SN | Orgnization | Tender Id | Tender Reference No | Tender Title | PublishedDate | Amount(UPLC Charges) | Payment | Payment Detail |
1 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_205942_1 | 51 | S/F of 48 Nos 170 to 200 Watt LED Flood Light Fittings in 2 Nos 30M Height High Mast, Replacement of Damage Unnder ground Cable, Damage Control Cable, Wire Rope, of High Mast No. 1 and S/F 20 Nos 110-130 Watt LED Street Light Fitting at NMY Beesalpur | 22-May-2018 10:00 AM | 250.00 | | |
2 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_205983_1 | 51 | L. T. Line RepairingS/F of 78 Nos 110-130 Watt LED S/F of Distributtion Panel Board, S/L of Cable for Pump HouseS/I/ of 03 Nos 150 Ltr. Capacity Water Coolarat NMY Amroha (Distt. Amroha) | 22-May-2018 10:00 AM | 356.64 | | |
3 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_206045_1 | 563 | Supply/Installation of 3 No. 16 mt. High Mast with 200 watt LED Light Fittings and Cabiling, Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board, Cabling work at NMY Moradabad District Moradabad | 24-May-2018 05:00 PM | 306.24 | | |
4 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_207430_1 | 569 | S/F of 110 to 130 watt L.E.D. Light fiting on Pole and Repairing of L.T. Line, Replacement of damage poles, Damage Cable and all ACSR, G.I. wire, at N.M.Y. Sambhal Distt. Sambhal | 24-May-2018 05:00 PM | 250.00 | | |
5 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_207451_1 | 568 | Repairing of 02 No. 30mt. Highmasts and Replacement of 400 watt Sodium Flood Lights by 200 watt L.E.D. Flood Lights, Replacement of damage cables.-S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water CoolarN. M. Y. Chandausi(Distt.Sambhal | 24-May-2018 05:00 PM | 277.44 | | |
6 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_207498_1 | 561 | Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 20 Nos Damage Steel Pole,S/F LED Street Light Fittings, Rewiring of Internal Electrification in Mandi Samiti Office and Cabling work at NMY Puranpur (Distt. Pilibhit) | 24-May-2018 05:00 PM | 268.16 | | |
7 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_207513_1 | 563 | S/F of 96 Nos 200 Watt LED Flood Light Fittings for 4 Nos 30M Height High MastReplacement of Damage Control Cable, Wire Rope, of High Mast, S/F of L. T. Panel Board at NMY Pilibhit (Disst. Pilibhit) | 24-May-2018 05:00 PM | 341.87 | | |
8 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_207550_1 | 560 | S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height High Mast, Replacement of Damage, Cable Power Control Cable and Wire Rope of 1 Nos High Mast Light and LED Street Light Fittings at NMY Puranpur (Distt. Pilibhit) | 25-May-2018 01:00 PM | 254.77 | | |
9 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_207991_1 | 566 | Repairing, Tightening, Dismantling of Existing L. T. Line, S/F of 110Watt to 130Watt LED LightS/F of Distribution Panel BoardRewiring of Internal Electrification,S/F of 05 Nos 150 Ltr. Capacity Water Coolar | 25-May-2018 01:00 PM | 342.16 | | |
10 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_208073_1 | 567 | Supply / Installation / Commissining / Testing of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings, Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board and Cabling work at NMY Rampur Distt. Rampur | 25-May-2018 02:00 PM | 273.86 | | |
11 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_208090_1 | 562 | Dismantling, Repairing, Tightening of Existing L. T. Line-S/I of 15 HP Submersible Pumping Cable and Internal Electrification in Pump House at NMY Pilibhit (Distt. Pilibhit) | 25-May-2018 02:00 PM | 267.95 | | |
12 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211154_1 | 586 | Distribution system arrangement for LTline replacement of damaged poles TPNChange overswitch street light cable and street lighting by 110-130Watt LED Lights at NMY Badaun. | 01-Jun-2018 09:00 AM | 250.00 | | |
13 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211196_1 | 589 | S/I/T/C of 2 No. 16 mt. High Mast System at NMY Bisouli(Distt. Badaun). | 01-Jun-2018 09:00 AM | 250.00 | | |
14 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211281_1 | 588 | Repairing of L.T. line, replacement of damaged poles, S/F of 30 No. LED lights 110 to 130 watt.Internal wiring with Copper wire in existing concealed steel conduit in Quarter at NMY Bisouli (Distt. Badaun). | 01-Jun-2018 11:00 AM | 250.00 | | |
15 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211299_1 | 591 | Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 8 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 25 Nos 110-130 Watt LED Street Light Fittings, S/F of Distributtion Panel Board at NMY Dhanaura (Distt. Amroha) | 01-Jun-2018 12:00 PM | 250.00 | | |
16 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211340_1 | 592 | Supply Installation CommissiningTesting of 2 No. 16 mt. High Mast System | 01-Jun-2018 01:00 PM | 250.00 | | |
17 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211363_1 | 593 | Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 8 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 20 Nos 110-130 Watt LED Street Light Fittings at NMY Hasanpur (Distt. Amroha) | 01-Jun-2018 02:00 PM | 250.00 | | |
18 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211383_1 | 587 | S/F/I/C of 15 K.V.A. DG set, 16 mt. High Mast Supply and fixing of 110 watt to 130 watt L.E.D. street light and Repairing of L.T. Line at N.M.Y. Saheswan (Badaun) | 01-Jun-2018 03:00 PM | 250.00 | | |
19 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211434_1 | 583 | S/F of 64 No 200 Watt LED Flood Light Fittings for 4 No. 30 M Height High Mast Repairing of 1 No. high mast by using old Sodium flood lights obtained from all 5 high masts Cable, Wire Rope of 2 No. at NMY Shahjahanpur (Distt. Shahjahanpur) | 01-Jun-2018 03:00 PM | 269.88 | | |
20 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211456_1 | 584 | S/F 60 Nos 110-130 Watt LED Street Light Fittings, Replacement of 13 No. damaged poles at NMY Shahjahanpur (Distt. Shahjahanpur) | 01-Jun-2018 03:00 PM | 250.00 | | |
21 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211462_1 | 585 | S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height Hight Mast (for 01 Nos Hight Mast 16 Nos 200 W LED Flood Light Fitting), Replacement of Damage Power Conteol Cable, Wire Rope of 1 No HighMastLight at NMY Puwayan Distt.Shahjahanpur | 01-Jun-2018 03:00 PM | 250.00 | | |
22 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_211473_1 | 590 | S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos R. O. Plant, 4 KVA Steplizer 05 Nos Construction of Water Coolar Cage 05 Nos, G. I. Pipe Line Connection /F of 22 Watt LED Tube Light Fitting at N M Y. Moradabad (Distt. Moradabad). | 01-Jun-2018 03:00 PM | 250.00 | | |
23 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_218284_1 | 607 | S/F of 48 Nos 170 to 200 Watt LED Flood Light Fittings in 2 Nos 30M Height High Mast, Replacement of Damage Unnder ground Cable, Damage Control Cable, Wire Rope, of High Mast No. 1 and S/F 20 Nos 110-130 Watt LED Street Light Fittings at NMY Beesalpu | 18-Jun-2018 03:00 PM | 250.00 | | |
24 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_218297_1 | 608 | S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height High Mast, Replacement of Damage, Cable Power Control Cable and Wire Rope of 1 Nos High Mast Light and LED Street Light Fittings at NMY Puranpur (Distt. Pilibhit) | 18-Jun-2018 04:00 PM | 254.77 | | |
25 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_219642_1 | 610 | Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement /F 60 Nos LED Street , , Construction of 3 Pole L. T. Distributionfor APF,S/I of 15 HP Submersible Pumping Plant nternal Electrification at nmy pilibhit | 21-Jun-2018 04:00 PM | 267.95 | | |
26 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_219675_1 | 611 | S/F of 96 Nos 200 Watt LED Flood Light Fittings for 4 Nos 30M Height High MastReplacement of Damage Control CableReplacement of Damage Control CableS/F of L. T. Panel Board at NMY Pilibhit (Disst. Pilibhit) | 21-Jun-2018 04:30 PM | 341.87 | | |
27 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_219397_2 | 609 | Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 20 Nos Damage Steel PoleRewiring of Internal Electrification by Copper wire, Modular Switch and S/F of LED Tube Light in Mandi Samiti Office NMY Puranpur (Distt. Pilibhit) | 21-Jun-2018 04:30 PM | 268.16 | | |
28 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223335_1 | 607 | S/F of 48 Nos 170 to 200 Watt LED Flood Light Fittings in 2 Nos 30M Height High Mast, Replacement of Damage Unnder ground Cable, Damage Control Cable, Wire Rope, of High Mast No. 1 and S/F 20 Nos 110-130 Watt LED Street Light Fittings at NMY Beesalpu | 30-Jun-2018 01:30 PM | 250.00 | | |
29 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223366_1 | 608 | S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height High Mast, Replacement of Damage, Cable Power Control Cable and Wire Rope of 1 Nos High Mast Light and LED Street Light Fittings at NMY Puranpur (Distt. Pilibhit) | 30-Jun-2018 02:00 PM | 254.77 | | |
30 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223375_1 | 609 | Dismantling, Repairing, Tightening of Existing L. T. Line, S/F LED Street Light FittingsRewiring of Internal Electrification by Copper wireMandi Samiti Office 100 A Main Switch and Cabling work at NMY Puranpur (Distt. Pilibhit) | 02-Jul-2018 09:00 AM | 268.16 | | |
31 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223396_1 | 610 | Dismantling, Repairing, Tightening of Existing L. T. LineS/F 60 Nos 110-130 Watt LED Street Light FittingsS/I of 15 HP Submersible Pumping Plant 01 no., Coloum Pipe, Starter Panel, Cable and Internal Electrification in Pump House at NMY Pilibhit | 02-Jul-2018 09:00 AM | 267.95 | | |
32 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223602_1 | 611 | S/F of 96 Nos 200 Watt LED Flood Light Fittings for 4 Nos 30M Height High Mast, Replacement of Damage Control Cable, Wire Rope, of High Mast, S/F of L. T. Panel Board at NMY Pilibhit (Disst. Pilibhit) | 02-Jul-2018 09:00 AM | 341.87 | | |
33 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223603_1 | 612 | Supply/Installation of 3 No. 16 mt. High Mast with 200 watt LED Light Fittings and Cabiling, Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board, Cabling work at NMY Moradabad (Distt. Moradabad) | 02-Jul-2018 09:00 AM | 306.24 | | |
34 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223604_1 | 613 | Dismantling, Repairing, Tightening of Existing L. T. Line, S/F of 78 Nos 110-130 Watt LED Street Light FittingsS/L of Cable for Pump House, S/I/ of 03 Nos 150 Ltr. Capacity Water Coolar03 Nos R. O. Plant, 4 KVA Steplizer at NMY Amroha (Distt. Amroha) | 02-Jul-2018 09:00 AM | 356.64 | | |
35 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223607_1 | 614 | Repairing, Tightening, Dismantling of Existing L. T. Line,S/F of 110Watt to 130Watt LED Light Fitting 70 Nos, S/F of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos R. O. Plant,4 KVA SteplizerWater Coolar Cage, at NMY Rampur (Distt. Rampur) | 02-Jul-2018 09:00 AM | 342.16 | | |
36 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223608_1 | 615 | Supply / Installation / Commissining / Testing of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings, Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board and Cabling work at NMY Rampur (Distt. Rampur) | 02-Jul-2018 09:00 AM | 273.86 | | |
37 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223613_1 | 616 | Repairing of 02 No. 30mt. Highmasts and Replacement of 400 watt Sodium Flood Lights by 200 watt L.E.D. Flood Lights,S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos R. O. Plantat N. M. Y. Chandausi(Distt.Sambhal) | 02-Jul-2018 09:00 AM | 277.44 | | |
