E/M(325)/2019-2066 Internal electrification in B type shop 14 Nos. check post 02 Nos. Godown 01 No.,Rewiring of staff Qtr. And Lighting System around Pounds at NMY Barabanki. 20-Mar-2019 10:00 AM321.05
243SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_337627_1 E/M(325)/2019-2066 Internal / External Electrifiication in Office Building, A.P.F., C Type Shop 06 No., Godown, Guard Room at NMY. Pali Distt. Hardoi.20-Mar-2019 10:00 AM250.00
244SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_337663_1E/M(325)/2019-2066 Repairing / Rewiring of residance type staff quarter, check post, pump house, APF,office, farmer rest house, toilet block and guest house at N.M.Y. Bangarmau,Unnao.20-Mar-2019 10:00 AM250.00
245SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_350821_1E/M(325)/2019-20-281Internal electrification in B type shop 14 Nos. check post 02 Nos. Godown 01 No.,Rewiring of staff Qtr. And Lighting System around Pounds at NMY Barabanki.07-Jun-2019 10:00 AM321.05
246SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_350862_1E/M(325)/2019-20-281Internal / External Electrification work s/f of 1 No. Semi High Mast Light at N.M.Y Maigalganj Distt. Lakhimpur Kheri.07-Jun-2019 10:00 AM250.00
247SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_350892_1E/M(325)/2019-20-281S/F of 150 Ltr. Capacity 03 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Case and other related Work at NMY BARIPAL, Distt. Kanpur Nagar.07-Jun-2019 10:00 AM250.00
248SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_350944_1E/M(325)/2019-20-281Extention of LT Line for Service Connection S/F of Street LED Light etc work AMH Paraukh NMY RURA Distt Kanpur Dehat07-Jun-2019 10:00 AM250.00
249SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_350978_1E/M(325)/2019-20-281Internal / External Electrifiication in Office Building, A.P.F , C Type Shop 06 No, Godown, Guard Room at NMY Pali Distt. Hardoi.07-Jun-2019 10:00 AM250.00
250SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_350994_1E/M(325)/2019-20-281Internal and External Electrification and S/F of LED Light at NMY Sitapur.07-Jun-2019 10:00 AM250.00
251SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351025_1E/M(325)/2019-20-281Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri07-Jun-2019 10:00 AM250.00
252SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351165_1E/M(325)/2019-20-281Operation of Fire Fighting and fire Alarm System at Kissan Mandi Bhawan, Gomti Nagar Lko.07-Jun-2019 10:00 AM250.00
253SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351173_1E/M(325)/2019-20-281Providing Man Power Services of Electrician, Lift Operater and Pump Operater at Kissan Mandi Bhawan Gomti Nagar, Lko07-Jun-2019 10:00 AM277.53
254SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351180_1E/M(325)/2019-20-281Operation of DG Set 40 KVA with distribution Panel all Window AC etc, 24 Hrs. Operation at Kissan Mandi Bhawan, Gomti Nagar Lko07-Jun-2019 10:00 AM250.00
255SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351186_1E/M(325)/2019-20-281Repairing / Rewiring of residance type staff quarter, check post, pump house, APF,office, farmer rest house, toilet block and guest house at N.M.Y. Bangarmau,Unnao.07-Jun-2019 10:00 AM250.00
256SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351194_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Krenailganj.07-Jun-2019 10:00 AM382.32
257SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351197_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Sandila.07-Jun-2019 10:00 AM382.32
258SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351200_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Shahabad.07-Jun-2019 10:00 AM382.32
259SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351203_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mohammadi.07-Jun-2019 10:00 AM382.32
260SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351204_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Madhoganj.07-Jun-2019 10:00 AM382.32
261SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351491_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Kannauj.07-Jun-2019 10:00 AM382.32
262SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351505_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Farukhabad.07-Jun-2019 10:00 AM382.32
263SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351522_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized way Bridge for Three Years at NMY. Mahmudabad.07-Jun-2019 10:00 AM382.32
264SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351549_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Chibramau.07-Jun-2019 10:00 AM382.32
265SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351573_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Jaswantnagar.07-Jun-2019 10:00 AM382.32
266SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351593_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for Three Years at NMY. Tikonia.07-Jun-2019 10:00 AM250.00
267SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351603_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY Tirwaganj07-Jun-2019 10:00 AM250.00
268SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351611_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Kesarganj.07-Jun-2019 10:00 AM250.00
269SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351617_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Dubagga07-Jun-2019 10:00 AM250.00
270SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351624_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Achalda.07-Jun-2019 10:00 AM250.00
271SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351779_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Dibiyapur.07-Jun-2019 01:00 PM250.00
272SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_351790_1E/M(325)/2019-297Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized Waigh Bridge for Three Years at NMY. Mohammadabad.07-Jun-2019 01:10 PM250.00
273SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_361419_1E/M(325)/2019-443Internal / External Electrifiication in Office Building, A.P.F., C Type Shop 06 No., Godown, Guard Room at NMY. Pali Distt. Hardoi06-Jul-2019 01:35 PM250.00
274SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_361533_1E/M(325)/2019-443Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri06-Jul-2019 02:30 PM250.00
275SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_361584_1E/M(325)/2019-443S/E of 01 No Over Head Type Retro Reflective High Intensity Sign Board on Main Gate and 01 No Cantilever Type Retro Reflective High Intensity Sign Board on Main Road at NMY. Bangarmau Distt. Unnao.06-Jul-2019 04:00 PM250.00
276SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_361628_1E/M(325)/2019-443Operation of Fire Fighting and fire Alarm System at Kissan Mandi Bhawan, Gomti Nagar Lko.06-Jul-2019 05:00 PM250.00
277SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_361640_1E/M(325)/2019-443Providing Man Power Services of Electrician, Lift Operater and Pump Operater at Kissan Mandi Bhawan Gomti Nagar, Lko06-Jul-2019 05:15 PM277.53
278SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_361660_1E/M(325)/2019-443Internal wiring in Store Room and Lighting System at NMYMango Pack House, Rahman Khera, Lko06-Jul-2019 06:00 PM250.00
279SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_362085_1E/M(325)/2019-443Internal Electrification in Toilet Block and its related work at NMY Uttaripura, Distt. Kanpur Dehat.08-Jul-2019 04:30 PM250.00
280SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_365557_1E/M/325/2019-20-627Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Sitapur Road Lko.20-Jul-2019 03:00 PM264.02
281SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_365599_1E/M/325/2019-20-627Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Kaimganj, Farukhabad.20-Jul-2019 03:00 PM264.02
282SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_365606_1E/M/325/2019-20-627Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Paliya, Khiri.20-Jul-2019 03:00 PM264.02
283SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_365611_1E/M/325/2019-20-627Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Bahraich.20-Jul-2019 03:00 PM264.02
284SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_365294_1E/M/325/2019-20-542S/I/T/C of VHT Machine Capacity 2500 Kg Batch along with all accessories at Mango Pack House facility Rehmenkhera Lucknow.20-Jul-2019 05:00 PM4198.06
285SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_367033_1E/M/325/2019-20-693Decoration of Kisan Mandi Bhawan, Gomti Nagar, Lucknw on Independence Day 201926-Jul-2019 10:00 AM250.00
286SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_367071_1E/M/325/2019-20-689Internal wiring in Store Room and Lighting System at NMYMango Pack House, Rahman Khera, Lko.26-Jul-2019 10:30 AM250.00
287SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_367098_1E/M(325)/2019-689Providing Man Power Services of Electrician, Lift Operater and Pump Operater at Kissan Mandi Bhawan Gomti Nagar, Lko26-Jul-2019 10:30 AM277.53
288SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_367524_1E/M/325/2019-20-693Repairing work of L.T. Line, LED Light, Pole Painting, Cabling Work at N.M.Y, Bharthana, Distt. Etawah.27-Jul-2019 10:00 AM328.62
289SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_367535_1E/M/325/2019-20-693S/F of LED flood light on old high mast with Cabling, main Switch etc. Work and S/F of 15 H.P Submersible Pump AT N.M.Y. Bharthna,Etawah.27-Jul-2019 10:00 AM250.00
290SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_367616_1E/M/325/2019-20-689Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri27-Jul-2019 10:30 AM250.00
291SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_367622_1E/M/325/2019-20-689Internal / External Electrifiication in Office Building, A.P.F., C Type Shop 06 No., Godown, Guard Room at NMY. Pali Distt. Hardoi27-Jul-2019 10:30 AM250.00
292SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_367638_1E/M/325/2019-20-712Supply / Installation / Testing / Commissoning of VHT PLANT And Its related work at Mango Pack House RahmanKhera Lko.27-Jul-2019 01:00 PM4850.00
293SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_367895_1E/M 325/2019-443 /E/M 325/2019-689 DATED 22-07-19Internal Electrifiication in Toilet Block at NMY UttaripuraDistt.- Kanpur27-Jul-2019 05:30 PM250.00
294SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_374094_1E/M/325/2019-20-803Modernisation/Upgradation of 03 Nos. Passenger Lift 09 Stops Capacity, 13 Passenger 884Kg. Installed in Kissan Mandi Bhawan Gomti Nagar Lko.22-Aug-2019 02:40 PM588.68
295SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_378287_1E/M/325/2019-20-899Comprehensive Maintenance and Operation work of 1 No. 50 Mt. and 25 Mt. Electronic Computerized Weigh Bridge installed in Different Mandi Yards of U.P.05-Sep-2019 10:00 AM250.00
296SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_378329_1E/M/325/2019-20-916Providing Man Power Services of Electrician, Lift Operater and Pump Operater at Kissan Mandi Bhawan Gomti Nagar, Lko05-Sep-2019 10:00 AM277.53
297SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_378334_1E/M/325/2019-20-916Internal Electrification in Toilet Block and its related work at NMY PALIA, Kheri05-Sep-2019 10:00 AM250.00
298SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_378338_1E/M/325/2019-20-916Internal wiring in Store Room and Lighting System at NMY Mango Pack House, Rahman Khera, Lko.05-Sep-2019 04:00 PM250.00
299SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_378795_1E/M/325/2019-20-920Comprehensive Maintenance of 01 No. VIP Lift and 03 Nos. Passenger Lifts at Kisan Mandi Bhawan Vibhuti Khand Gomti Nagar Lko.06-Sep-2019 01:00 PM250.00
300SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_387134_1E/M/325/2019-20-1064Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Bahraich.01-Oct-2019 11:00 AM264.02
301SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_387186_1E/M/325/2019-20-1064Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Paliya, Khiri.01-Oct-2019 11:00 AM264.02
302SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_387606_1E/M/325/2019-20-1064Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Kaimganj, Farukhabad.01-Oct-2019 03:30 PM264.02
303SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_387774_1E/M/325/2019-20-1064Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Sitapur Road Lko03-Oct-2019 02:00 PM264.02
304SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_388773_1E/M/325/2019-20-1086Modernisation/Upgradation of 03 Nos. Passenger Lift 09 Stops Capacity, 13 Passenger 884Kg. Installed in Kissan Mandi Bhawan Gomti Nagar Lko.04-Oct-2019 02:00 PM588.68
305SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_393893_1E/M/325/2019-20-1189Outsouricing of Man Power Services at Kissan Mandi Bhawan, Vibuti Khand, Gomti Nagar LKO18-Oct-2019 02:40 PM277.53
306SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_398838_1E/M/325/2019-20-1230Modernisation/Upgradation of 03 Nos. Passenger Lift 09 Stops Capacity, 13 Passenger 884Kg. Installed in Kissan Mandi Bhawan Gomti Nagar Lko.02-Nov-2019 11:45 AM588.68
307SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_398845_1E/M/325/2019-20-1276Outsouricing of Man Power Services at Kissan Mandi Bhawan, Vibuti Khand, Gomti Nagar LKO02-Nov-2019 12:30 PM277.53
308SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_398865_1E/M/325/2019-20-1218S/F of Cubical Box, Stay Set and Cabling Works etc. At NMY Fish Market, hardoi Road, Lko.02-Nov-2019 12:35 PM250.00
309SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_399545_1E/M/325/2019-20-1218Internal/External Electrification in 1000 MT. Godown at N.M.Y. F/V Gonda Distt. Gonda.04-Nov-2019 04:30 PM250.00
310SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_399567_1E/M/325/2019-20-1218Internal Electrification in Toilet Block works etc. at NMY Barabanki04-Nov-2019 05:40 PM250.00
311SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_399631_1E/M/325/2019-20-1218Supply, installation, demonstration and amp commissioning of Computerized Scada PLC based Seed Pre cleaner / Grain cleaner with Elevator Capacity 3TPH at NMY Grain Gonda .04-Nov-2019 06:30 PM250.00
312SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_400166_1E/M/325/2019-20-1218Repair work of Rewiring Internal Electrification in A types shop 10 Nos. B type shop 10 Nos. C types shop 10 Nos. Staff Quarter 1 4 Nos., police chowki, Check Post 02 Nos. at N.M.Y. Kaimganj, District Farukhabad05-Nov-2019 06:15 PM250.00
313SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_400215_1E/M/325/2019-20-1218Internal Wiring in Office Building Farmer Rest House, Police Chowki, CheckPost 02 Nos. A Type Shop 2 Nos, B Type Shop 8 Nos, C Type Shop 14 Nos. APF 12X88 02 Nos. Sachiv Awas etc. at NMY Kamalganj. Distt. Farukhabad06-Nov-2019 12:00 PM250.00
314SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_400510_1E/M/325/2019-20-1218Internal Electrification Work in E NAM building, FRH, Canteen, Building at Modernise NMY Kaimganj, District Farukhabad06-Nov-2019 01:45 PM286.08
315SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_400428_1E/M/325/2019-20-1218S/F of 02 Nos LED High Mast Light and LED light on old High mast Light 16meter with accessories and LED Light on pole with cabling work at Modernised at NMY Kaimganj Distt. Farrukhabad.06-Nov-2019 02:20 PM268.37
316SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_400555_1E/M/325/2019-20-1218Internal Electrification Work in E-NAM building, FRH, Canteen, Building at Modernise NMY, Pailya District Kheeri06-Nov-2019 03:30 PM755.63
317SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_400585_1E/M/325/2019-20-1218Internal Electrification in Farmer Rest House at NMY Gola Distt. Lakhimpur06-Nov-2019 03:50 PM250.00
318SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_400603_1E/M/325/2019-20-1218Repairing of LT Line, Painting of Pole, S/F LED Street Light Fittings, S/I/T/C of 2 No. High Mast at NMY, Paila Distt. Kheeri06-Nov-2019 04:30 PM250.24
319SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_401007_1E/M/325/2019-20-1218Internal Electrification Work in building, C type shop 2 Nos, Toilet Block, check post and A.P.F. at Modernise NMY,Mishrikh District Sitapur07-Nov-2019 02:00 PM359.29
320SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_401023_1E/M/325/2019-20-1218S/E of 02 No Over Head Retro Reflective Sign Board and 01 No Cantilever Type Retro Reflective Sign Board at NMY. Mishrikh Distt. Sitapur.07-Nov-2019 03:00 PM250.00
321SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_401060_1E/M/325/2019-20-1218Internal Electrification / Cu. Rewiring of B Type shop 15 No., C Type shop 75 No., Police Chauwki and S/F of High Mast Lightening system, Cabling etc. at N.M.Y. Bangermau Distt. Unnao.07-Nov-2019 03:30 PM290.18
322SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_401074_1E/M/325/2019-20-1218Repairing of LT Line and S/F of High Mast 02 Nos. and S/F of LED light on pole and S/F of 03 nos. Water Cooler with RO and 15 HP Submersibile Pump at N.M.Y.Payagpur Distt. Bahraich.07-Nov-2019 04:20 PM250.00
323SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_401187_1E/M/325/2019-20-1218S/E of 01 No Over Head Retro Reflective Sign Board and 02 No Cantilever Type Retro Reflective Sign Board at NMY. Payagpur Distt. Bahraich.07-Nov-2019 05:30 PM250.00
324SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_401224_1E/M/325/2019-20-1218Internal Electrifiication in Toilet Block at NMY Risiya Distt. Bahraich07-Nov-2019 06:30 PM250.00
325SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_401788_1E/M/325/2019-20-1218Construction of H.T./L.T line,Double Pole Structure,S/F of 250 KVA Transformer 2No.,LED street light on pole , S/F of40/25 KVA DG Set and cabling works etc at N.M.Y. Bhinga Distt.Bahrich .09-Nov-2019 10:30 AM1513.76
326SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_401855_1E/M/325/2019-20-1218Internal Electrification in Different type Buildings, Shops and APF and Cabling works etc at N.M.Y. Bhinga Distt.Bahrich09-Nov-2019 12:00 PM537.71
327SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_401883_1E/M/325/2019-20-1218Supply, installation, demonstration and amp commissioning of Computerized Scada PLC based Seed Pre cleaner / Grain cleaner with Elevator Capacity 3TPH at NMY Grain Gonda .09-Nov-2019 01:10 PM250.00
328SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_402520_1E/M/325/2019-20-1064Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Kaimganj, Farukhabad11-Nov-2019 06:50 PM264.02
329SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_402783_1E/M/325/2019-20-1064Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Sitapur Road, Lucknow.12-Nov-2019 05:20 PM264.02
330SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_402796_1E/M/325/2019-20-1064Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Palia Kheeri.12-Nov-2019 05:45 PM264.02
331SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_402801_1E/M/325/2019-20-1064Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Bahraich12-Nov-2019 05:50 PM264.02
332SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_406467_1E/M/325/2019-20-1365Repairing of Automatic Electronic Sorting/Grading Line, Hot Water Immersion Treatment unit, S/o Plastic Crates, Hydraulic Pallet, Air Circulator, Tubular Drying Fan and Vacuum Cleaning Machine etc. at Mango Pack House, Rehman Khera Lko.22-Nov-2019 10:00 AM250.00
333SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_409909_1E/M/325/2019-20-1385Comprehensive Maintenance and Operation of 680 Ton A.C. Plant installed at Kisan Mandi Bhawan, Gomti Nagar, Lko.03-Dec-2019 02:50 PM326.92
334SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_412491_1E/M/325/2019-20-1475Repair work of Rewiring Internal Electrification in A types shop 10 Nos. B type shop 10 Nos. C types shop 10 Nos. Staff Quarter 14 Nos., police chowki, Check Post 02 Nos. at N.M.Y. Kaimganj, District Farrukhabad11-Dec-2019 04:00 PM250.00
335SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_412503_1E/M/325/2019-20-1475Supply, installation, demonstration and amp commissioning of Computerised Scada PLC based Seed Pre cleaner / Grain cleaner with Elevator Capacity 3TPH at NMY Grain Gonda.11-Dec-2019 04:00 PM250.00
336SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_412794_1E/M/325/2019-20-1475Internal Wiring in Old A, B, C Type Shops, APF 12X88 and New C Type Shops, Tiolet Block , S/F of Water Cooler with RO System, Development of Tube well and Ext. of LT line and Lighting System etc. at NMY Sitapur Road, Lucknow.12-Dec-2019 02:00 PM1081.07
337SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_412831_1E/M/325/2019-20-1475Internal Electrification in Toilet Block works etc. at NMY Barabanki.12-Dec-2019 02:30 PM250.00
338SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_412945_1E/M/325/2019-20-1475Internal Electrification in Different type Buildings, Shops and APF and Cabling works etc at N.M.Y. Bhinga Distt.Bahrich12-Dec-2019 05:00 PM503.55
339SE Zone-1||Dy Director Construction(E-M), Lucknow2019_RKUMP_412959_1E/M/325/2019-20-1475Construction of H.T./L.T line,Double Pole Structure, S/F of 250 KVA Transformer 2No.,LED street light on pole, S/F of 40/25 KVA DG Set and cabling works etc at N.M.Y. Bhinga Distt.Bahrich .12-Dec-2019 05:00 PM1513.76
340SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_428927_1E/M/325/2020-1536Repair work of Rewiring Internal Electrification in A types shop 10 Nos. B type shop 10 Nos. C types shop 10 Nos. Staff Quarter 1 4 Nos., police chowki, Check Post 02 Nos. at N.M.Y. Kaimganj, District Farrukhabad.28-Jan-2020 06:00 PM250.00
341SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429254_1E/M/325/2020-1536Internal Wiring in Old A, B,C Type Shops, APF 12X88 and New C Type Shops, Tiolet Block , S/F of Water Cooler with RO System , Development of Tube well and Ext. of LT line and Lighting System etc. At NMY Sitapur Road. Lucknow.30-Jan-2020 10:00 AM1081.07
342SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429362_1E/M/325/2020-1536S/F of Modular Switch / Switch Boards, LED Lights / Fans, Gyser and its related Works etc. in Community center, Club, and Guest house at Mandi Parishad, Awasiya Colony, Vibhuti Khand, Gomti Nagar, Lucknow.30-Jan-2020 10:00 AM250.00
343SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429368_1E/M/325/2020-1536Internal Electrification in Residence 07 No Type 1 , 7 No Type 2, 1 No Type 3, Bank, Office building check post and cable connection etc. work at NMY GOLA .30-Jan-2020 10:00 AM250.00
344SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429372_1E/M/325/2020-1536S/F of 01 No.Cantilever Type Retro Reflective Sign Board at NMY Gola.30-Jan-2020 10:00 AM250.00
345SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429373_1E/M/325/2020-1536Internal/ External Electrification in office Building , A.P.F. C type shop 06 No. Godown , Guard Room at NMY Tambaur Distt. Sitapur30-Jan-2020 10:00 AM250.00
346SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429379_1E/M/325/2020-1536S/F of Water Cooler with RO System and its related Works At Kisan Mandi Bhawan, Gomti Nagar, Lko.30-Jan-2020 10:00 AM250.00
347SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429385_1E/M/325/2020-1536Repairing of L.T Line, Painting of Pole, S/F LED Street Light Fittings, S/I/T/C of 2 No. High Mast OR S/F of 150 Ltr. Capacity Water Cooler with RO System and its related Works at NMY Tikonia District Kheeri30-Jan-2020 10:00 AM250.00
348SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429387_1E/M/325/2020-1536S/E of 01 No Over Head Retro Reflective Sign Board and Cantilever Type Retro Reflective Sign Board 02 Nos. at NMY. Tikonia30-Jan-2020 10:00 AM250.00
349SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429448_1E/M/325/2020-1536Internal and External Electrification in Boys Hostel CSAU Kanpur.30-Jan-2020 12:30 PM304.95
350SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429482_1E/M/325/2020-1536S/F For Manual Alarm System at Boys Hostel C.S.A.U. Kanpur.30-Jan-2020 01:30 PM250.00
351SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429489_1E/M/325/2020-1536CONSTRUCTION OF TUBE WELL SIZE 200mm x 200mm and S/F of 7.5 H.P Submersible Pump AT N.M.Y. C.S.A.U. Kanpur.30-Jan-2020 01:30 PM250.00
352SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429505_1E/M/325/2020-1536Internal Electrification in Krishi Vipdan Office at NMY Kanpur.30-Jan-2020 01:40 PM250.00
353SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429520_1E/M/325/2020-1536S/E/T/C of High Mast 01 No. And S/F of LED Street Light on pole and painting of pole at SMY Akbarpur, Kanpur Dehat.30-Jan-2020 02:15 PM250.00
354SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429572_1E/M/325/2020-1536S/F of LED Street Flood Light, Main/ Sub Control Panel in KMB and Watch Tower and Electrification in Toilet Block and Cabling works and its related works at Kisan Mandi Bhawan Gomti Nagar Lko.30-Jan-2020 03:40 PM515.80
355SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_429585_1E/M/325/2020-1536S/F of LED flood Light on old H.M.Lighting system and on Pole and cabling works etc. at N.M.Y. Kisan Bazar, Vibhuti Khand, Gomti Nagar, Lucknow.30-Jan-2020 04:15 PM507.91
356SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_435552_1E/M/325/2020-1834S/F of LED Street Flood Light, Main/Sub Control Panel in KMB and Cabling works and its related works at Kisan Mandi Bhawan Gomti Nagar, Lko.15-Feb-2020 02:00 PM496.72
357SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_435565_1E/M/325/2020-1834S/F of LED Street Flood Light in Watch Tower and Electrification in Toilet Block and Cabling works and its related works at Kisan Mandi Bhawan Gomti Nagar, Lko.15-Feb-2020 02:30 PM250.00
358SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_435608_1E/M/325/2020-1834S/F of LED flood Light on old H.M.Lighting system and on Pole and cabling works etc. at N.M.Y. Kisan Bazar, Vibhuti Khand, Gomti Nagar, Lucknow.15-Feb-2020 03:15 PM455.99
359SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_435696_1E/M/325/2020-1834Internal Electrifiication in 01 No. Toilet Block at NMY KamalGanj Distt. Farrukhabad.15-Feb-2020 04:45 PM250.00
360SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_435705_1E/M/325/2020-1834Internal Electrification in 02 Nos.Toilet Block at NMY Etawah Distt. Etawah.15-Feb-2020 05:00 PM250.00
361SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_435714_1E/M/325/2020-1834Internal Electrification in 1 No.Toilet Block works etc. at NMY Bharthana Distt. Etawah.15-Feb-2020 05:15 PM250.00
362SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_436114_1E/M/325/2020-1830Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Sitapur Road, Lucknow17-Feb-2020 04:00 PM264.02
363SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_436188_1E/M/325/2020-1830Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Kaimganj, Farrukhabad.17-Feb-2020 05:30 PM264.02
364SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_436209_1E/M/325/2020-1830Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Palia, Kheeri.17-Feb-2020 05:50 PM264.02
365SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_436231_1E/M/325/2020-1830Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Bahraich.17-Feb-2020 06:15 PM264.02
366SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_437646_1E/M/325/2020-1811Extension/Re. of LT Line, S/F of Street LED Light and LED Light on 16 Metre High Mast Light 04 Nos, S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos. 4KVA Steblizer, GI Pipe line and cabling work at NMY Nanpara Distt. Behraich.20-Feb-2020 06:20 PM405.26
367SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_438327_1E/M/325/2020-1811S/E of 01 No Over Head Retro Reflective Sign Board and 02 No Cantilever Type Retro Reflective Sign Board at NMY. Nanpara Distt. Bahraich.22-Feb-2020 02:45 PM250.00
368SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_438341_1E/M/325/2020-1811S/E of 01 No Over Head Retro Reflective Sign Board and 02 No Cantilever Type Retro Reflective Sign Board at NMY. Bhinga Distt. Bahraich.22-Feb-2020 03:30 PM250.00
369SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_438386_1E/M/325/2020-1811Fire Detection and alarm system for admin Block at NMY Bhinga Distt. Bahraich.22-Feb-2020 03:50 PM250.00
370SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_438403_1E/M/325/2020-1811S/E of 01 No Over Head Retro Reflective Sign Board and 02 No Cantilever Type Retro Reflective Sign Board at NMY. Mihirpurwa Distt. Bahraich.22-Feb-2020 05:00 PM250.00
371SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_438452_1E/M/325/2020-1811S/E of 01 No Over Head Retro Reflective Sign Board and 01 No Cantilever Type Retro Reflective Sign Board at NMY. Kernailganj Distt. Gonda.22-Feb-2020 05:25 PM250.00
372SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_438498_1E/M/325/2020-1811Repairing of L.T Line, Painting of Pole, S/F LED Street Light Fittings, S/I/T/C of 2 No. High Mast at NMY, Pailya District Kheeri22-Feb-2020 06:00 PM250.24
373SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_438513_1E/M/325/2020-1811Repairing of L.T Line, Painting of Pole, S/F LED Street Light Fittings, S/I/T/C of 2 No. High Mast OR S/F of 150 Ltr. Capacity Water Cooler with RO System and its related Works at NMY, Tikonia District Kheeri22-Feb-2020 06:15 PM250.00
374SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_438538_1E/M/325/2020-1811CONSTRUCTION OF TUBE WELL SIZE 300mm x 200mm and S/F of 15 H.P Submersible Pump AT N.M.Y. Bhinga, Bahraich.22-Feb-2020 06:35 PM250.00
375SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_439087_1E/M/325/2020-1811CONSTRUCTION OF TUBE WELL SIZE 300mm x 200mm and S/F of 15 H.P Submersible Pump AT N.M.Y. Bhinga, Bahraich.24-Feb-2020 06:10 PM250.00
376SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440146_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY. Etawah.27-Feb-2020 10:00 AM417.60
377SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440149_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Kaimganj.27-Feb-2020 10:00 AM417.60
378SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440151_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Farukhabad.27-Feb-2020 10:00 AM417.60
379SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440156_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bharthana.27-Feb-2020 10:00 AM417.60
380SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440157_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur Road, Lucknow27-Feb-2020 10:00 AM417.60
381SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440160_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Lakhimpur.27-Feb-2020 10:00 AM417.60
382SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440161_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Gonda.27-Feb-2020 10:00 AM417.60
383SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440165_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Barabanki.27-Feb-2020 10:00 AM417.60
384SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440167_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur.27-Feb-2020 10:00 AM417.60
385SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440169_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Hardoi27-Feb-2020 10:00 AM417.60
386SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440172_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Naubasta27-Feb-2020 10:00 AM417.60
387SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_440058_1E/M/325/2020-1868Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY. Bangermau, Unnao.27-Feb-2020 10:30 AM417.60
388SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_441042_1E/M/325/2020-1860Internal and External Electrification in Boys Hostel CSAU Kanpur.28-Feb-2020 03:00 PM304.95
389SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_441071_1E/M/325/2020-1860S/F of 150 Ltr. Capacity 03 Nos. Water Cooler. 4 KVA Stebilizers, Construction of water cooler case and other related work. at N.M.Y. Uttaripura, District Kanpur Nagar.28-Feb-2020 03:15 PM250.00
390SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_441103_1E/M/325/2020-1860S/F For Manual Alarm System at Boys Hostel C.S.A.U. Kanpur.28-Feb-2020 03:30 PM250.00
391SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_441138_1E/M/325/2020-1860Internal Electrification Work in E-NAM building, FRH, Canteen, Building at Modernise NMY, Pailya District Kheeri28-Feb-2020 04:30 PM512.37
392SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_442660_1E/M/325/2020-1860Internal Electrification Work in E-NAM building, , Canteen, Drinking water facility, Building and Gate complex at Modernised NMY. Bahraich03-Mar-2020 03:15 PM284.60
393SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_444037_1E/M/325/2020-1976S/F of Water Cooler with RO System and its related Works At Kisan Mandi Bhawan, Gomti Nagar, Lko.05-Mar-2020 06:15 PM250.00
394SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_444061_1E/M/325/2020-1976S/F of Modular Switch / Switch Boards, LED Lights / Fans, Gyser and its related Works etc. in Community center, Club, Geust house and Community centre at Mandi Parishad, Awasiya Colony, Vibhuti Khand, Gomti Nagar, Lucknow.05-Mar-2020 06:30 PM250.00
395SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_444081_1E/M/325/2020-1976S/E/T/C of High Mast 01 No. And S/F of LED Street Light on pole and painting of pole at SMY Akbarpur, Kanpur Dehat.05-Mar-2020 06:45 PM250.00
396SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_453046_1E/M/325/2020-2034Electrical Non Schedule item for Cold Room and Ripening Room and its Related Works.20-Mar-2020 03:15 PM250.00
397SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_453944_1E/M/325/2020-2063S/E of Over Head / Cantilever Type Retro Reflective Sign Board.21-Mar-2020 02:15 PM250.00
398SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_453974_1E/M/325/2020-2061S/F of Water Cooler with RO System and its related Works.21-Mar-2020 02:30 PM250.00
399SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_466933_1E/M/325/2020-41Repairing of Griding Line, Hot water Plant, S/I/T/C of Cleaning Machine and Puff Panneling For cold Room/ Pre cooler room etc. At Mango Pack House, Rahman Khera, Hardoi Road Lko.06-May-2020 06:15 PM736.24
400SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_474716_1E/M/325/2020-74Replacement of brushing of shorting convare line, 01 no. pre cooler, converted in to chamber and commisionig of puff panneling in vegetable area and s/f of cleaning machine and upgardation of Hot water treatment etc. at Mango Pack House Malihabad Lko23-May-2020 02:30 PM736.25
401SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476011_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bangrmau,Unnao.27-May-2020 02:30 PM353.90
402SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476032_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Etawah.27-May-2020 02:55 PM353.90
403SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476052_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Kaimganj.27-May-2020 03:15 PM353.90
404SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476063_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Farukhabad.27-May-2020 03:30 PM353.90
405SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476077_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bharthana.27-May-2020 03:40 PM353.90
406SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476085_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur Road, Lko.27-May-2020 03:45 PM353.90
407SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476094_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Lakhimpur.27-May-2020 04:00 PM353.90
408SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476109_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Gonda.27-May-2020 04:15 PM353.90
409SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476121_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Barabanki.27-May-2020 04:30 PM353.90
410SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476134_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur.27-May-2020 05:00 PM353.90
411SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476148_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Hardoi.27-May-2020 05:00 PM353.90
412SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476421_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Naubasta.28-May-2020 01:30 PM353.90
413SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476471_1E/M/325/2020-108Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Sitapur Road Lko.28-May-2020 02:50 PM250.00
414SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476484_1E/M/325/2020-108Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Kaimganj, Farukhabad.28-May-2020 03:20 PM250.00
415SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476497_1E/M/325/2020-108Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY palia, Khiri.28-May-2020 03:20 PM250.00
416SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476512_1E/M/325/2020-108Supply /Installation /Testing/Commissoning of Full Colour Ticker Board Display and Addressing system at NMY Bahraich28-May-2020 03:30 PM250.00
417SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476633_1E/M/325/2020-104S/E/T/C of High Mast 01 No. and S/F of LED Street Light on pole and painting of pole at SMY Akbarpur, Kanpur Dehat.28-May-2020 05:10 PM250.00
418SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476650_1E/M/325/2020-104Internal and External Electrification in Boys Hostel CSAU Kanpur28-May-2020 05:30 PM304.95
419SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476663_1E/M/325/2020-104Extension/repairing of LT Line, S/F of LED light on High Mast/ Pole, Inter. Electri. in diff. type Build., APF, Gate light and S/F of 02 Nos. water cooler and its related works. at NMY Nanpara Distt. Bahraich.28-May-2020 05:30 PM405.26
420SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_476678_1E/M/325/2020-104CONSTRUCTION OF TUBE WELL SIZE 300mm x 200mm and S/F of 15 H.P Submersible Pump AT N.M.Y. Bhinga, Bahraich.28-May-2020 05:30 PM250.00
421SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489352_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Etawah.02-Jul-2020 03:15 PM353.90
422SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489365_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Kaimganj.02-Jul-2020 03:15 PM353.90
423SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489339_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bangermau.02-Jul-2020 03:20 PM353.90
424SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489373_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Farukhabad.02-Jul-2020 03:30 PM353.90
425SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489382_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bharthna.02-Jul-2020 03:40 PM353.90
426SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489391_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur.02-Jul-2020 03:50 PM353.90
427SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489398_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur Road.02-Jul-2020 04:10 PM353.90
428SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489416_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Lakhimpur.02-Jul-2020 04:15 PM353.90
429SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489428_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Gonda.02-Jul-2020 04:30 PM353.90
430SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489435_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Barabanki.02-Jul-2020 04:45 PM353.90
431SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489441_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY hardoi.02-Jul-2020 04:50 PM353.90
432SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_489445_1E/M/325/2020-112Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Naubasta.02-Jul-2020 05:10 PM353.90
433SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501447_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Mithauli, Under Krishi Utpadan Mandi Samiti Maigalganj.22-Aug-2020 05:00 PM250.00
434SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501471_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Kalwamoti, Under Krishi Utpadan Mandi Samiti Maigalganj.22-Aug-2020 05:20 PM250.00
435SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501470_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Kakraha, Under Krishi Utpadan Mandi Samiti Maigalganj.22-Aug-2020 06:05 PM250.00
436SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501472_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Mithauli, Under Krishi Utpadan Mandi Samiti Maigalganj.24-Aug-2020 10:00 AM250.00
437SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501470_2E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Madaripurwa, Under Krishi Utpadan Mandi Samiti Maigalganj.24-Aug-2020 10:00 AM250.00
438SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501469_1E/M/325/2020 -410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Kakraha, Under Krishi Utpadan Mandi Samiti Maigalganj24-Aug-2020 10:00 AM250.00
439SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501464_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Birampur, Under Krishi Utpadan Mandi Samiti Maigalganj.24-Aug-2020 10:00 AM250.00
440SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501451_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Phoolbehar Under Krishi Utpadan Mandi Samiti Kheeri.24-Aug-2020 10:00 AM250.00
441SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501450_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Malpur Under Krishi Utpadan Mandi Samiti Kheeri.24-Aug-2020 10:00 AM250.00
442SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501449_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Nardaval Under Krishi Utpadan Mandi Samiti Kheeri.24-Aug-2020 10:00 AM250.00
443SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501457_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Balpur Pakaria Under Krishi Utpadan Mandi Samiti Biswa24-Aug-2020 10:00 AM250.00
444SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501458_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Sherpur Laval Under Krishi Utpadan Mandi Samiti Biswa24-Aug-2020 10:00 AM250.00
445SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501453_1E/M/325/2020-410Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Judaura Under Krishi Utpadan Mandi Samiti Hardoi.24-Aug-2020 10:00 AM250.00
446SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501446_1E/M/325/2020-410Internal electrification in01 no. Toilet Block at NMY. Mohammadi Distt. Lakhimpur.24-Aug-2020 10:00 AM250.00
447SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501447_2E/M/325/2020-410Internal electrification in01 no. Toilet Block at NMY. Maigalganj.24-Aug-2020 10:00 AM250.00
448SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_506212_1E/M/325/2020-403S/I/T/C of New Gearless Lift Capacity 16 Passenger, cable and its Related Works at Kisan Bazar,Gomti Nagar, Lko.29-Aug-2020 10:00 AM250.00
449SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501463_1E/M/325/2020Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 3.00 KW off grid solar plant in Hatpath Sonwa Under Krishi Utpadan Mandi Samiti Lucknow.31-Aug-2020 06:00 PM250.00
450SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501463_2E/M/325/2020Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Sonwa, Under Krishi UtpadanMandi Samiti Lucknow31-Aug-2020 06:00 PM250.00
451SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501460_1E/M/325/2020-410Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Salempur, Under Krishi Utpadan Mandi Samiti Lucknow01-Sep-2020 09:00 AM250.00
452SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501462_1E/M/325/2020-410Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Latifpur, Under Krishi Utpadan Mandi Samiti Lucknow.01-Sep-2020 10:00 AM250.00
453SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501459_1E/M/325/2020-410Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Niwan Under Krishi Utpadan Mandi Samiti Banthra.01-Sep-2020 10:00 AM250.00
454SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_501455_1E/M/325/2020-410Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Maharajnagar Under Krishi Utpadan Mandi Samiti Biswa.01-Sep-2020 10:00 AM250.00
455SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_507592_1E/M/325/2020 -457S/E/T/C of High Mast 01 No. And S/F of LED Street Light on pole and painting of pole at SMY Akbarpur, Kanpur Dehat.08-Sep-2020 04:00 PM250.00
456SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_507591_1E/M/325/2020-457Extension/Re. of LT Line, S/F LED Light on 16 Metre H. M. Light 04 Nos, S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos. 4KVA Steblizer, GI Pipe line and cabling work at NMY Nanpara Distt. Bahraich.08-Sep-2020 04:50 PM405.26
457SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_507589_1E/M/325/2020-457Internal and External Electrification in Boys Hostel CSAU Kanpur08-Sep-2020 05:00 PM304.95
458SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_507587_1E/M/325/2020-457S/E/T/C of 06 No. High Mast Lighting with 8 Nos. LED Flood Light at NMY Naubasta, Distt. Kanpur.08-Sep-2020 05:15 PM375.40
459SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_507078_1E/M/325/2020-457Supply and Laying of Cable and its Related works at Mandi Parishad Awasiya Colony Gomti Nagar, Lko08-Sep-2020 05:40 PM250.00
460SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_507076_1E/M/325/2020-457Internal Electrifiication in 2 No. Modern Toilet Block at NMY Aloo Mandi Satanpur Distt. Farukhabad.08-Sep-2020 05:40 PM250.00
461SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_507074_1E/M/325/2020-457Internal Electrification in B type Shop 8 Nos. and Extension of LT Line at N.M.Y. Naubasta Distt. Kanpur.09-Sep-2020 10:00 AM250.00
462SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_526530_1E/M/325/2020-578S/I/T/C of New Gearless Lift Capacity 16 Passenger, cable and its Related Works at Kisan Bazar, Gomti Nagar, Lko.02-Nov-2020 10:00 AM250.00
463SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527137_1E/M/325/2020Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bangermau.16-Nov-2020 10:00 AM353.90
464SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527134_1E/M/325/2020-639Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Etawah.16-Nov-2020 10:00 AM353.90
465SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527133_1E/M/325/2020-639Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Kaimganj.16-Nov-2020 10:00 AM353.90
466SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527131_1E/M/325/2020-639Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Farukhabad.16-Nov-2020 10:00 AM353.90
467SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527130_1E/M/325/2020-639Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Bharthna.16-Nov-2020 10:00 AM353.90
468SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527128_1E/M/325/2020-639Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur Road, Lko.16-Nov-2020 10:00 AM353.90
469SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527126_1E/M/325/2020-639Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Lakhimpur.16-Nov-2020 10:00 AM353.90
470SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527124_1E/M/325/2020-639Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Barabanki.16-Nov-2020 10:00 AM353.90
471SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527122_1E/M/325/2020-639Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Sitapur.16-Nov-2020 10:00 AM353.90
472SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527163_1E/M/325/2020-639Annual Comprehensive Maintenance and Operation work of existing 2 Nos. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Hardoi.16-Nov-2020 10:00 AM353.90
473SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527162_1E/M/325/2020-634CONSTRUCTION OF TUBE WELL SIZE 300mm x 200mm and S/F of 15 H.P Submersible Pump AT N.M.Y. Bhinga, Bahraich.17-Nov-2020 12:35 PM250.00
474SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527125_1E/M/325/2020-639Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized waigh Bridge for three years at NMY Gonda.17-Nov-2020 12:50 PM250.00
475SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527152_1E/M/325/2020-642Supply and Laying of Cable and its Related works at Mandi Parishad Awasiya Colony Gomti Nagar, Lko23-Nov-2020 04:00 PM250.00
476SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527151_1E/M/325/2020-642Internal Electrifiication in 2 No. Modern Toilet Block at NMY Aloo Mandi Satanpur Distt. Farukhabad.23-Nov-2020 04:00 PM250.00
477SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527158_1E/M/325/2020-642Internal electrification in01 no. Toilet Block at NMY. Mohammadi Distt. Lakhimpur.23-Nov-2020 04:00 PM250.00
478SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527149_1E/M/325/2020-642Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Mithauli IInd, Kaluamoti, Madaripurwa, Kakraha, Virampur Under Krishi Utpadan Mandi Samiti Maigalganj23-Nov-2020 04:00 PM250.00
479SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527148_1E/M/325/2020-642Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Phoolbehar, Malpur, Nardaul Under Krishi Utpadan Mandi Samiti Kheeri.23-Nov-2020 04:15 PM250.00
480SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527145_1E/M/325/2020-642Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Balpur Pakaria, Maharajnagar Under Krishi Utpadan Mandi Samiti Biswa. Sitapur23-Nov-2020 04:20 PM250.00
481SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527144_1E/M/325/2020-642Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Sonwa, Salempur, Latifpur Under Krishi Utpadan Mandi Samiti Lucknow.23-Nov-2020 04:25 PM250.00
482SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527154_1E/M/325/2020-642S/E/T/C of 06 No. High Mast Lighting with 8 Nos. LED Flood Light at NMY Naubasta, Distt. Kanpur.23-Nov-2020 04:40 PM375.40
483SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527140_1E/M/325/2020-642Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Niwan Sherpur, Lawal Under Krishi Utpadan Mandi Samiti Banthara.23-Nov-2020 05:00 PM250.00
484SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527139_1E/M/325/2020-642Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Judaura Under Krishi Utpadan Mandi Samiti Hardoi.23-Nov-2020 05:15 PM250.00
485SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527138_1E/M/325/2020-642Internal electrification in 01 no. Toilet Block at NMY. Maigalganj23-Nov-2020 06:00 PM250.00
486SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_527161_1E/M/325/2020-676S/I/T/C of Fire Fighting System and Operation of Fire Fighting System in NMY Sitapur Road Lko.03-Dec-2020 12:15 PM1748.70
487SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_536030_1E/M/325/2020-711S/F of. 45 to 200 watt LED Flood/ Street Light Drivers etc.07-Dec-2020 12:30 PM250.00
488SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_539301_1E/M/325/2020-751Supply and Laying of Cable and its Related works at Mandi Parishad Awasiya Colony Gomti Nagar, Lko24-Dec-2020 04:00 PM250.00
489SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_539304_1E/M/325/2020-751Internal electrification in01 no. Toilet Block at NMY. Mohammadi Distt. Lakhimpur.24-Dec-2020 04:00 PM250.00
490SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_539307_1E/M/325/2020-751Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Mithauli IInd, Kaluamoti, Madaripurwa, Kakraha, Virampur Under Krishi Utpadan Mandi Samiti Maigalganj24-Dec-2020 04:15 PM250.00
491SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_539308_1E/M/325/2020-751Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Phoolbehar, Malpur, Nardaul Under Krishi Utpadan Mandi Samiti Kheeri.24-Dec-2020 04:30 PM250.00
492SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_539311_1E/M/325/2020-751Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Balpur Pakaria, Maharajnagar Under Krishi Utpadan Mandi Samiti Biswa. Sitapur24-Dec-2020 04:45 PM250.00
493SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_539313_1E/M/325/2020-751Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Sonwa, Salempur, Latifpur Under Krishi Utpadan Mandi Samiti Lucknow.24-Dec-2020 05:00 PM250.00
494SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_539315_1E/M/325/2020-751Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Niwan Sherpur, Lawal Under Krishi Utpadan Mandi Samiti Banthara.24-Dec-2020 05:15 PM250.00
495SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_539318_1E/M/325/2020-751Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Judaura Under Krishi Utpadan Mandi Samiti Hardoi.24-Dec-2020 05:30 PM250.00
496SE Zone-1||Dy Director Construction(E-M), Lucknow2020_RKUMP_539319_1E/M/325/2020-751Internal electrification in 01 no. Toilet Block at NMY. Maigalganj24-Dec-2020 05:45 PM250.00
497SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_542740_1E/M/325/2020-833Annual Comprehensive Maintenance of 01 No. VIP and 03 Nos. Passenger Lift installed at Kisan Mandi Bhawan Gomti Nagar Lko.02-Jan-2021 03:00 PM250.00
498SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_542738_1E/M/325/2020-833Annual Operation work of Fire Fighting, FireAlarm System installed at Kisan Mandi Bhawan Gomti Nagar Lko.02-Jan-2021 05:00 PM250.00
499SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_542736_1E/M/325/2020-833Annual Comprehensive Maintenance and Operation of 680 Ton AC Plant System installed at Kisan Mandi Bhawan Gomti Nagar Lko.02-Jan-2021 05:10 PM325.70
500SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543146_1E/M/325/2020-840Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gonda.04-Jan-2021 12:55 PM250.00
501SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543584_1E/M/325/2020-852Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Manjhoria Under Krishi Utpadan Mandi Samiti Lucknow.06-Jan-2021 10:00 AM250.00
502SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543585_1E/M/325/2020-852Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kuchlai Under Krishi Utpadan Mandi Samiti Mishrikh06-Jan-2021 12:45 PM250.00
503SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543584_2E/M/325/2020-852Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Majhoria Under Krishi Utpadan Mandi Samiti Lucknow.06-Jan-2021 12:45 PM250.00
504SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543587_1E/M/325/2020-852Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Khanjan Nagar Under Krishi Utpadan Mandi Samiti Maigalganj06-Jan-2021 01:15 PM250.00
505SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543589_1E/M/325/2020-852Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Asoha, Kurmi Gadhewa Under Krishi Utpadan Mandi Samiti Purwa, Unnao.06-Jan-2021 01:30 PM250.00
506SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543583_1E/M/325/2020-852Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Sherpur, Katka and Katiyara Under Krishi Utpadan Mandi Samiti Hargaon.06-Jan-2021 04:30 PM250.00
507SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543577_1E/M/325/2020-852Supply and Fixing of LED Street Lighting Panel etc work at N.M.Y Lakhimpur.13-Jan-2021 12:10 PM250.00
508SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543578_1E/M/325/2020-852Internal Wiring in APF 12 X 88 Mtr. 01 No. At NMY Maigalganj.13-Jan-2021 12:40 PM250.00
509SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543582_1E/M/325/2020-852Internal Electrification in Residential Quarters At NMY Leherpur, Hargaon.13-Jan-2021 01:00 PM250.00
510SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_545525_1E/M/325/2021-881Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kharauli Under Krishi Utpadan Mandi Samiti Unnao13-Jan-2021 02:15 PM250.00
511SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_545522_1E/M/325/2021-881Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Alipur Nichlaula Under Krishi Utpadan Mandi Samiti Bangermau13-Jan-2021 03:15 PM250.00
512SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543592_1E/M/325/2021-890Internal Electrifiication in 2 No. Modern Toilet Block at NMY Aloo Mandi Satanpur Distt. Farukhabad.14-Jan-2021 05:55 PM250.00
513SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_543593_1E/M/325/2021-900Repair/Replacement of defective spare parts fitted in Online hot water immersion treatment unit of Mango processing conveyor line and Replacement of defective spares parts fitted in Offline Hot water immersion treatment unit Capacity 500 Kg. / Batch15-Jan-2021 03:50 PM250.00
514SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_546344_1E/M/325/2021-909Electrification in samiti Office and Toilet Block at Kisan Bazar, Gomti Nagar, Lko.16-Jan-2021 05:15 PM250.00
515SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_550964_1E/M/325/2021-971Annual Operation work of Fire Fighting, FireAlarm System installed at Kisan Mandi Bhawan Gomti Nagar Lko.03-Feb-2021 02:10 PM250.00
516SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_550978_1E/M/325/2021-971Annual Comprehensive Maintenance of 01 No. VIP and 03 Nos. Passenger Lift installed at Kisan Mandi Bhawan Gomti Nagar Lko.03-Feb-2021 02:15 PM250.00
517SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_550988_1E/M/325/2021-971Annual Comprehensive Maintenance and Operation of 680 Ton AC Plant System installed at Kisan Mandi Bhawan Gomti Nagar Lko.03-Feb-2021 02:35 PM325.70
518SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_551275_1E/M/325/2021-1014Internal Wiring in APF 12 X 88 Mtr. 01 No. At NMY Maigalganj.04-Feb-2021 05:35 PM250.00
519SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_551277_1E/M/325/2021-1014Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kuchlai Under Krishi Utpadan Mandi Samiti Mishrikh.04-Feb-2021 06:00 PM250.00
520SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_551273_1E/M/325/2021-1014Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Khanjan Nagar Under Krishi Utpadan Mandi Samiti Maigalganj04-Feb-2021 06:15 PM250.00
521SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_551272_1E/M/325/2021-1018S/I of Dewatering Submersible Mud Pump and Its. Related works at Kisan Bazar, Gomti Nagar, Lko.05-Feb-2021 12:00 PM250.00
522SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560439_1E/M/325/2021-1125Internal Wiring in APF 12 X 88 Mtr. 01 No. At NMY Maigalganj.02-Mar-2021 11:30 AM250.00
523SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560441_1E/M/325/2021-1125Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kuchlai Under Krishi Utpadan Mandi Samiti Mishrikh.02-Mar-2021 11:30 AM250.00
524SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560440_1E/M/325/2021-1125Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Khanjan Nagar Under Krishi Utpadan Mandi Samiti Maigalganj02-Mar-2021 11:30 AM250.00
525SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560443_1E/M/325/2021-1125Annual Operation work of Fire Fighting, FireAlarm System installed at Kisan Mandi Bhawan Gomti Nagar Lko02-Mar-2021 11:30 AM250.00
526SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560442_1E/M/325/2021-1125Annual Comprehensive Maintenance of 01 No. VIP and 03 Nos. Passenger Lift installed at Kisan Mandi Bhawan Gomti Nagar Lko.02-Mar-2021 11:30 AM250.00
527SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560444_1E/M/325/2021-1125Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kharauli Under Krishi Utpadan Mandi Samiti Unnao02-Mar-2021 11:30 AM250.00
528SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560445_1E/M/325/2021-1125Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Alipur Nichlaula Under Krishi Utpadan Mandi Samiti Bangermau02-Mar-2021 11:30 AM250.00
529SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560822_1E/M/325/2021-1129Repairing Work of L.T. Line, LED Light on Poles / Pole mast , Pole Painting, Main switch, Cabling work and Rewiring of APF12X28 Mtr. 02 Nos., Farmer Rest House, Office at NMY Etawah.02-Mar-2021 05:00 PM309.44
530SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560817_1E/M/325/2021-1129Re-wiring in different types Building, and Repair work of L.T. Line, LED Light, S/F of LED flood ,15 H.P Submersible and Cabling, work etc. at N.M.Y. Mohammadabad, Distt. Farrukhabad.02-Mar-2021 05:30 PM306.37
531SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560798_1E/M/325/2021-1129LED Light on Poles/Pole mast, Pole Painting, Main switch, L.T. Line repair, Cabling work and Rewiring of Mandi Samiti Offic At NMY Pukhrayan.02-Mar-2021 05:50 PM250.00
532SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560794_1E/M/325/2021-1129S/F of LED Flood on High Mast at NMY Barabanki.02-Mar-2021 06:10 PM250.00
533SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560791_1E/M/325/2021-1129S/F of LED Flood on High Mast at NMY F/V Gonda02-Mar-2021 06:30 PM250.00
534SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_560786_1E/M/325/2021-1129S/F of LED Flood on High Mast at NMY Nawabganj, Gonda.03-Mar-2021 11:10 AM250.00
535SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_566839_1E/M/325/2021-1186S/I/T/C of 01TPH Grain Grading Plant of capacity1,2,5,AND20TPH and 2TPH Mobaile G. Gra.Plant, S/I/T/C of PotatoSorting. Grading Line /Onion gra.plant of capa. 1, 2, 4- 5TPH, S/I/T/Cof 300,500and1000 kg/day of segregated organic waste composting unit09-Mar-2021 04:30 PM250.00
536SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_566056_1E/M/325/2021-1182S/I of Dewatering Mud Pump and Its. Related works at Kisan Bazar, Gomti Nagar, Lko.09-Mar-2021 05:10 PM250.00
537SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_566762_1E/M/325/2021-1186S/I/T/C of 01TPH Grain Grading Plant of capacity1,2,5,AND20TPH and 2TPH Mobaile G. Gra.Plant, S/I/T/C of PotatoSorting. Grading Line /Onion gra.plant of capa. 1, 2, 4- 5TPH, S/I/T/Cof 300,500and1000 kg/day of segregated organic waste composting unit09-Mar-2021 05:25 PM250.00
538SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_572305_1E/M/325/2021-1226S/I/T/C of New Gearless Lift Capacity 13 Passenger, cable and its Related Work at Kisan Bazar , Gomti Nagar, Lko.20-Mar-2021 02:15 PM250.00
539SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_572314_1E/M/325/2021-1226S/F of 150 Ltr. Capacity 02 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Cage and other related Work and S/F of LED Light on High Mast etc. work At NMY Sandi, Hardoi.22-Mar-2021 04:40 PM250.00
540SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_572315_1E/M/325/2021-1226Repairing of LED Street light At NMY Hardoi.22-Mar-2021 05:00 PM250.00
541SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_573752_1E/M/325/2021-1240Annual Comprehensive Maintenance of 01 No. VIP and 03 Nos. Passenger Lift installed at Kisan Mandi Bhawan Gomti Nagar Lko.23-Mar-2021 01:20 PM250.00
542SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_579860_1E/M/325/2021-16S/I/T/C of 01TPH Grain Grading Plant of capacity1,2,5,AND 20TPH and 2TPH Mobaile G. Gra.Plant, S/I/T/C of Potato Sorting. Grading Line/Oniongra. plant of capa.1,2,4-5TPH, S/I/T/C of 300,500 and 1000 kg/day of segregated organic waste composting unit05-Apr-2021 06:50 PM250.00
543SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_585311_1E/M/325/2021-97Repairing Work of L.T. Line, LED Light on Poles / Pole mast , Pole Painting, Main switch, Cabling work and Rewiring of APF12X28 Mtr. 02 Nos., Farmer Rest House, Office at NMY Etawah.07-May-2021 03:00 PM309.44
544SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_585310_1E/M/325/2021-97Rewiring in different types Building and Repair work of L.T. Line, LED Light, S/F of LED flood , 15 H.P Submersible and Cabling work etc. at N.M.Y. Mohammadabad, Distt. Farrukhabad.07-May-2021 03:00 PM306.37
545SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_585309_1E/M/325/2021-97LED Light on Poles/Pole mast, Pole Painting, Main switch, L.T. Line repair, Cabling work and Rewiring of Mandi Samiti Offic At NMY Pukhrayan.07-May-2021 03:00 PM250.00
546SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_585306_1E/M/325/2021-97S/F of LED Flood on High Mast at NMY Nawabganj, Gonda.07-May-2021 03:45 PM250.00
547SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_585308_1E/M/325/2021-97S/F of LED Flood on High Mast at NMY Barabanki.07-May-2021 04:10 PM250.00
548SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_585307_1E/M/325/2021-97S/F of LED Flood on High Mast at NMY F/V Gonda07-May-2021 04:15 PM250.00
549SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_585305_1E/M/325/2021-97S/I/T/C of New Gearless Lift Capacity 13 Passenger, cable and its Related Work at Kisan Bazar , Gomti Nagar, Lko.07-May-2021 05:15 PM250.00
550SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_585304_1E/M/325/2021-97Repair/Replacement of defective spareparts fitted in Online hot water immersion treatment unit of Mangoprocessing conveyor line, Replace of defective spares parts fitted in Offline Hot water immer. treatment unit Capa.500 Kg/Batch. at MangoPackHouse,07-May-2021 05:30 PM250.00
551SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_586698_1E/M/325/2021-120S/I/T/C of 01TPH Grain Grading Plant of capacity1,2,5,AND 20TPH and 2TPH Mobaile G. Gra.Plant, S/I/T/C of Potato Sorting. Grading Line/Oniongra. plant of capa.1,2,4-5TPH, S/I/T/C of 300,500 and 1000 kg/day of segregated organic waste composting unit.15-May-2021 01:25 PM250.00
552SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593735_1E/M/325/2021-196S/F of 150 Ltr. Capacity 02 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Cage and other related Work and S/F of LED Light on High Mast etc. work At NMY Sandi, Hardoi.10-Jun-2021 04:40 PM250.00
553SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593742_1E/M/325/2021-192S/F of LED Flood on High Mast at NMY Barabanki.11-Jun-2021 12:30 PM250.00
554SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593734_2E/M/325/2021-196S/F of 150 Ltr. Capacity 02 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Cage and other related Work and S/F of LED Light on High Mast etc. work At NMY Sandi, Hardoi.11-Jun-2021 04:00 PM250.00
555SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593735_2E/M/325/2021-196S/F of 150 Ltr. Capacity 02 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Cage and other related Work and S/F of LED Light on High Mast etc. work At NMY Sandi, Hardoi.11-Jun-2021 04:00 PM250.00
556SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593735_3E/M/325/2021-196S/F of 150 Ltr. Capacity 02 No. Water Cooler. 4 KVA Stabilizor, Construction of Water Cooler Cage and other related Work and S/F of LED Light on High Mast etc. work At NMY Sandi, Hardoi.11-Jun-2021 04:30 PM250.00
557SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593734_1E/M/325/2021-196Reapairing of LED Street light and other related work. At NMY- Hardoi11-Jun-2021 05:00 PM250.00
558SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593740_1E/M/325/2021-192S/F of LED Flood on High Mast at NMY Nawabganj, Gonda.11-Jun-2021 05:10 PM250.00
559SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593739_1E/M/325/2021-192S/I/T/C of New Gearless Lift Capacity 13 Passenger, cable and its Related Work at Kisan Bazar, Gomti Nagar, Lko12-Jun-2021 09:00 AM250.00
560SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593738_1E/M/325/2021-192Rewiring in different types Building and Repair work of L.T. Line, LED Light, S/F of LED flood , 15 H.P Submersible and Cabling work etc. at N.M.Y. Mohammadabad, Distt. Farrukhabad.12-Jun-2021 09:00 AM306.37
561SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593736_1E/M/325/2021-192Annual Comprehensive Maintenance of 01 No. VIP and 03 Nos Passenger Lift installed at Kisan Mandi Bhawan Gomti Nagar Lko12-Jun-2021 09:00 AM250.00
562SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593733_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 4 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Chakarpur, Bhauti Kanpur.17-Jun-2021 12:45 PM707.80
563SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593731_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Naubasta Kanpur.17-Jun-2021 01:30 PM353.90
564SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593729_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Auraiya.17-Jun-2021 03:00 PM353.90
565SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593728_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Bahraich.17-Jun-2021 03:30 PM353.90
566SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593712_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gola.17-Jun-2021 04:00 PM353.90
567SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593709_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Rura.17-Jun-2021 05:00 PM250.00
568SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593707_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Jhinjhak.17-Jun-2021 06:50 PM250.00
569SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593704_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Uttaripura.18-Jun-2021 09:00 AM250.00
570SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593702_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gonda.18-Jun-2021 09:00 AM250.00
571SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593701_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Nawabganj18-Jun-2021 09:00 AM250.00
572SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593700_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Maigalganj.18-Jun-2021 09:00 AM250.00
573SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593698_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Palia.18-Jun-2021 09:00 AM250.00
574SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_593695_1E/M/325/2021-222Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Haidergarh.18-Jun-2021 09:00 AM250.00
575SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_600866_1E/M/325/2021-306S/F of LED Flood on High Mast at NMY Barabanki.03-Jul-2021 04:00 PM250.00
576SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_600865_1E/M/325/2021-306S/F of LED Flood on High Mast at NMY Nawabganj, Gonda.03-Jul-2021 04:00 PM250.00
577SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602177_1E/M/325/2021-344S/F of Led Light and Electrification works etc. at IInd Floor Kisan Mandi Bhawan Gomti Nagar, Lko.08-Jul-2021 06:45 PM250.00
578SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602186_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 4 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Chakarpur, Bhauti Kanpur.09-Jul-2021 01:30 PM707.80
579SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602187_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Naubasta. Kanpur.09-Jul-2021 02:00 PM353.90
580SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602190_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Auraiya.09-Jul-2021 02:45 PM353.90
581SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602192_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Bahraich.09-Jul-2021 03:00 PM353.90
582SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602193_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gola Kheri.09-Jul-2021 03:30 PM250.00
583SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602195_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Rura, Kanpur Dehat.09-Jul-2021 03:30 PM250.00
584SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602196_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Jhinjhak, Kanpur Dehat.09-Jul-2021 04:30 PM250.00
585SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602197_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Uttaripura, Kanpur.09-Jul-2021 05:00 PM250.00
586SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602198_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gonda.09-Jul-2021 05:00 PM250.00
587SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602199_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Nawabganj, Gonda.09-Jul-2021 05:20 PM250.00
588SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602201_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Maigalganj, Kheri.09-Jul-2021 05:20 PM250.00
589SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602203_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Palia Kalan, Kheri.09-Jul-2021 05:40 PM250.00
590SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_602205_1E/M/325/2021-352Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Haidergarh.09-Jul-2021 06:00 PM250.00
591SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606417_1E/M/325/202-460Annual Comprehensive Maintenance and Operation work of existing 4 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Chakarpur, Bhauti Kanpur.05-Aug-2021 06:20 PM707.80
592SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606415_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Nabasta, Kanpur.05-Aug-2021 06:30 PM353.90
593SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606412_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Auraiya.06-Aug-2021 09:00 AM353.90
594SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606411_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Bahraich.06-Aug-2021 12:30 PM353.90
595SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606410_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gola, kheri.06-Aug-2021 01:00 PM250.00
596SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606409_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Rura.06-Aug-2021 01:20 PM250.00
597SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606407_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Jhinjhak, Kanpur Dehat.06-Aug-2021 03:00 PM250.00
598SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606406_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Uttaripura Kanpur Dehat.06-Aug-2021 03:30 PM250.00
599SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606404_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Gonda.06-Aug-2021 03:30 PM250.00
600SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606403_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Nawabganj,Gonda.06-Aug-2021 04:00 PM250.00
601SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606402_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Maigalganj, Lakhimpur Kheri.06-Aug-2021 04:15 PM250.00
602SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606400_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Palia, Lakhimpur Kheri.06-Aug-2021 04:40 PM250.00
603SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_606397_1E/M/325/2021-460Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY Haidergarh, Barabanki.06-Aug-2021 04:50 PM250.00
604SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_609446_1E/M/325/2021-475S/F of Led Light and Electrification works etc. at IInd Floor Kisan Mandi Bhawan Gomti Nagar, Lko.07-Aug-2021 05:00 PM250.00
605SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612238_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 4 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Chakarpur, Bhauti Kanpur.19-Aug-2021 02:30 PM707.80
606SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612237_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Naubasta, Kanpur.19-Aug-2021 02:30 PM353.90
607SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612236_1E/M/325/2021- 511Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Auraiya.19-Aug-2021 03:00 PM353.90
608SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612235_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 2 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Bahraich.19-Aug-2021 04:00 PM353.90
609SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612233_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gola.19-Aug-2021 04:15 PM250.00
610SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612232_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Rura.19-Aug-2021 04:30 PM250.00
611SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612231_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Jhinjhak.19-Aug-2021 05:00 PM250.00
612SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612230_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Uttaripura.19-Aug-2021 05:00 PM250.00
613SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612229_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Gonda.19-Aug-2021 05:00 PM250.00
614SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612228_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Nawabganj.19-Aug-2021 05:10 PM250.00
615SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612227_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Maigalganj.19-Aug-2021 05:30 PM250.00
616SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612226_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Palia.19-Aug-2021 05:45 PM250.00
617SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_612225_1E/M/325/2021-511Annual Comprehensive Maintenance and Operation work of existing 1 No. 50 MT. Electronic Computerized weigh bridge for Three Years at NMY. Haidergarh.19-Aug-2021 05:50 PM250.00
618SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_613685_1E/M/325/2021-520S/F of Led Light and Electrification works etc. at IInd Floor Kisan Mandi Bhawan Gomti Nagar, Lko25-Aug-2021 05:00 PM250.00
619SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_621807_1E/M/325/2021-633Comprehensive Maintenance of 03 Nos. Passenger Lift at Kisan Mandi Bhawan, Gomti Nagar Lko.21-Sep-2021 04:30 PM250.00
620SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_621808_1E/M/325/2021-633Extension of LT Line, S/F of Street LED Light and Its Related work and Internal Electrification in C type shop 5 No. and 12 X 40 Mtr. APF. 01 No. At NMY Biswa, Sitapur.21-Sep-2021 06:30 PM250.00
621SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_634284_1E/M/325/2021-745Comprehensive Maintenance of 03 Nos. Passenger Lift at Kisan Mandi Bhawan, Gomti Nagar Lko.27-Oct-2021 10:00 AM250.00
622SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_634283_1E/M/325/2021-745Extension of LT Line, S/F of Street LED Light and Its Related work and Internal Electrification in C type shop 5 No. and 12 X 40 Mtr. APF. 01 No. At NMY Biswa, Sitapur.27-Oct-2021 10:00 AM250.00
623SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_646394_1E/M/325/2021-824Servicing of Lift, 380KVA DG Set, Diesel Fire Pump, S/F of Lighting Arrester, Street Light, Tube Light and Mud Pump and centrifusing of T/F oil etc. Works at 16, A.P. Sen Road, Lko.25-Nov-2021 12:45 PM250.00
624SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650245_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr Capacity 50 M.T. 2 No. At NMY Lucknow.03-Dec-2021 09:00 AM250.00
625SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650246_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr Capacity 50 M.T. 2 No. At NMY Madhoganj.03-Dec-2021 05:00 PM250.00
626SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650250_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr Capacity 50 M.T. 2 No. At NMY Kannauj.03-Dec-2021 05:00 PM250.00
627SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650254_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 2 No. At NMY Gonda.03-Dec-2021 05:00 PM250.00
628SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650257_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 2 No. At NMY Etawah.03-Dec-2021 05:10 PM250.00
629SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650259_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 2 No. At NMY Jaswant Nagar.03-Dec-2021 05:15 PM250.00
630SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650265_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 2 No. At NMY Mahammadi.03-Dec-2021 05:25 PM250.00
631SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650267_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 2 No. At NMY Bahraich.03-Dec-2021 05:45 PM250.00
632SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650268_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 1 No. At NMY Hardoi.03-Dec-2021 05:45 PM250.00
633SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650269_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 1 No. At NMY Auraiya.03-Dec-2021 06:00 PM250.00
634SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650276_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 1 No. At NMY Sitapur.03-Dec-2021 06:20 PM250.00
635SE Zone-1||Dy Director Construction(E-M), Lucknow2021_RKUMP_650273_1E/M/325/2021-851Height Increase 12 To 15 Inch Of Weigh Bridge 9X3 Mtr. Capacity 50 M.T. 1 No. At NMY Mohammadabad.03-Dec-2021 06:35 PM250.00
636SE Zone-1||Dy Director Construction(E-M), Lucknow2022_RKUMP_681603_1E/M/325/2022-1142Repairing of 02 Nos. Highmast LED Light and Street Light At NMY Saraimira, Kannauj.26-Mar-2022 06:00 PM250.00
637SE Zone-1||Dy Director Construction(E-M), Lucknow2022_RKUMP_681601_1E/M/325/2022-1142Repairing of 02 Nos. Highmast LED Light and Street Light OR S/F of Changeover Switch At NMY Farukhabad.26-Mar-2022 06:10 PM250.00
638SE Zone-1||Dy Director Construction(E-M), Lucknow2022_RKUMP_681599_1E/M/325/2022-1142Repairing of 02 Nos. Highmast / Street LED Light and S /F of LED Street Light At NMY Bahraich.26-Mar-2022 06:30 PM250.00
639SE Zone-1||Dy Director Construction(E-M), Lucknow2022_RKUMP_681598_1E/M/325/2022-1142Repairing of 06 Nos. Highmast LED Light At NMY Lakhimpur.26-Mar-2022 06:45 PM250.00
640SE Zone-1||Dy Director Construction(E-M), Lucknow2022_RKUMP_680606_1E/M/325/2022-1142S/L of 300 sqmm. 3.5 core Al. cable and S./f of 320. Change Over Switch and its related works etc at Kisan Bazar, Vibhuti khand Gomti Nagar Lucknow.28-Mar-2022 12:00 PM250.00
641SE Zone-1||Dy Director Construction(E-M), Lucknow2022_RKUMP_681597_1E/M/325/2022-1142Repairing of 02 Nos. Highmast LED Light and Street Light OR S/F of Changeover Switch At NMY Grain Gonda.28-Mar-2022 12:10 PM250.00
Total211809.54
Tender detail with UPLC Charges