38 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223756_1 | 617 | S/F of 110 to 130 watt L.E.D. Light fiting on Pole and Repairing of L.T. Line, Internal Electrification in Type I 3 No., type II 4 No., type III 5 No. By copper wire in existing Conduit and in APF at N.M.Y. Sambhal ( Distt. Sambhal) | 02-Jul-2018 09:00 AM | 250.00 | | |
39 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223757_1 | 618 | S/F of 64 No 200 Watt LED Flood Light Fittings for 4 No. 30 M Height High Mast, Repairing of 1 No. high mast by using old Sodium flood lights, Replacement of Damaged Power Control Cableof high mast Light at NMY Shahjahanpur (Distt. shahjahanpur) | 02-Jul-2018 09:00 AM | 269.88 | | |
40 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223758_1 | 619 | S/F 60 Nos 110-130 Watt LED Street Light Fittings, Replacement of 13 No. damaged poles at NMY Shahjahanpur (Distt. Shahjahanpur) | 02-Jul-2018 09:00 AM | 250.00 | | |
41 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223760_1 | 620 | S/F of 72 Nos 200Watt LED Flood Light Fittings for 3 Nos 30M Height High Mast(for 1 Nos Hight Mast 16 Nos 200 W LED Flood Light Fitting) Replacement of Damage Power Control Cable, Wire Rope of 1 No. High Mast Light at NMY Puwayan (Distt Shahjahanpur) | 02-Jul-2018 09:00 AM | 250.00 | | |
42 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223762_1 | 621 | Distribution system arrangement for LTline replacement of damaged poles TPNChange overswitch street light cable and street lighting by 110-130Watt LED Lights at NMY Badaun. | 02-Jul-2018 09:00 AM | 250.00 | | |
43 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223804_1 | 622 | S/F/I/C of 15 K.V.A. DG set, 16 mt. High Mast Supply and fixing of 110 watt to 130 watt L.E.D. street light and Repairing of L.T. Line at N.M.Y. Saheswan (Badaun) | 02-Jul-2018 09:30 AM | 250.00 | | |
44 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223805_1 | 623 | Repairing of L.T. line, replacement of damaged poles, S/F of 30 No. LED lights 110 to 130 watt.Internal wiring with Copper wire in existing concealed steel conduit in Quarter at NMY Bisauli (Distt. Badaun). | 02-Jul-2018 09:45 AM | 250.00 | | |
45 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223806_1 | 624 | S/I/T/C of 2 No. 16 mt. High Mast System at NMY Bisouli(Distt. Badaun). | 02-Jul-2018 09:55 AM | 250.00 | | |
46 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223808_1 | 625 | S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos RO Plant, 4 KVA Steplizer 5 Nos, Rewiring of Internal Electrification in Mandi Samiti Office and Inspection House, S/F of 22Watt LED TubeLight Fitting at NMY Moradabad (Distt.Moradabad) | 02-Jul-2018 10:10 AM | 250.00 | | |
47 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223810_1 | 626 | Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 8 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 25 Nos 110-130 Watt LED Street Light Fittings, S/F of Distributtion Panel Board at NMY Dhanaura (Distt. Amroha) | 02-Jul-2018 10:20 AM | 250.00 | | |
48 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223811_1 | 627 | S/I/C/T of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings,2 Nos 150 Ltr. Capacity Water Coolar, 02 Nos R. O. Plant, 4 KVA Steplizer, Construction of Water Coolar Cage 02 Nos at Dhanaura (Distt. Amroha) | 02-Jul-2018 10:30 AM | 250.00 | | |
49 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_223812_1 | 628 | Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 8 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 20 Nos 110-130 Watt LED Street Light Fittings at NMY Hasanpur (Distt. Amroha) | 02-Jul-2018 10:45 AM | 250.00 | | |
50 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240634_1 | 642 | Rewiring of Internal Electrification and Modular Switch in Kisan Vishram Girh and S/F of LED Tube Light in Dy. Director (Adm), Dy. Director (Cons.), Mandi Parishad at NMY Bareilly | 20-Aug-2018 09:00 AM | 250.00 | | |
51 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240637_1 | 643 | S/F of 24 No 200 Watt LED Flood Light Fittings in 1 No. 30 M Height High Mast and replacement Damaged Trailing Power Control Cable and Painting of Pole at NMY Baheri (Distt. Bareilly) | 20-Aug-2018 09:00 AM | 250.00 | | |
52 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240644_1 | 644 | S/E of 01 No Over Head Type Retro Reflective High Intensity Sign Board on Main Gate and 01 No Cantilever Type Retro Reflective High Intensity Sign Board on Main Road at NMY Baheri (Distt. Bareilly) | 20-Aug-2018 09:00 AM | 250.00 | | |
53 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240652_1 | 645 | S/I of 1 No. Over Head Structure Type Retro Reflective High Intensity Board on Main Gate and 01 No. Cantilever Type Retro Reflective High Intensity Board on Main Road at NMY Puranpur (Distt. Pilibhit) | 20-Aug-2018 09:00 AM | 250.00 | | |
54 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240661_1 | 646 | S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height High Mast, Replacement of Damage, Cable Power Control Cable and Wire Rope of 1 Nos High Mast Light and LED Street Light Fittings at NMY Puranpur (Distt. Pilibhit) | 20-Aug-2018 09:00 AM | 254.77 | | |
55 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240671_1 | 647 | Repair of Existing L.T.Line,Construction of New L.T.Distribution Line,S/F LED Street Light Fitting,Rewiring of Int. Electrification and S/F of LED Tube Light in Mandi Samiti Office, 100A Main Switch and Cabling work at NMY Puranpur(distt. Pilibhit) | 20-Aug-2018 09:00 AM | 268.16 | | |
56 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240757_1 | 648 | Repairing of Existing L. T. LineS/F 60 Nos 110-130 Watt LED Street Light Fittings,S/I of 15 HP Submersible Pumping Plant 01 no.,Coloum Pipe, Starter Panel, Cable and Internal Electrification in Pump House at NMY Pilibhit (Distt. Pilibhit) | 20-Aug-2018 09:00 AM | 267.95 | | |
57 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240776_1 | 649 | S/F of 96 Nos 200 Watt LED Flood Light Fittings for 4 Nos 30M Height High Mast, Replacement of Damage Power Control Cable of 1 Nos High Mast Light (Vegetable Market),S/F of L. T. Panel Board at NMY Pilibhit (Disst. Pilibhit) | 20-Aug-2018 09:00 AM | 341.87 | | |
58 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240787_1 | 650 | S/F of 48 Nos 170 to 200 Watt LED Flood Light Fittings in 2 Nos 30M High Mast,Replacement of Damage Unnder ground Cable,Control Cable,Wire Rope, of High Mast No. 1 and S/F 20 Nos 110-130 Watt LED Street Light Fittings at NMY Beesalpur(Distt Pilibhit) | 20-Aug-2018 09:00 AM | 250.00 | | |
59 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240803_1 | 651 | S/F of 64 No 200 Watt LED Flood Light Fittings for 4 No 30M High Mast Repairing of 1 No. highmast by old Sodium flood lights,Replacement of Damaged Power Control Cable, Wire Rope of 2 No. High Mast Light at NMY Shahjahanpur (Distt. Shahjahanpur) | 20-Aug-2018 09:00 AM | 269.88 | | |
60 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240816_1 | 652 | S/F 60 Nos 110-130 Watt LED Street Light Fittings, Replacement of 13 No. damaged poles at NMY Shahjahanpur (Distt. Shahjahanpur) | 20-Aug-2018 09:00 AM | 250.00 | | |
61 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240829_1 | 653 | S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height Hight MastReplacement of Damage Power Conteol Cable, Wire Rope of 1 No. High Mast Light at NMY Puwayan (Distt.Shahjahanpur) | 20-Aug-2018 09:00 AM | 250.00 | | |
62 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240840_1 | 654 | S/E of 02 Nos Over Head Type Retro Reflective High Intensity Sign Board on Gates at NMY Puwayan (Distt. Shahjahanpur) | 20-Aug-2018 09:00 AM | 250.00 | | |
63 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_240847_1 | 655 | S/F of 110 to 130 Watt LED Light replacement of damage Street light cable at NMY Puwayan (Distt.Shahjahanpur) | 20-Aug-2018 09:00 AM | 250.00 | | |
64 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241028_1 | 656 | Repairing / Extension of L.T line with new Steel tubular pole S/F of LED Street Lamps on pole at N.M.Y. Tilhar ( Shahjahanpur ) | 20-Aug-2018 09:00 AM | 250.00 | | |
65 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241030_1 | 657 | Repairing of 2 Nos. 16 Mtrs High Mast Light,S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos, 4KVA stabilizer, Construction of water cooler cage, GI Pipe line connection and cabling work at N.M.Y. Tilhar ( Shahjahanpur ). | 20-Aug-2018 09:00 AM | 250.00 | | |
66 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241034_1 | 658 | S/F/I/C of 15 K.V.A. DG set, 16 mt. High Mast Supply and fixing of 110 watt to 130 watt L.E.D. street light and Repairing of L.T. Line at N.M.Y. Saheswan (Badaun) | 20-Aug-2018 09:00 AM | 250.00 | | |
67 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241036_1 | 659 | Repairing of L.T. line, replacement of damaged poles, S/F of 30 No. LED lights 110 to 130 watt.Internal wiring with Copper wire in existing concealed steel conduit in Quarter at NMY Bisouli (Distt. Badaun). | 20-Aug-2018 09:00 AM | 250.00 | | |
68 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241037_1 | 660 | S/I/T/C of 2 No. 16 mt. High Mast System at NMY Bisouli(Distt. Badaun). | 20-Aug-2018 09:00 AM | 250.00 | | |
69 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241038_1 | 661 | Repairing of L.T. line, and replacement of damaged Cabls,TPN, change over switches S/F of L.E.D lights 110 to 130w on poles. at N.M.Y. Wazirganj (Badaun). | 20-Aug-2018 09:00 AM | 250.00 | | |
70 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241039_1 | 662 | Repairing of L.T. line, and replacement of damaged Cabls, Poles TPN, change over switches S/F of 30 no L.E.D lights 110 to 135w on poles.at N.M.Y. Dataganj (Badaun). | 20-Aug-2018 09:00 AM | 250.00 | | |
71 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241041_1 | 663 | S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water Coolar,05 Nos R. O. Plant, 4 KVA Steplizer Rewiring of Internal Electrification in Mandi Samiti Office and Inspection House, S/F of 22 Watt LED Tube Light Fitting at N M Y. Moradabad (Distt. Moradabad) | 20-Aug-2018 09:00 AM | 250.00 | | |
72 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241042_1 | 664 | S/I of 3 No. 16 mt. High Mast with 200 watt LED Light Fittings and Cabiling, Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board, Cabling work at NMY Moradabad (Distt. Moradabad) | 20-Aug-2018 09:00 AM | 306.24 | | |
73 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241044_1 | 665 | Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 8 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 25 Nos 110-130 Watt LED Street Light Fittings, S/F of Distributtion Panel Board at NMY Dhanaura (Distt. Amroha) | 20-Aug-2018 09:00 AM | 250.00 | | |
74 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241085_1 | 666 | S/I/C/T of 2 No. 16mt. High Mast System with 200watt LED Light Fittings,02 Nos 150 Ltr. Capacity Water Coolar,02 Nos R.O. Plant,4 KVA Steplizer,Construction of Water Coolar Cage G.I.Pipe Line Connection and Cabling work at Dhanaura(Distt Dhanaura) | 20-Aug-2018 09:00 AM | 250.00 | | |
75 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241092_1 | 667 | Repairing of LT line, S/F of 20 Nos 110-130 Watt LED Street Light Fittings at NMY Hasanpur and repairing of LT line S/F of 15 Nos 110-130 Watt LED Street Light Fittings at SMY Gajraula-Hasanpur (Distt. Amroha) | 20-Aug-2018 09:00 AM | 250.00 | | |
76 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241096_1 | 668 | repairing of LT lineS/F of 78 Nos 110-130 Watt LED Street Light Fittings, Distributtion Panel Board,S/L of Cable for Pump HouseS/I/ of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant,at NMY Amroha (Distt. Amroha) | 20-Aug-2018 09:00 AM | 356.64 | | |
77 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241100_1 | 669 | Internal Electrification and S/F of LED Tube Light in Toilet Block 01 No. at NMY Rampur (Distt. Rampur) | 20-Aug-2018 09:00 AM | 250.00 | | |
78 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241149_1 | 670 | Internal Electrification in Type I 3 No., type II 4 No., type III 5 No. By copper wire in existing Conduit with Moduler Switch, Internal Electrification with copper wire in APF 3no. at N.M.Y. Sambhal ( Distt. Sambhal) | 20-Aug-2018 09:00 AM | 250.00 | | |
79 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241153_1 | 671 | S/F of 110 to 130 watt L.E.D. Light fiting on Pole and Repairing of L.T. Line,Internal Electrification in Type I 3 No., type II 4 No., type III 5 No. , APF 3no. with Copper wire at N.M.Y. Sambhal ( Distt. Sambhal) | 20-Aug-2018 09:00 AM | 250.00 | | |
80 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_241157_1 | 672 | Repairing of 02 No. 30mt. Highmasts,Replacement of 400 watt Sodium Flood Lights by 200 watt L.E.D. Flood Lights, S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos R. O. Plant,at N. M. Y. Chandausi(Distt.Sambhal) | 20-Aug-2018 09:00 AM | 277.44 | | |
81 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_270994_1 | 673 | Rewiring of Internal Electrification and Modular Switch in Kisan Vishram Girh,Rewiring of Internal Electrification and S/F of LED Tube Light in Dy. Director (Adm), Dy. Director (Cons.), Mandi Parishad at NMY Bareilly | 05-Nov-2018 05:45 PM | 250.00 | | |
82 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_271021_1 | 674 | S/F of 24 No 200 Watt LED Flood Light Fittings in 1 No. 30 M Height High Mast and replacement Damaged Trailing Power Control Cable and Painting of Pole at NMY Baheri (Distt. Bareilly) | 05-Nov-2018 05:45 PM | 250.00 | | |
83 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_271038_1 | 675 | Repairing of L.T. line, and replacement of damaged Cabls, Poles TPN, change over switches S/F of 30 no L.E.D lights 110 to 135w on poles.at N.M.Y. Dataganj (Badaun). | 05-Nov-2018 05:45 PM | 250.00 | | |
84 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_271045_1 | 676 | Internal Electrification in Type I 3 No., type II 4 No., type III 5 No. By copper wire in existing Conduit with Moduler Switch, Internal Electrification with copper wire in APF 3no. at N.M.Y. Sambhal ( Distt. Sambhal) | 05-Nov-2018 05:55 PM | 250.00 | | |
85 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_285820_1 | 677 | Internal Electrification and S/F of LED Tube Light in Toilet Block 02 No. at NMY Shahjahanpur (Distt. Shahjahanpur) | 21-Dec-2018 09:45 AM | 250.00 | | |
86 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_285822_1 | 678 | Internal Electrification and S/F of LED Tube Light in Toilet Block 01 No. at NMY Puranpur (Distt. Pilibhit) | 21-Dec-2018 10:00 AM | 250.00 | | |
87 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_285823_1 | 679 | Internal Electrification and S/F of LED Tube Light in Toilet Block 01 No. at NMY Beesalpur (Distt. Pilibhit) | 21-Dec-2018 10:15 AM | 250.00 | | |
88 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_285824_1 | 680 | Internal Electrification in S.M.I Office and generator room at NMY Badaun (Distt.Badaun) | 21-Dec-2018 10:25 AM | 250.00 | | |
89 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_285826_1 | 681 | Distribution system arrangement for LTline replacement of damaged poles TPNChange overswitch street light cable and street lighting by 110-130Watt LED Lights at NMY Badaun. | 21-Dec-2018 10:40 AM | 250.00 | | |
90 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_285831_1 | 682 | Internal Electrification and S/F of LED Tube Light in Toilet Block 01 No. at NMY Chandausi (Distt. Sambhal) | 21-Dec-2018 10:50 AM | 250.00 | | |
91 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2018_RKUMP_285838_1 | 683 | Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 5 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 20 Nos 110-130 Watt LED Street Light Fittings at NMY Babrala (Distt. Sambhal) | 21-Dec-2018 11:05 AM | 250.00 | | |
92 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297024_1 | 684 | S/F of LED light, sifting of L.T. line, due to Road Widening and Distribution of Circuits at NMY Ujhani(Badaun) | 21-Jan-2019 09:00 AM | 287.08 | | |
93 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297028_1 | 685 | Repairing of 02 No. 30mt. Highmasts and Replacement of 400 watt Sodium Flood Lights by 200 watt L.E.D. Flood Lights. S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos and related work at N.M.Y. Ujhani (Distt. Badaun) | 21-Jan-2019 09:00 AM | 250.00 | | |
94 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297034_1 | 686 | S/F of 110 to 130 W.L.E.D street light on poles and Repairing of L.T Line,by replacement of damaged poles, cable and all un service able, A.C.S.R. conductor. G.I. wire at N.M.Y. jalalabad(shajhanpur) | 21-Jan-2019 09:00 AM | 250.00 | | |
95 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297072_2 | 687 | S/I/T/C of 2 No. 16 mt. High Mast System at NMY jalalabad(shajhanpur) | 21-Jan-2019 09:00 AM | 250.00 | | |
96 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297088_1 | 688 | Internal Electrification in 4 No (12x88) APF and 2No (9x40) APF.N.M.Y. jalalabad(shajhanpur) | 21-Jan-2019 09:00 AM | 250.00 | | |
97 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297094_1 | 689 | S/F of 02 No. 150 Ltr. Capacity Water Coolar, 02 Nos R. O. Plant, 4 KVA Steplizer, 02 Nos Construction of Water Coolar Cage, G. I. Pipe Line Connection and at NMY Bahedi (Distt. Bareilly) | 21-Jan-2019 09:00 AM | 250.00 | | |
98 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297139_1 | 690 | Repairing of existing LT line, S/I/C/testing of 2 no. 150ltr water cooler, 2no. RO plant and related work. Repairing of 250 KVA Aluminium winding transformer at NMY Bilaspur (Distt. Rampur) | 21-Jan-2019 09:00 AM | 250.00 | | |
99 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297145_1 | 691 | Cost of S/F of 32 No. 200 Watt LED Flood Light Fittings in 16 Meter Height High Mast 04 No. Replacement of Damage Undergroun Cable of 1 No. High Mast at NMY Bilspur (Distt. Rampur) | 21-Jan-2019 09:00 AM | 250.00 | | |
100 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297149_2 | 692 | Repairing of existing LT line. S/I/C/T of 2no. water cooler, 2no. RO plant and related work. S/F of 1no. 15HP submerssible pump set with Control Panel Board at N. M. Y. Bahjoi (Distt. Sambhal) | 21-Jan-2019 09:00 AM | 250.00 | | |
101 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297158_1 | 693 | Supply/ Installation/ Commissining/ Testing of 2 No. 16 mt. High Mast System with LED Light Fittings and Cabiling work at Bahjoi (Distt. Sambhal | 21-Jan-2019 09:00 AM | 250.00 | | |
102 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297165_1 | 694 | Repairing of existing LT line and S/F of LED street light fittings. S/I/C/T of 1no. water cooler, 1no. RO plant and related work.S/F of 15 HP Submerssible Pump set with Control Panel Board at N. M. Y. Najibabad ( Bijnor ) | 21-Jan-2019 09:00 AM | 250.00 | | |
103 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297169_2 | 695 | S/I/C/T of 2 No. 16 mt. High Mast System with 245 watt LED Light Fittings and Cabiling work. Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board, Cabling work at NMY at NMY Najibabad ( Bijnor ) | 21-Jan-2019 09:00 AM | 250.00 | | |
104 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297174_1 | 696 | Repairing and Tightening of Existing L. T. Line, , S/F of Main Switch, 110 Watt to 130 Watt LED Light Fitting 13 Nos, Rewiring of Internal Electrification in Mandi Samiti Office and Staff Quarter Type 1st 01 No. at NMY Haldaur (Dist Bijnaur) | 21-Jan-2019 09:00 AM | 250.00 | | |
105 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_297175_2 | 697 | Internal Electrification in Toilet block-1 No. at NMY Chandpur. | 21-Jan-2019 09:00 AM | 250.00 | | |
106 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309134_1 | 706 | Replacement of damage 07 No. Steel Tubular Pole, S/F 110 Watt to 130 Watt LED Light Fitting 50 Nos, and Painting of Pole at Navin Grain Mandi Yard, Bareilly (Distt. Bareilly) | 14-Feb-2019 02:30 PM | 250.00 | | |
107 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309247_2 | 707 | Rewiring of Internal Electrification in 4 Suit Inspection House, S/F of 1.8 Ton Split Air Conditionor 2 No. and LED Television 02 No. and S/L of cable for Krishi Vigyan Kendra at Grain Mandi, Bareilly | 14-Feb-2019 04:40 PM | 250.00 | | |
108 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309342_1 | 708 | S/F of 170 To 200 Watt LED Flood Light in 4 No. 16 Meter High Mast, Replacement of existing damage underground Cable at F and V Mandi, Bareilly | 14-Feb-2019 05:00 PM | 250.00 | | |
109 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309361_1 | 710 | S/F of 02 No. 150 Ltr. Capacity Water Coolar, 02 Nos R. O. Plant, 4 KVA Steplizer, 02 Nos Construction of Water Coolar Cage, G. I. Pipe Line Connection and at NMY Bahedi (Distt. Bareilly) | 14-Feb-2019 05:10 PM | 250.00 | | |
110 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309371_1 | 711 | Dismantling, Repairing, Tightening of Existing L. T. Line, Painting of Pole, S/F of 25 Nos 110-130 Watt LED Street Light Fittings at SMY Richcha-Bahedi (Distt. Bareilly) | 14-Feb-2019 05:30 PM | 250.00 | | |
111 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309398_1 | 709 | S/F of 15 No. 110 to 130 watt LED Street Light and Painting of Pole in Sub Mandi Yard Nawabganj and S/F of 15 No. 110 to 130 watt LED Street Light, Main Switch, Painting of Pole at Sub Mandi Yard Nariyawal | 14-Feb-2019 06:00 PM | 250.00 | | |
112 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309421_1 | 712 | Rewiring of Internal Electrification and Modular Switch in A Type Shops 06 No, B Type Shops 30 No. and C Type Shops 14 No., Kisan Vishram Girh and Canteen 01 No, at SMY Richcha-Bahedi (Distt. Bareilly) | 14-Feb-2019 06:15 PM | 250.00 | | |
113 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309432_1 | 713 | S/E of 01 No Cantilever Type Retro Reflective High Intensity Sign Board on Main Road at SMY Richcha-Bahedi (Distt. Bareilly) | 14-Feb-2019 06:30 PM | 250.00 | | |
114 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309446_1 | 714 | S/E of 01 No Over Head Type and one No. Cantilever Type Retro Reflective High Intensity Sign Board at NMY Tilhar (Distt. Shahjahanpur) | 14-Feb-2019 06:45 PM | 250.00 | | |
115 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309456_1 | 715 | Internal Electrification in 30 No super market shop at N.M.Y Bilsi (Badaun) | 14-Feb-2019 06:55 PM | 250.00 | | |
116 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309466_1 | 716 | Internal Electrification in A Type Shops 12 No. A Type Shops 01 No, Auction PlateForm (12x88M) 04 No and Auction PlateForm (12x60M) 02 No. at NMY Ujhani (Distt. Badaun) | 15-Feb-2019 09:00 AM | 250.00 | | |
117 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309479_1 | 717 | S/I/C/Testing of 02 Nos 150 Ltr. Capacity Water Coolar, 4 KVA Steplizer, Servicing of existing 25 KVA diesel Genarator Set, S/F of 110 Watt to 130 Watt LED Light Fitting 15 Nos and Painting of Pole at N. M. Y Milak (Distt. Rampur) | 15-Feb-2019 09:00 AM | 250.00 | | |
118 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309482_2 | 718 | Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 18 Nos Damage Steel Pole, Painting of Pole, S/F 25 Nos 110-130 Watt LED Street Light Fittings, 100A Main Switch and Cabling work at NMY Tanda (Rampur) | 15-Feb-2019 09:00 AM | 250.00 | | |
119 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309502_1 | 719 | Supply/ Installation/ Commissining/ Testing of 2 No. 16 mt. High Mast System with LED Light Fittings and Cabiling work at Bahjoi (Distt. Sambhal) | 15-Feb-2019 09:00 AM | 250.00 | | |
120 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309508_1 | 720 | Repairing and Tightening of Existing L. T. Line, S/F of 110 Watt to 130 Watt LED Light Fitting 33 Nos, Painting of Pole. and Repairing/Overhauling of existing 62.5 KVA diesel Genarator Set at NMY Chandpur (Distt. Bijnaur) | 15-Feb-2019 09:00 AM | 250.00 | | |
121 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309512_1 | 721 | Internal Electrification in C type shops- 05 nos at N.M.Y. Kiratpur ( Distt. Bijnor) | 15-Feb-2019 09:00 AM | 250.00 | | |
122 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309612_1 | 722 | S/F of 110 to 130 W.L.E.D street light on poles and Repairing of L.T Line,by replacement of damaged poles, cable and all un service able, A.C.S.R. conductor. G.I. wire at N.M.Y. jalalabad(shajhanpur) | 15-Feb-2019 11:45 AM | 250.00 | | |
123 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_309666_1 | 723 | Repairing of Existing L. T. Line, S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar, S/F of 15 HP Submerssible Pump set with Control Panel Board at N. M. Y. Najibabad ( Bijnor ) | 15-Feb-2019 12:00 PM | 250.00 | | |
124 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_313048_1 | 724 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Baheri | 19-Feb-2019 11:00 AM | 382.32 | | |
125 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_313059_1 | 725 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Rampur | 19-Feb-2019 11:05 AM | 382.32 | | |
126 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_313074_1 | 726 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bilaspur | 19-Feb-2019 11:25 AM | 382.32 | | |
127 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_313182_1 | 727 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bahjoi | 19-Feb-2019 12:40 PM | 382.32 | | |
128 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_313213_1 | 728 | Comprehensive Maintenance and operation of 1 No. 50M.T. Weigh Bridge three years at NMY Sambhal | 19-Feb-2019 12:50 PM | 250.00 | | |
129 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_313236_1 | 729 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Amroha | 19-Feb-2019 01:10 PM | 382.32 | | |
130 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_313341_1 | 730 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Najibabad | 19-Feb-2019 02:10 PM | 382.32 | | |
131 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_313368_1 | 731 | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Kiratpur | 19-Feb-2019 02:25 PM | 250.00 | | |
132 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327374_1 | 733 | Repairing of L.T. line and replacement of damaged Cables, Poles TPN, change over switches etc., S/F of 20 no. 110 to 135 watt L.E.D lights on poles at S.M.Y. Banda (Puwayan). | 01-Mar-2019 09:00 AM | 250.00 | | |
133 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327377_1 | 734 | Repairing of 2 no. high mast lights and replacement of 400 watt sodium Flood Light on it by 200 watt LED Lights at S.M.Y. Banda (Puwayan). | 01-Mar-2019 09:00 AM | 250.00 | | |
134 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327378_1 | 735 | S/E of 1 No. Over Head Retro Reflective High Intensity Sign Board on Gate at S.M.Y. Banda (Puwayan) (Distt. Shahjahanpur) | 01-Mar-2019 09:00 AM | 250.00 | | |
135 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327379_1 | 736 | Construction of tubewell size (300mmx200mm) AND S/F of 7.5 H.P Submeresible Pump at N.M.Y. Wazirganj (Badaun) | 01-Mar-2019 09:00 AM | 250.00 | | |
136 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327380_1 | 737 | Internal Electrification in 05 No B type shops and 1 No pump House at NMY Wazirganj (Badaun) | 01-Mar-2019 09:00 AM | 250.00 | | |
137 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327381_1 | 738 | Dismantling, Repairing, Tightening of Existing L. T. Line, Painting of Pole, S/F of 20 Nos 110-130 Watt LED Street Light Fittings Repairing of Submerssible Pump at SMY Thakurdwara Under Mandi Samiti Moradabad (Distt. Moradabad) | 01-Mar-2019 09:00 AM | 250.00 | | |
138 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327387_1 | 739 | Construction of L. T. Line, Painting of Pole, S/F of 10 Nos 110-130 Watt LED Street Light Fittings, Main Switch at SMY Kanth Under Mandi Samiti Moradabad (Distt. Moradabad) | 01-Mar-2019 09:00 AM | 250.00 | | |
139 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327388_1 | 740 | Dismantling, Repairing, Tightening of Existing L. T. Line, S/F of 15 Nos 110-130 Watt LED Street Light Fittings and S/I/C/Testing of 02 Nos 150 Ltr. Capacity Water Coolar at NMY Kiratpur (Distt. Bijnaur) | 01-Mar-2019 09:00 AM | 250.00 | | |
140 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327389_1 | 741 | S/F of 7.5 HP Submerssible Pump set with Control Panel Board,S/I/C/Testing of 02 Nos 150 Ltr. Capacity Water Coolerat N. M. Y. Babrala (Distt. Sambhal) | 01-Mar-2019 09:00 AM | 250.00 | | |
141 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327439_1 | 742 | Internal Electrification in C type shop-15 no., 100 MT Godown-2 no. and 12x32 APF - 1 No at N.M.Y. Najibabad ( Distt. Bijnor) | 01-Mar-2019 09:15 AM | 250.00 | | |
142 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_327367_1 | 732 | S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer 04 Nos Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at NMY Pilibhit (Distt. Pilibhit) | 01-Mar-2019 11:00 AM | 250.00 | | |
143 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_334423_1 | 743 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Baheri | 08-Mar-2019 10:45 AM | 382.32 | | |
144 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_334432_1 | 744 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Rampur | 08-Mar-2019 11:00 AM | 382.32 | | |
145 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_334457_1 | 745 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bilaspur | 08-Mar-2019 11:15 AM | 382.32 | | |
146 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_334471_1 | 746 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bahjoi | 08-Mar-2019 11:30 AM | 382.32 | | |
147 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_334488_1 | 747 | Comprehensive Maintenance and operation of 1 No. 50M.T. Weigh Bridge three years at NMY Sambhal | 08-Mar-2019 11:50 AM | 250.00 | | |
148 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_334505_1 | 748 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Amroha | 08-Mar-2019 12:00 PM | 382.32 | | |
149 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_334519_1 | 749 | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Najibabad | 08-Mar-2019 12:15 PM | 382.32 | | |
150 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_334535_1 | 750 | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Kiratpur | 08-Mar-2019 12:25 PM | 250.00 | | |
151 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_335036_2 | 751 | S/F of 110 to 130 W.L.E.D street light on poles and Repairing of L.T Line,by replacement of damaged poles, cable and all un service able, A.C.S.R. conductor. G.I. wire at N.M.Y. jalalabad(shajhanpur) | 08-Mar-2019 05:45 PM | 250.00 | | |
152 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_335092_1 | 752 | S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer 04 Nos Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at NMY Pilibhit (Distt. Pilibhit) | 08-Mar-2019 06:00 PM | 250.00 | | |
153 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_335123_1 | 753 | S/E of 01 No Cantilever Type Retro Reflective High Intensity Sign Board on Main Road at SMY Richcha-Bahedi (Distt. Bareilly) | 08-Mar-2019 06:20 PM | 250.00 | | |
154 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_335143_1 | 754 | S/E of 01 No Over Head Type and one No. Cantilever Type Retro Reflective High Intensity Sign Board at NMY Tilhar (Distt. Shahjahanpur) | 08-Mar-2019 06:30 PM | 250.00 | | |
155 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_335163_1 | 755 | Internal Electrification in C Type Shops 03 and 01 No. pump House at N.M.Y Shaswan (Badaun) | 08-Mar-2019 06:50 PM | 250.00 | | |
156 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_335187_1 | 756 | S/F of 7.5 HP Submerssible Pump set with Control Panel Board, S/I/C/Testing of 02 Nos 150 Ltr. Capacity Water Coolar at N. M. Y. Babrala (Distt. Sambhal) | 09-Mar-2019 09:00 AM | 250.00 | | |
157 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_335203_1 | 757 | Internal Electrification in A type shops-2 no, B type shops-2 no.,C type shops- 30 no C type and super mkt shops-12 nos at N.M.Y. Hasanpur ( Distt. Amroha) | 09-Mar-2019 09:00 AM | 250.00 | | |
158 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_351141_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Baheri | 05-Jun-2019 12:20 PM | 382.32 | | |
159 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_351145_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Rampur | 05-Jun-2019 12:35 PM | 382.32 | | |
160 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_351152_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bilaspur | 05-Jun-2019 12:45 PM | 382.32 | | |
161 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_351249_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bahjoi | 06-Jun-2019 09:00 AM | 382.32 | | |
162 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_351251_1 | | Comprehensive Maintenance and operation of 1 No. 50M.T. Weigh Bridge three years at NMY Sambhal | 06-Jun-2019 09:00 AM | 250.00 | | |
163 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_351253_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Amroha | 06-Jun-2019 09:00 AM | 382.32 | | |
164 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_351254_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Najibabad | 06-Jun-2019 09:00 AM | 382.32 | | |
165 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_351256_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Kiratpur | 06-Jun-2019 09:00 AM | 250.00 | | |
166 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_355791_1 | | S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer 04 Nos Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at NMY Pilibhit (Distt. Pilibhit) | 19-Jun-2019 09:00 AM | 250.00 | | |
167 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_355801_1 | | S/F of 110 to 130 W.L.E.D street light on poles and Repairing of L.T Line,by replacement of damaged poles, cable and all un service able, A.C.S.R. conductor. G.I. wire at N.M.Y. jalalabad(shajhanpur) | 19-Jun-2019 09:20 AM | 250.00 | | |
168 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_355803_1 | | S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer 04 Nos Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at NMY Jalalabad (Distt. Shahjahanpur) | 19-Jun-2019 09:30 AM | 250.00 | | |
169 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_355804_1 | | Internal Electrification in C Type Shops 03 and 01 No. pump House at N.M.Y Shaswan (Badaun) | 19-Jun-2019 09:45 AM | 250.00 | | |
170 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_355806_1 | | S/F of 7.5 HP Submerssible Pump set with Control Panel Board, S/I/C/Testing of 02 Nos 150 Ltr. Capacity Water Coolar, 02 Nos R. O. Plant, 4 KVA Steplizer, Construction of Water Coolar Cage 02 No, and Cabling work at N.M.Y. Babrala (Distt. Sambhal) | 19-Jun-2019 10:05 AM | 250.00 | | |
171 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_355808_1 | | Internal Electrification in A type shops-2 no, B type shops-2 no.,C type shops- 30 no C type and super mkt shops-12 nos at N.M.Y. Hasanpur ( Distt. Amroha) | 19-Jun-2019 11:25 AM | 250.00 | | |
172 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_359511_2 | | S/F of 110 to 130 W.L.E.D street light on poles and Repairing of L.T Line,by replacement of damaged poles, cable and all un service able, A.C.S.R. conductor. G.I. wire at N.M.Y. jalalabad(shajhanpur) | 02-Jul-2019 09:30 AM | 250.00 | | |
173 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_359815_1 | | Internal Electrification in 100 MT Godowns 6 No. at N-M-Y Ujhani (Badaun) | 02-Jul-2019 09:45 AM | 250.00 | | |
174 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_359817_1 | | CONSTRUCTION OF 6 No BORING 110 MM DIA , S/F OF 1.5 H.P at NMY Moradabad | 02-Jul-2019 09:55 AM | 250.00 | | |
175 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_365537_1 | | Supply/ Erection/ Commissioning and Testing of 3840mmX2560mm size Ticker board complete with cable at NMY Shahjahanpur (Shahjahanpur) | 20-Jul-2019 11:25 AM | 266.50 | | |
176 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_365542_1 | | Supply/ Erection/ Commissioning and Testing of 3840mmX2560mm Ticker board complete with cable at NMY Puranpur (Pilibhit) | 20-Jul-2019 11:30 AM | 266.50 | | |
177 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_365568_1 | | Supply/ Erection/ Commissioning and Testing of 3840mmX2560mm Ticker board complete with cable at NMY Chandausi (Sambhal) | 20-Jul-2019 12:10 PM | 266.50 | | |
178 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_389271_1 | | Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Shahjahanpur (Shahjahanpur) | 05-Oct-2019 09:45 AM | 264.02 | | |
179 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_389281_1 | | Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Puranpur (Pilibhit) | 05-Oct-2019 09:55 AM | 264.02 | | |
180 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_389284_3 | | Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Chandausi (Sambhal) | 05-Oct-2019 10:30 AM | 264.02 | | |
181 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_392179_1 | | S/I/TC of 1 No. 16 mt. High Mast System with 170 to 200 watt LED Light Fittings and Cabiling work, S/I of 15 KVA Diesel Generator Set 1 No, Panel Board, S/F of Distribution Panel Board, Main Switch and Cabling work at NMY Aonla (Distt. Bareilly) | 15-Oct-2019 09:45 AM | 250.00 | | |
182 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_392192_1 | | Internal electrification in A-type shops 5 no. at NMY chandpur( Bijnaur) | 15-Oct-2019 11:20 AM | 250.00 | | |
183 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_403349_1 | | Int. Elec. work of Mandi Samiti office, Repairing LT Line, S/F of 7.5HP Submerssible Pump set with Control Panel, S/F of 26 Nos LED Street Light, S/I/T/C of 2No. 16m Mast System and 4No. 150Ltr. Capacity Water Cooler set at NMY SHAHABAD (Rampur) | 14-Nov-2019 09:00 AM | 295.35 | | |
184 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_403366_1 | | S/E of 01 No. Over Head Type and one No. Cantilever type Retro Reflective High Intensity Sign Board at NMY Shahabad ( Rampur) | 14-Nov-2019 09:00 AM | 250.00 | | |
185 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_403413_1 | | Internal Electrification by Copper wire, Modular Switch in 2 No. C-type shops at N.M.Y. Tanda ( Distt. Rampur) . | 14-Nov-2019 09:00 AM | 250.00 | | |
186 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_403424_1 | | Supply/Erection/Commissioning and Testing of 3840mmX2880MM size Ticker board complete with cable at NMY Shahjahanpur (Shahjahanpur) | 14-Nov-2019 06:00 PM | 264.02 | | |
187 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_403728_1 | | Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Puranpur (Pilibhit) | 15-Nov-2019 09:00 AM | 264.02 | | |
188 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_403749_1 | | Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Chandausi (Sambhal) | 15-Nov-2019 09:00 AM | 264.02 | | |
189 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_408682_1 | | Wiring of internal electrification in 20 nos. C type shops at NMY Pilibhit. | 29-Nov-2019 09:00 AM | 250.00 | | |
190 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_408695_1 | | Rewiring of Internal Electrification by Copper wire, Modular Switch and S/F of LED Tube Light in Mandi Samiti Office and S/I/C/T of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings and Cabiling work at NMY Rampur | 29-Nov-2019 09:00 AM | 250.00 | | |
191 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_408697_1 | | S/E of 01 No. Over Head Type and one No. Cantilever type Retro Reflective High Intensity Sign Board at NMY Rampur ( Rampur) | 29-Nov-2019 09:00 AM | 250.00 | | |
192 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_408698_1 | | S/I/T/C of 2 No. 16 mt. High Mast Light System and Cabiling work and 02 Nos 150 Ltr. Capacity Water Coolar, 02 Nos R. O. Plant at N.M.Y. Hasanpur (Amroha) and S/I/C/T of 01 Nos 150 Ltr. Capacity Water Coolar, 01 Nos RO plant at SMY Gajraula | 29-Nov-2019 09:00 AM | 250.00 | | |
193 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_408701_1 | | S/I/C/T of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings, Supply and Installation of Panel Board, LED street light and Cabiling work at NMY Babrala (Distt. Sambhal) | 29-Nov-2019 09:00 AM | 250.00 | | |
194 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_408703_1 | | S/I/C/T of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos R. O. Plant and S/I/C/T of 3 No. 16 mt. High Mast System with 200 watt LED Light Fittings on High masts at N.M.Y. Sambhal (Sambhal) | 29-Nov-2019 09:00 AM | 302.89 | | |
195 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_408705_1 | | Construction of Tubewell size 300x200 mm by D.C. Rig m/c and S/I of 7.5 H.P. Pumping Plant at New T/Well at N.M.Y. Sambhal (sambhal) | 29-Nov-2019 09:00 AM | 250.00 | | |
196 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_408706_1 | | Rewiring of Internal Electrification by Copper wire, Modular Switch and S/F of LED Tube Light in Mandi Samiti Office and 1 No. check post at N.M.Y. Chandausi ( Distt. Sambhal) . | 29-Nov-2019 09:00 AM | 250.00 | | |
197 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_413087_1 | | Supply/Erection/Commissioning and Testing of 3840mmX2880MM size Ticker board complete with cable at NMY Shahjahanpur (Shahjahanpur) | 14-Dec-2019 09:00 AM | 264.02 | | |
198 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_413494_1 | | Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Puranpur (Pilibhit) | 14-Dec-2019 09:00 AM | 264.02 | | |
199 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_413495_1 | | Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Chandausi (Sambhal) | 14-Dec-2019 09:00 AM | 264.02 | | |
200 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_413784_1 | | S/I/C/T of 05 Nos 150Ltr. Capacity Water Coolar, 05Nos R.O. Plant and related work, S/I/C/T of 3No. 16m High Mast System with 200W LED Light Fittings on High masts and 20 no. 120W LED street light on poles with Cabiling work at NMY Sambhal | 16-Dec-2019 09:00 AM | 302.89 | | |
201 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2019_RKUMP_417695_1 | | Construction of Tubewell size 300x200 mm by D.C. Rig m/c and S/I of 7.5 H.P. Pumping Plant at New TubeWell at N.M.Y. Sambhal (sambhal) | 30-Dec-2019 09:00 AM | 250.00 | | |
202 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_424969_1 | | Internal Electrification work in Utility Block, Canteen, toilet block, Urinal block, driver rest room, garbage room and E-NAM office at NMY Puranpur | 17-Jan-2020 05:50 PM | 336.92 | | |
203 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_424986_1 | | Internal Electrification work in Utility Block, canteen and E-NAM office at NMY Shahjahanpur | 17-Jan-2020 06:00 PM | 309.64 | | |
204 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_425000_1 | | Construction of Tubewell and S/F of 01HP Submersible Pump,02 No and wiring at N.M.Y. Tilhar (Distt. Shahjahanpur). | 18-Jan-2020 09:00 AM | 250.00 | | |
205 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_425130_1 | | Internal Electrification in B type shops 20 no, 200 MT godown 2 nos at N.M.Y. Bilaspur ( Distt. Rampur) | 18-Jan-2020 09:00 AM | 250.00 | | |
206 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_425132_1 | | INTERNAL ELECTRIFICATION IN UTILITY BLOCK, CANTEEN WITH PARAG BOOTH, DRIVER REST ROOM, STORE ROOM, TOILET BLOCK, OLD TOILET BLOCK 2NO. , CHECK POST AND E-NAM BUILDING N.M.Y. CHANDAUSI(. SAMBHAL) . | 18-Jan-2020 09:00 AM | 335.00 | | |
207 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_425134_1 | | Internal Electrification in C type shop-10 no., at N.M.Y. Babrala ( Distt. Sambhal) . | 18-Jan-2020 09:00 AM | 250.00 | | |
208 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_428631_1 | | Reparinig of 01 No 16 mt Hight mast replacement Diffective sodium flood light by 200 watt flood light Internal Electrification in APF 01 No (9x40) and making Distrbution System at N.M.Y Wazirganj (Badaun) | 28-Jan-2020 09:00 AM | 250.00 | | |
209 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_428632_1 | | S/E of 1 No. Over Head Retro Reflective High Intensity Sign Board on Gate at N.M.Y. Wazirganj (Badaun) | 28-Jan-2020 04:30 PM | 250.00 | | |
210 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_428900_1 | | Repairing of 01 No. 30 mt. High masts and 16 mt 02 No High masts s/f OF 200 watt L.E.D. Flood Lights, Replacement of damage cables. And cableling work office to gust House, generator room to pump House at N.M.Y. Badaun (Distt. Badaun) | 28-Jan-2020 05:45 PM | 250.00 | | |
211 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_436339_1 | | Repairing of LT line and replacement of 05no. Damaged steel tubular pole and internal electrification in 02no. toilet block at NMY Baheri (Distt. Bareilly) | 18-Feb-2020 09:00 AM | 250.00 | | |
212 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_436343_1 | | Supply/Erection/Commissioning and Testing of 3840mmX2880MM size Ticker board complete with cable at NMY Shahjahanpur (Shahjahanpur) | 18-Feb-2020 09:00 AM | 264.02 | | |
213 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_436348_1 | | Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Puranpur (Pilibhit) | 18-Feb-2020 09:00 AM | 264.02 | | |
214 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_436352_1 | | Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Chandausi (Sambhal) | 18-Feb-2020 09:00 AM | 264.02 | | |
215 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_447619_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Fruit and Vegetable Market). | 17-Mar-2020 10:00 AM | 417.60 | | |
216 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_447634_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Grain Market). | 17-Mar-2020 10:00 AM | 417.60 | | |
217 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_448716_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Shahjahanpur. | 17-Mar-2020 10:00 AM | 417.60 | | |
218 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_448735_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puwayan. | 17-Mar-2020 10:00 AM | 417.60 | | |
219 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_448818_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Budaun. | 17-Mar-2020 10:00 AM | 417.60 | | |
220 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_448837_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Ujhani. | 17-Mar-2020 10:00 AM | 417.60 | | |
221 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_448853_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Pilibhit. | 17-Mar-2020 10:00 AM | 417.60 | | |
222 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_448865_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puranpur. | 17-Mar-2020 10:00 AM | 417.60 | | |
223 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_448885_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandpur. | 17-Mar-2020 10:00 AM | 417.60 | | |
224 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_448908_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandausi. | 17-Mar-2020 10:00 AM | 417.60 | | |
225 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_449141_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Aonla. | 17-Mar-2020 10:00 AM | 250.00 | | |
226 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_449158_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Tilhar. | 17-Mar-2020 10:00 AM | 250.00 | | |
227 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_449168_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Jalalabad. | 17-Mar-2020 10:00 AM | 250.00 | | |
228 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_449170_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Beesalpur. | 17-Mar-2020 10:00 AM | 250.00 | | |
229 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_449173_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Moradabad. | 17-Mar-2020 10:00 AM | 250.00 | | |
230 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_449177_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Shahbad. | 17-Mar-2020 10:00 AM | 250.00 | | |
231 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_449181_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Milak. | 17-Mar-2020 10:00 AM | 250.00 | | |
232 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_449185_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Dhanaura. | 17-Mar-2020 10:00 AM | 250.00 | | |
233 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_466816_1 | | S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, Cabling work at NMY Aonla(Distt. Bareilly) | 07-May-2020 09:00 AM | 250.00 | | |
234 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_466826_1 | | Rewiring of internal electrification in Mandi Samiti Office, Farmer Rest House and Sachiv Awas at NMY Beesalpur. | 07-May-2020 09:00 AM | 250.00 | | |
235 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_466836_1 | | Internal Electrification in 05 No super market shop at N.M.Y Badaun (Badaun) | 07-May-2020 09:00 AM | 250.00 | | |
236 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_466849_1 | | S/I/T/C of 1 No. 16 mt. High Mast System and L.T Disritbutison systm at NMY Dataganj (Distt. Badaun). | 07-May-2020 09:00 AM | 250.00 | | |
237 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_466854_1 | | S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar,1 Nos R. O. Plant, 4 KVA Steplizer 01 Nos, Construction of Water Coolar Cage 01 Nos, G. I. Pipe Line Connection, Cabling work at NMY Dataganj(Distt. Budaun) | 07-May-2020 09:00 AM | 250.00 | | |
238 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_466865_1 | | S/I/C/T of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, Cabling work and internal electrification in office buliding at NMY Sahswan (Budaun) | 07-May-2020 09:00 AM | 250.00 | | |
239 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_466875_1 | | Internal Electrification in 14 No C- type shop and L.T line work at N.M.Y Bisouli (Badaun) | 07-May-2020 09:00 AM | 250.00 | | |
240 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_466885_1 | | Supply/ Installation/ Commissining/ Testing of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings and Cabiling work and Construction of Boring 110 mm dia , S/F of 1.00 H.P submersible pump at NMY Milak (Rampur) | 07-May-2020 09:00 AM | 250.00 | | |
241 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_466892_1 | | Replacing 400 watt S.V.Light by 200 watt LED flood light in 30 Mt. High masts, Cabling work and S/F 80 no. of LED lights and Internal Electrification in Toilet block-4 No. at N.M.Y. Bilaspur( Rampur ) | 07-May-2020 09:00 AM | 250.00 | | |
242 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_466900_1 | | Internal Electrification in New Pump Sambhal (Sambhal ) | 07-May-2020 09:00 AM | 250.00 | | |
243 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_477328_1 | | Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Shahjahanpur(Shahjahanpur) | 01-Jun-2020 09:00 AM | 250.00 | | |
244 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_477329_1 | | Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Puranpur (Pilibhit) | 01-Jun-2020 09:00 AM | 250.00 | | |
245 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_477332_1 | | Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Chandausi (Sambhal) | 01-Jun-2020 09:00 AM | 250.00 | | |
246 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478321_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Fruit and Vegetable Market). | 03-Jun-2020 09:00 AM | 353.90 | | |
247 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478331_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Grain Market). | 03-Jun-2020 09:00 AM | 353.90 | | |
248 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478335_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Shahjahanpur. | 03-Jun-2020 09:00 AM | 353.90 | | |
249 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478339_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puwayan. | 03-Jun-2020 09:00 AM | 353.90 | | |
250 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478340_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Budaun. | 03-Jun-2020 09:00 AM | 353.90 | | |
251 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478344_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Ujhani. | 03-Jun-2020 09:00 AM | 353.90 | | |
252 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478345_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Pilibhit. | 03-Jun-2020 09:00 AM | 353.90 | | |
253 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478349_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puranpur. | 03-Jun-2020 09:00 AM | 353.90 | | |
254 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478352_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandpur. | 03-Jun-2020 09:00 AM | 353.90 | | |
255 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478355_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandausi. | 03-Jun-2020 09:00 AM | 353.90 | | |
256 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478361_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Aonla. | 03-Jun-2020 09:00 AM | 250.00 | | |
257 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478362_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Tilhar. | 03-Jun-2020 09:00 AM | 250.00 | | |
258 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478364_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Jalalabad. | 03-Jun-2020 09:00 AM | 250.00 | | |
259 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478365_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Beesalpur. | 03-Jun-2020 09:00 AM | 250.00 | | |
260 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478366_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Moradabad. | 03-Jun-2020 09:00 AM | 250.00 | | |
261 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478367_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Shahbad. | 03-Jun-2020 09:00 AM | 250.00 | | |
262 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478368_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Milak. | 03-Jun-2020 09:00 AM | 250.00 | | |
263 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_478369_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Dhanaura. | 03-Jun-2020 09:00 AM | 250.00 | | |
264 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_490909_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Fruit and Vegetable Market). | 09-Jul-2020 09:00 AM | 353.90 | | |
265 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_490934_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Grain Market). | 09-Jul-2020 09:00 AM | 353.90 | | |
266 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_490944_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Shahjahanpur. | 09-Jul-2020 09:00 AM | 353.90 | | |
267 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_490954_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puwayan. | 09-Jul-2020 09:00 AM | 353.90 | | |
268 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_490962_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Budaun. | 09-Jul-2020 09:00 AM | 353.90 | | |
269 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_490993_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Ujhani. | 09-Jul-2020 09:00 AM | 353.90 | | |
270 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491003_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Pilibhit. | 09-Jul-2020 09:00 AM | 353.90 | | |
271 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491016_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puranpur. | 09-Jul-2020 09:00 AM | 353.90 | | |
272 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491026_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandpur. | 09-Jul-2020 09:00 AM | 353.90 | | |
273 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491032_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandausi. | 09-Jul-2020 09:00 AM | 353.90 | | |
274 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491041_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Aonla. | 09-Jul-2020 09:00 AM | 250.00 | | |
275 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491046_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Tilhar. | 09-Jul-2020 09:00 AM | 250.00 | | |
276 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491060_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Jalalabad. | 09-Jul-2020 09:00 AM | 250.00 | | |
277 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491067_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Beesalpur. | 09-Jul-2020 09:00 AM | 250.00 | | |
278 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491074_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Moradabad. | 09-Jul-2020 09:00 AM | 250.00 | | |
279 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491078_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Shahbad. | 09-Jul-2020 09:00 AM | 250.00 | | |
280 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491089_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Milak. | 09-Jul-2020 09:00 AM | 250.00 | | |
281 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_491093_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Dhanaura. | 09-Jul-2020 09:00 AM | 250.00 | | |
282 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_501402_1 | | Repair of LT line and line shifting, S/F of main switch and LT panel at NMY Shahjahanpur. | 14-Aug-2020 09:00 AM | 250.00 | | |
283 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_501410_1 | | Repairing of existing LT line, S/F of LED street lights, Repair of existing 30m hight high mast, S/F of LED flood light and Internal Electrification in Office and Toilet Block at NMY Bilsi | 14-Aug-2020 09:00 AM | 276.80 | | |
284 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_501419_1 | | Rewiring of internal electrification in Inspection House, S/I of 02no. Split AC in inspection house and internal electrification in Farmer Rest House at NMY Puranpur. | 14-Aug-2020 09:00 AM | 250.00 | | |
285 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_501427_1 | | Repairing of LT line and replacement of damaged steel tubular pole at NMY Beesalpur (Distt. Pilibhit) | 14-Aug-2020 09:00 AM | 250.00 | | |
286 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_501436_1 | | Provision of cable for street light, S/F of 110 Watt to 130 Watt LED Light Fitting 30 Nos, Painting of existing poles at NMY Moradabad. | 14-Aug-2020 09:00 AM | 250.00 | | |
287 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_506116_1 | | S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, Cabling work at NMY Aonla(Distt. Bareilly) | 29-Aug-2020 09:00 AM | 250.00 | | |
288 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_506128_1 | | Rewiring of internal electrification in Mandi Samiti Office, Farmer Rest House and Sachiv Awas at NMY Beesalpur. | 29-Aug-2020 09:00 AM | 250.00 | | |
289 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_506137_1 | | S/I/T/C of 1 No. 16 mt. High Mast System and L.T Disritbutison systm at NMY Dataganj (Distt. Badaun). | 29-Aug-2020 09:00 AM | 250.00 | | |
290 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_506151_1 | | S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, Cabling work and internal electrification in office buliding at NMY Sahswan (BUDAUN) | 29-Aug-2020 09:00 AM | 250.00 | | |
291 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_506170_2 | | Supply/ Installation/ Commissining/ Testing of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings and Cabiling work and Construction of Boring 110 mm dia , S/F of 1.00 H.P submersible pump at NMY Milak (Rampur) | 29-Aug-2020 09:00 AM | 250.00 | | |
292 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_506187_1 | | Supply and Replacing 400 watt S.V.Light by 200 watt LED flood light in 30 Mt. High masts, Cabling work and S/F 80 no. of LED lights and Internal Electrification in Toilet block-4 No. at N.M.Y. Bilaspur( Rampur ) | 29-Aug-2020 09:00 AM | 250.00 | | |
293 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_507344_1 | | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/T/C of 2.00KW off grid solar plant and S/I/T/C of Solar LED Street light in Nuranpur and Chandrapura (Mandi Samiti, Bisalpur). | 03-Sep-2020 09:00 AM | 250.00 | | |
294 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_507346_1 | | S/F of LED street light and main switch at NMY Tilhar (Shahjahanpur) | 03-Sep-2020 09:00 AM | 250.00 | | |
295 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_507347_1 | | Internal Electrification in 05 No super market shop at N.M.Y Badaun (Badaun) | 03-Sep-2020 09:00 AM | 250.00 | | |
296 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_507348_1 | | S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar,1 Nos R. O. Plant, 4 KVA Steplizer 01 Nos, Construction of Water Coolar Cage 01 Nos, G. I. Pipe Line Connection, Cabling work at NMY Dataganj(Distt. Budaun) | 03-Sep-2020 09:00 AM | 250.00 | | |
297 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_507349_1 | | Internal Electrification in 14 No C- type shop and L.T line work at N.M.Y Bisouli (Badaun) | 03-Sep-2020 09:00 AM | 250.00 | | |
298 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_507350_1 | | S/I/T/C of 03 no. 16m high mast system and cabling work at NMY Bilsi (Budaun) | 03-Sep-2020 09:00 AM | 250.00 | | |
299 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_507351_1 | | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/T/C of 2.00KW off grid solar plant and S/I/T/C of Solar LED Street light in Godhi and Machariya (Mandi Samiti, Moradabad). | 03-Sep-2020 09:00 AM | 250.00 | | |
300 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_507352_1 | | Internal Electrification in New Pump Sambhal (Sambhal ) | 03-Sep-2020 09:00 AM | 250.00 | | |
301 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_507353_1 | | Construction of 03 no. Mini boring and S/F OF 1.00 H.P submersible pump at NMY Sambhal ( Sambhal ). | 03-Sep-2020 09:00 AM | 250.00 | | |
302 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_507354_1 | | Construction of 01 no. Mini boring and S/F of submersible pump set at SMY Gajraula( Amroha) and Construction of 02 no. Mini boring and S/F of submersible pump set at NMY Hasanpur (Amroha). | 03-Sep-2020 09:00 AM | 250.00 | | |
303 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_512188_1 | | S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, Cabling work at NMY Aonla(Distt. Bareilly) | 17-Sep-2020 09:00 AM | 250.00 | | |
304 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_512199_1 | | S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Cooler Cage 03 Nos, Pipe Line Connection, Cabling and internal electrification in office buliding at NMY Sahswan (Budaun) | 17-Sep-2020 09:00 AM | 250.00 | | |
305 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_514922_1 | | S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, Cabling work at NMY Aonla(Distt. Bareilly) | 26-Sep-2020 09:00 AM | 250.00 | | |
306 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_514935_1 | | S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, and internal electrification in office buliding at NMY Sahswan (Budaun) | 26-Sep-2020 09:00 AM | 250.00 | | |
307 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_520258_1 | | S/F of LED street light and main switch at NMY Tilhar (Shahjahanpur) | 14-Oct-2020 09:00 AM | 250.00 | | |
308 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_520263_1 | | Internal Electrification in 05 No super market shop at N.M.Y Badaun (Badaun) | 14-Oct-2020 09:00 AM | 250.00 | | |
309 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_520283_1 | | S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar,1 Nos R. O. Plant, 4 KVA Steplizer 01 Nos, Construction of Water Coolar Cage 01 Nos, G. I. Pipe Line Connection, Cabling work at NMY Dataganj(Distt. Budaun) | 14-Oct-2020 09:00 AM | 250.00 | | |
310 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_520289_1 | | Internal Electrification in 14 No C- type shop and L.T line work at N.M.Y Bisouli (Badaun) | 14-Oct-2020 09:00 AM | 250.00 | | |
311 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_520295_1 | | Internal Electrification in New Pump Sambhal (Sambhal ) | 14-Oct-2020 09:00 AM | 250.00 | | |
312 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_520313_1 | | Construction of 03 no. Mini boring and S/F OF 1.00 H.P submersible pump at NMY Sambhal ( Sambhal ). | 14-Oct-2020 09:00 AM | 250.00 | | |
313 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531348_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Fruit and Vegetable Market). | 19-Nov-2020 09:00 AM | 353.90 | | |
314 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531354_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Grain Market). | 19-Nov-2020 09:00 AM | 353.90 | | |
315 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531359_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Shahjahanpur. | 19-Nov-2020 09:00 AM | 353.90 | | |
316 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531362_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puwayan. | 19-Nov-2020 09:00 AM | 353.90 | | |
317 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531365_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Budaun. | 19-Nov-2020 09:00 AM | 353.90 | | |
318 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531369_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Ujhani. | 19-Nov-2020 09:00 AM | 353.90 | | |
319 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531373_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Pilibhit. | 19-Nov-2020 09:00 AM | 353.90 | | |
320 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531376_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puranpur. | 19-Nov-2020 09:00 AM | 353.90 | | |
321 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531380_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandpur. | 19-Nov-2020 09:00 AM | 353.90 | | |
322 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531393_1 | | Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandausi. | 19-Nov-2020 09:00 AM | 353.90 | | |
323 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531401_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Aonla. | 19-Nov-2020 09:00 AM | 250.00 | | |
324 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531407_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Tilhar. | 19-Nov-2020 09:00 AM | 250.00 | | |
325 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531413_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Jalalabad. | 19-Nov-2020 09:00 AM | 250.00 | | |
326 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531421_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Beesalpur. | 19-Nov-2020 09:00 AM | 250.00 | | |
327 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531430_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Moradabad. | 19-Nov-2020 09:00 AM | 250.00 | | |
328 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531438_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Shahbad. | 19-Nov-2020 09:00 AM | 250.00 | | |
329 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531442_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Milak. | 19-Nov-2020 09:00 AM | 250.00 | | |
330 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_531446_1 | | Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Dhanaura. | 19-Nov-2020 09:00 AM | 250.00 | | |
331 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_532046_1 | | S/F of LED street light and main switch at NMY Tilhar (Shahjahanpur) | 23-Nov-2020 09:00 AM | 250.00 | | |
332 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_532049_1 | | Internal Electrification in 05 No super market shop at N.M.Y Badaun (Badaun) | 23-Nov-2020 09:00 AM | 250.00 | | |
333 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_532053_1 | | S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar,1 Nos R. O. Plant, 4 KVA Steplizer 01 Nos, Construction of Water Coolar Cage 01 Nos, G. I. Pipe Line Connection, Cabling work at NMY Dataganj(Distt. Budaun) | 23-Nov-2020 09:00 AM | 250.00 | | |
334 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_532057_1 | | Internal Electrification in 14 No C- type shop and L.T line work at N.M.Y Bisouli (Badaun) | 23-Nov-2020 09:00 AM | 250.00 | | |
335 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_532064_1 | | Internal Electrification in New Pump Sambhal (Sambhal ) | 23-Nov-2020 09:00 AM | 250.00 | | |
336 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_532072_1 | | Construction of 03 no. Mini boring and S/F OF 1.00 H.P submersible pump at NMY Sambhal ( Sambhal ). | 23-Nov-2020 09:00 AM | 250.00 | | |
337 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_533423_1 | | Internal Electrification in 03 No APF (12x44M), S/F of 7.5 H.P Submersible pump and associated L.T. line work at N.M.Y Dataganj (Badaun) | 27-Nov-2020 09:00 AM | 250.00 | | |
338 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_533429_1 | | Internal Electrification in 01 no. toilet block at NMY Chandausi (Sambhal) | 27-Nov-2020 09:00 AM | 250.00 | | |
339 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_533439_1 | | Construction of 01 no. Mini boring and S/F of submersible pump set at SMY Gajraula( Amroha) and Construction of 02 no. Mini boring and S/F of submersible pump set at NMY Hasanpur (Amroha). | 27-Nov-2020 09:00 AM | 250.00 | | |
340 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_539591_1 | | Internal Signage work using retro reflective sheet at NMY Puranpur | 21-Dec-2020 09:00 AM | 250.00 | | |
341 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_539593_1 | | Shifting of pole / Repairing of L. T. Line and CONSTRUCTION OF 2 No BORING 140 MM DIA , S/F OF submersible pump set at NMY chandausi ( Distt. Sambhal) . | 21-Dec-2020 09:00 AM | 251.35 | | |
342 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_540439_1 | | S/F of LED street light, main switch and change over switch at NMY Ujhani (Budaun) | 24-Dec-2020 09:00 AM | 250.00 | | |
343 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_540446_1 | | S/I of 1 No. Over Head Structure Type Retro Reflective High Intensity Board on Main Gate at NMY Ujhani (Distt. Budaun) | 24-Dec-2020 09:00 AM | 250.00 | | |
344 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_540458_1 | | Construction of Tubewell and S/F of 01HP Submersible Pump at NMY Sahswan (Budaun) | 24-Dec-2020 09:00 AM | 250.00 | | |
345 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2020_RKUMP_540462_1 | | S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer, Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at N. M. Y. Najibabad (Distt. Bijnaur) | 24-Dec-2020 09:00 AM | 250.00 | | |
346 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_544652_1 | | S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar, 01 Nos R. O. Plant, 4 KVA Steplizer 01 Nos, Cabling work, S/E of LT panel, construction of 01 no. Mini boring with 1HP submersible pump at SMY Banda(Puwayan) | 11-Jan-2021 09:00 AM | 250.00 | | |
347 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_544657_1 | | S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar, 01 Nos R. O. Plant, 4 KVA Steplizer 01 Nos. at NMY Baheri (Bareilly) | 11-Jan-2021 09:00 AM | 250.00 | | |
348 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_544785_1 | E-Quotation 948 | S/I/T/C of VHT Unit,Mango Processing Line, Cold Room,Ripening Room,Pre-Cold Room,DG Sets,Vegetable Processing Line,LT Panel,Evaporator and Condensing Unit,Puff Panel and supply of allied equipments for Fruit and vegetable pack house, NMY Amroha | 11-Jan-2021 09:00 AM | 250.00 | | |
349 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_545840_1 | | Rewiring of internal electrification in Mandi Samiti Office, S/F of LED tubelight, S/E of damaged 2 no. steel tubular poles near mandi yard gate, S/L of cable for mandi samiti office and main cable from transformer at NMY Bareilly | 15-Jan-2021 09:00 AM | 250.00 | | |
350 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_545841_1 | | S/F of LED flood light in 03 no. 16m hight high mast and fixing of old sodium lights in 01 no. 16m high mast system at SMY Nawabganj(Bareilly) | 15-Jan-2021 09:00 AM | 250.00 | | |
351 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_546648_1 | | S/F of LED street light and main switch at NMY Tilhar (Shahjahanpur) | 19-Jan-2021 09:00 AM | 250.00 | | |
352 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_546649_1 | | Internal Electrification in 14 No C- type shop and L.T line work at N.M.Y Bisouli (Badaun) | 19-Jan-2021 09:00 AM | 250.00 | | |
353 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_546650_1 | | S/F of LED street light, main switch and change over switch at NMY Ujhani (Budaun) | 19-Jan-2021 09:00 AM | 250.00 | | |
354 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_546651_1 | | S/I of 1 No. Over Head Structure Type Retro Reflective High Intensity Board on Main Gate at NMY Ujhani (Distt. Budaun) | 19-Jan-2021 09:00 AM | 250.00 | | |
355 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_546652_1 | | Construction of Tubewell and S/F of 01HP Submersible Pump at NMY Sahswan (Budaun) | 19-Jan-2021 09:00 AM | 250.00 | | |
356 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_546653_1 | | Internal Electrification in 03 No APF (12x44M), S/F of 7.5 H.P Submersible pump andassociatedL.T line work at N.M.Y Dataganj(Badaun) | 19-Jan-2021 09:00 AM | 250.00 | | |
357 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_546654_1 | | Internal Signage work using retro reflective sheet at NMY Puranpur | 19-Jan-2021 09:00 AM | 250.00 | | |
358 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_546655_1 | | Internal Electrification in 01 no. toilet block at NMY Chandausi (Sambhal) | 19-Jan-2021 09:00 AM | 250.00 | | |
359 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_546656_1 | | Construction of 01 no. Mini boring and S/F of submersible pump set at SMY Gajraula( Amroha) and Construction of 02 no. Mini boring and S/F of submersible pump set at NMY Hasanpur (Amroha). | 19-Jan-2021 09:00 AM | 250.00 | | |
360 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_554388_1 | | S/F of LED street light, main switch and change over switch at NMY Ujhani (Budaun) | 12-Feb-2021 09:00 AM | 250.00 | | |
361 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_554407_1 | | Construction of Tubewell and S/F of 01HP Submersible Pump at NMY Sahswan (Budaun) | 12-Feb-2021 09:00 AM | 250.00 | | |
362 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_554415_1 | | Internal Electrification in 03 No APF (12x44M), S/F of 7.5 H.P Submersible pump andassociatedL.T line work at N.M.Y Dataganj(Badaun) | 12-Feb-2021 09:00 AM | 250.00 | | |
363 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_554421_1 | | Supply and laying of cable from generator room to inspection house at NMY Pilibhit (Pilibhit) | 12-Feb-2021 09:00 AM | 250.00 | | |
364 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_554425_1 | | Internal Electrification in 01 no. toilet block at NMY Chandausi (Sambhal) | 12-Feb-2021 09:00 AM | 250.00 | | |
365 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_560021_1 | | S/I/T/C of VHT unit, Cold Room, Ripening room, Fruits processing line, Veg. processing line, hot water treatment unit and allied equipments, Comprehensive Annual Maintenance for 4yrs. Operation for 5yrs of Integrated Pack House at NMY Amroha | 27-Feb-2021 09:00 AM | 5000.00 | | |
366 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_560030_1 | | Internal electrification work, S/E of LT panel, S/I/T/C of Diesel Generator Set and S/I/T/C of 02no. 16m high mast with LED flood light and Construction of mini boring with S/F of 02HP Submersible Pump in Integrated Pack House Facility at NMY Amroha | 27-Feb-2021 09:00 AM | 961.34 | | |
367 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_560673_1 | | S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar, 01 Nos R. O. Plant, 4 KVA Steplizer 01 Nos. at NMY Baheri (Bareilly) | 01-Mar-2021 09:00 AM | 250.00 | | |
368 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_564771_1 | | Supply and laying of cable from generator room to inspection house at NMY Pilibhit (Pilibhit) | 08-Mar-2021 09:00 AM | 250.00 | | |
369 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_564795_1 | | Internal Electrification in 01 no. toilet block at NMY Chandausi (Sambhal) | 08-Mar-2021 09:00 AM | 250.00 | | |
370 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_567737_1 | | Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/T/C of 2.00KW on grid solar plant and 4 no. solar street light in Rurban Mart Vill. Faridpur Inayat Khan, Development Block Bithri Chainpur. | 11-Mar-2021 09:00 AM | 250.00 | | |
371 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_567878_1 | | S/F of steel tubular poles with LED street light on main gate, S/L of cable for residential colony and APF, Construction of 1no. Mini Boring and S/F of 01 HP Submersible Pump at NMY Milak. | 12-Mar-2021 09:00 AM | 250.00 | | |
372 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_586882_1 | | S/I/T/C of mechanical machines and allied equipments at Integrated Pack House Amroha, Maintenance and operation of Integrated Pack House Amroha. | 18-May-2021 09:00 AM | 5000.00 | | |
373 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_586923_1 | | S/F of steel tubular poles with LED street light on main gate, S/L of cable for residential colony and APF, Construction of 1no. Mini Boring and S/F of 01 HP Submersible Pump at NMY Milak. | 18-May-2021 09:00 AM | 250.00 | | |
374 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_591710_1 | | Mechanical work at Integrated pack house, Amroha | 03-Jun-2021 09:00 AM | 5000.00 | | |
375 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_621725_1 | | S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, Cabling work, Construction of 02 no. boring 110mm dia and S/F of 1.00 HP submersible pump at NMY Beesalpur | 21-Sep-2021 09:00 AM | 250.00 | | |
376 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_621726_1 | | S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Tilhar (Distt. Shahjahanpur) | 21-Sep-2021 09:00 AM | 250.00 | | |
377 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_621727_1 | | S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Bilsi (Distt. Budaun) | 21-Sep-2021 09:00 AM | 250.00 | | |
378 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_621728_1 | | S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Bisauli (Distt. Budaun) | 21-Sep-2021 09:00 AM | 250.00 | | |
379 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_621729_1 | | S/F of LED flood lights in 3 no. 16mt. Hight high mast, S/F of LED street light at NMY Chandpur (Distt. Bijnaur) | 21-Sep-2021 09:00 AM | 250.00 | | |
380 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_621730_1 | | Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe at NMY Chandpur (Distt. Bijnaur) | 21-Sep-2021 09:00 AM | 250.00 | | |
381 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_621731_1 | | Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe and cabling work at NMY Rampur (Distt. Rampur) | 21-Sep-2021 09:00 AM | 250.00 | | |
382 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_636992_1 | | S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Tilhar (Distt. Shahjahanpur) | 28-Oct-2021 09:00 AM | 250.00 | | |
383 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_637011_1 | | S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Bisauli (Distt. Budaun) | 28-Oct-2021 09:00 AM | 250.00 | | |
384 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_637027_1 | | Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe at NMY Chandpur (Distt. Bijnaur) | 28-Oct-2021 09:00 AM | 250.00 | | |
385 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_637051_1 | | Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe and cabling work at NMY Rampur (Distt. Rampur) | 28-Oct-2021 09:00 AM | 250.00 | | |
386 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_643974_1 | | S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Tilhar (Distt. Shahjahanpur) | 17-Nov-2021 09:00 AM | 250.00 | | |
387 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_643984_1 | | S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Bisauli (Distt. Budaun) | 17-Nov-2021 09:00 AM | 250.00 | | |
388 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_643995_1 | | Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe at NMY Chandpur (Distt. Bijnaur) | 17-Nov-2021 09:00 AM | 250.00 | | |
389 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_644006_1 | | Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe and cabling work at NMY Rampur (Distt. Rampur) | 17-Nov-2021 09:00 AM | 250.00 | | |
390 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_650391_1 | | S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Tilhar (Distt. Shahjahanpur) | 03-Dec-2021 09:00 AM | 250.00 | | |
391 | SE Zone-2||Dy Director Construction(E-M), Bareilly | 2021_RKUMP_650405_1 | | S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Bisauli (Distt. Budaun) | 03-Dec-2021 09:00 AM | 250.00 | | |
Total | | | | | | 121945.38 | | |