Tender detail with uplc charges
SNOrgnizationTender IdTender Reference NoTender TitlePublishedDateAmount(UPLC Charges)PaymentPayment Detail
1SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_205942_151S/F of 48 Nos 170 to 200 Watt LED Flood Light Fittings in 2 Nos 30M Height High Mast, Replacement of Damage Unnder ground Cable, Damage Control Cable, Wire Rope, of High Mast No. 1 and S/F 20 Nos 110-130 Watt LED Street Light Fitting at NMY Beesalpur22-May-2018 10:00 AM250.00
2SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_205983_151L. T. Line RepairingS/F of 78 Nos 110-130 Watt LED S/F of Distributtion Panel Board, S/L of Cable for Pump HouseS/I/ of 03 Nos 150 Ltr. Capacity Water Coolarat NMY Amroha (Distt. Amroha)22-May-2018 10:00 AM356.64
3SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_206045_1563Supply/Installation of 3 No. 16 mt. High Mast with 200 watt LED Light Fittings and Cabiling, Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board, Cabling work at NMY Moradabad District Moradabad24-May-2018 05:00 PM306.24
4SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_207430_1569S/F of 110 to 130 watt L.E.D. Light fiting on Pole and Repairing of L.T. Line, Replacement of damage poles, Damage Cable and all ACSR, G.I. wire, at N.M.Y. Sambhal Distt. Sambhal24-May-2018 05:00 PM250.00
5SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_207451_1568Repairing of 02 No. 30mt. Highmasts and Replacement of 400 watt Sodium Flood Lights by 200 watt L.E.D. Flood Lights, Replacement of damage cables.-S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water CoolarN. M. Y. Chandausi(Distt.Sambhal24-May-2018 05:00 PM277.44
6SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_207498_1561Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 20 Nos Damage Steel Pole,S/F LED Street Light Fittings, Rewiring of Internal Electrification in Mandi Samiti Office and Cabling work at NMY Puranpur (Distt. Pilibhit)24-May-2018 05:00 PM268.16
7SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_207513_1563S/F of 96 Nos 200 Watt LED Flood Light Fittings for 4 Nos 30M Height High MastReplacement of Damage Control Cable, Wire Rope, of High Mast, S/F of L. T. Panel Board at NMY Pilibhit (Disst. Pilibhit)24-May-2018 05:00 PM341.87
8SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_207550_1560S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height High Mast, Replacement of Damage, Cable Power Control Cable and Wire Rope of 1 Nos High Mast Light and LED Street Light Fittings at NMY Puranpur (Distt. Pilibhit)25-May-2018 01:00 PM254.77
9SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_207991_1566Repairing, Tightening, Dismantling of Existing L. T. Line, S/F of 110Watt to 130Watt LED LightS/F of Distribution Panel BoardRewiring of Internal Electrification,S/F of 05 Nos 150 Ltr. Capacity Water Coolar25-May-2018 01:00 PM342.16
10SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_208073_1567Supply / Installation / Commissining / Testing of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings, Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board and Cabling work at NMY Rampur Distt. Rampur25-May-2018 02:00 PM273.86
11SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_208090_1562Dismantling, Repairing, Tightening of Existing L. T. Line-S/I of 15 HP Submersible Pumping Cable and Internal Electrification in Pump House at NMY Pilibhit (Distt. Pilibhit)25-May-2018 02:00 PM267.95
12SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211154_1586Distribution system arrangement for LTline replacement of damaged poles TPNChange overswitch street light cable and street lighting by 110-130Watt LED Lights at NMY Badaun.01-Jun-2018 09:00 AM250.00
13SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211196_1589S/I/T/C of 2 No. 16 mt. High Mast System at NMY Bisouli(Distt. Badaun).01-Jun-2018 09:00 AM250.00
14SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211281_1588Repairing of L.T. line, replacement of damaged poles, S/F of 30 No. LED lights 110 to 130 watt.Internal wiring with Copper wire in existing concealed steel conduit in Quarter at NMY Bisouli (Distt. Badaun).01-Jun-2018 11:00 AM250.00
15SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211299_1591Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 8 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 25 Nos 110-130 Watt LED Street Light Fittings, S/F of Distributtion Panel Board at NMY Dhanaura (Distt. Amroha)01-Jun-2018 12:00 PM250.00
16SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211340_1592Supply Installation CommissiningTesting of 2 No. 16 mt. High Mast System01-Jun-2018 01:00 PM250.00
17SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211363_1593Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 8 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 20 Nos 110-130 Watt LED Street Light Fittings at NMY Hasanpur (Distt. Amroha)01-Jun-2018 02:00 PM250.00
18SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211383_1587S/F/I/C of 15 K.V.A. DG set, 16 mt. High Mast Supply and fixing of 110 watt to 130 watt L.E.D. street light and Repairing of L.T. Line at N.M.Y. Saheswan (Badaun)01-Jun-2018 03:00 PM250.00
19SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211434_1583S/F of 64 No 200 Watt LED Flood Light Fittings for 4 No. 30 M Height High Mast Repairing of 1 No. high mast by using old Sodium flood lights obtained from all 5 high masts Cable, Wire Rope of 2 No. at NMY Shahjahanpur (Distt. Shahjahanpur)01-Jun-2018 03:00 PM269.88
20SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211456_1584S/F 60 Nos 110-130 Watt LED Street Light Fittings, Replacement of 13 No. damaged poles at NMY Shahjahanpur (Distt. Shahjahanpur)01-Jun-2018 03:00 PM250.00
21SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211462_1585S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height Hight Mast (for 01 Nos Hight Mast 16 Nos 200 W LED Flood Light Fitting), Replacement of Damage Power Conteol Cable, Wire Rope of 1 No HighMastLight at NMY Puwayan Distt.Shahjahanpur01-Jun-2018 03:00 PM250.00
22SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_211473_1590S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos R. O. Plant, 4 KVA Steplizer 05 Nos Construction of Water Coolar Cage 05 Nos, G. I. Pipe Line Connection /F of 22 Watt LED Tube Light Fitting at N M Y. Moradabad (Distt. Moradabad).01-Jun-2018 03:00 PM250.00
23SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_218284_1607S/F of 48 Nos 170 to 200 Watt LED Flood Light Fittings in 2 Nos 30M Height High Mast, Replacement of Damage Unnder ground Cable, Damage Control Cable, Wire Rope, of High Mast No. 1 and S/F 20 Nos 110-130 Watt LED Street Light Fittings at NMY Beesalpu18-Jun-2018 03:00 PM250.00
24SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_218297_1608S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height High Mast, Replacement of Damage, Cable Power Control Cable and Wire Rope of 1 Nos High Mast Light and LED Street Light Fittings at NMY Puranpur (Distt. Pilibhit)18-Jun-2018 04:00 PM254.77
25SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_219642_1610Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement /F 60 Nos LED Street , , Construction of 3 Pole L. T. Distributionfor APF,S/I of 15 HP Submersible Pumping Plant nternal Electrification at nmy pilibhit21-Jun-2018 04:00 PM267.95
26SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_219675_1611S/F of 96 Nos 200 Watt LED Flood Light Fittings for 4 Nos 30M Height High MastReplacement of Damage Control CableReplacement of Damage Control CableS/F of L. T. Panel Board at NMY Pilibhit (Disst. Pilibhit)21-Jun-2018 04:30 PM341.87
27SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_219397_2609Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 20 Nos Damage Steel PoleRewiring of Internal Electrification by Copper wire, Modular Switch and S/F of LED Tube Light in Mandi Samiti Office NMY Puranpur (Distt. Pilibhit)21-Jun-2018 04:30 PM268.16
28SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223335_1607S/F of 48 Nos 170 to 200 Watt LED Flood Light Fittings in 2 Nos 30M Height High Mast, Replacement of Damage Unnder ground Cable, Damage Control Cable, Wire Rope, of High Mast No. 1 and S/F 20 Nos 110-130 Watt LED Street Light Fittings at NMY Beesalpu30-Jun-2018 01:30 PM250.00
29SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223366_1608S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height High Mast, Replacement of Damage, Cable Power Control Cable and Wire Rope of 1 Nos High Mast Light and LED Street Light Fittings at NMY Puranpur (Distt. Pilibhit)30-Jun-2018 02:00 PM254.77
30SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223375_1609Dismantling, Repairing, Tightening of Existing L. T. Line, S/F LED Street Light FittingsRewiring of Internal Electrification by Copper wireMandi Samiti Office 100 A Main Switch and Cabling work at NMY Puranpur (Distt. Pilibhit)02-Jul-2018 09:00 AM268.16
31SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223396_1610Dismantling, Repairing, Tightening of Existing L. T. LineS/F 60 Nos 110-130 Watt LED Street Light FittingsS/I of 15 HP Submersible Pumping Plant 01 no., Coloum Pipe, Starter Panel, Cable and Internal Electrification in Pump House at NMY Pilibhit02-Jul-2018 09:00 AM267.95
32SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223602_1611S/F of 96 Nos 200 Watt LED Flood Light Fittings for 4 Nos 30M Height High Mast, Replacement of Damage Control Cable, Wire Rope, of High Mast, S/F of L. T. Panel Board at NMY Pilibhit (Disst. Pilibhit)02-Jul-2018 09:00 AM341.87
33SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223603_1612Supply/Installation of 3 No. 16 mt. High Mast with 200 watt LED Light Fittings and Cabiling, Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board, Cabling work at NMY Moradabad (Distt. Moradabad)02-Jul-2018 09:00 AM306.24
34SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223604_1613Dismantling, Repairing, Tightening of Existing L. T. Line, S/F of 78 Nos 110-130 Watt LED Street Light FittingsS/L of Cable for Pump House, S/I/ of 03 Nos 150 Ltr. Capacity Water Coolar03 Nos R. O. Plant, 4 KVA Steplizer at NMY Amroha (Distt. Amroha)02-Jul-2018 09:00 AM356.64
35SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223607_1614Repairing, Tightening, Dismantling of Existing L. T. Line,S/F of 110Watt to 130Watt LED Light Fitting 70 Nos, S/F of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos R. O. Plant,4 KVA SteplizerWater Coolar Cage, at NMY Rampur (Distt. Rampur)02-Jul-2018 09:00 AM342.16
36SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223608_1615Supply / Installation / Commissining / Testing of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings, Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board and Cabling work at NMY Rampur (Distt. Rampur)02-Jul-2018 09:00 AM273.86
37SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223613_1616Repairing of 02 No. 30mt. Highmasts and Replacement of 400 watt Sodium Flood Lights by 200 watt L.E.D. Flood Lights,S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos R. O. Plantat N. M. Y. Chandausi(Distt.Sambhal)02-Jul-2018 09:00 AM277.44
38SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223756_1617S/F of 110 to 130 watt L.E.D. Light fiting on Pole and Repairing of L.T. Line, Internal Electrification in Type I 3 No., type II 4 No., type III 5 No. By copper wire in existing Conduit and in APF at N.M.Y. Sambhal ( Distt. Sambhal)02-Jul-2018 09:00 AM250.00
39SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223757_1618S/F of 64 No 200 Watt LED Flood Light Fittings for 4 No. 30 M Height High Mast, Repairing of 1 No. high mast by using old Sodium flood lights, Replacement of Damaged Power Control Cableof high mast Light at NMY Shahjahanpur (Distt. shahjahanpur)02-Jul-2018 09:00 AM269.88
40SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223758_1619S/F 60 Nos 110-130 Watt LED Street Light Fittings, Replacement of 13 No. damaged poles at NMY Shahjahanpur (Distt. Shahjahanpur)02-Jul-2018 09:00 AM250.00
41SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223760_1620S/F of 72 Nos 200Watt LED Flood Light Fittings for 3 Nos 30M Height High Mast(for 1 Nos Hight Mast 16 Nos 200 W LED Flood Light Fitting) Replacement of Damage Power Control Cable, Wire Rope of 1 No. High Mast Light at NMY Puwayan (Distt Shahjahanpur)02-Jul-2018 09:00 AM250.00
42SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223762_1621Distribution system arrangement for LTline replacement of damaged poles TPNChange overswitch street light cable and street lighting by 110-130Watt LED Lights at NMY Badaun.02-Jul-2018 09:00 AM250.00
43SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223804_1622S/F/I/C of 15 K.V.A. DG set, 16 mt. High Mast Supply and fixing of 110 watt to 130 watt L.E.D. street light and Repairing of L.T. Line at N.M.Y. Saheswan (Badaun)02-Jul-2018 09:30 AM250.00
44SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223805_1623Repairing of L.T. line, replacement of damaged poles, S/F of 30 No. LED lights 110 to 130 watt.Internal wiring with Copper wire in existing concealed steel conduit in Quarter at NMY Bisauli (Distt. Badaun).02-Jul-2018 09:45 AM250.00
45SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223806_1624S/I/T/C of 2 No. 16 mt. High Mast System at NMY Bisouli(Distt. Badaun).02-Jul-2018 09:55 AM250.00
46SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223808_1625S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos RO Plant, 4 KVA Steplizer 5 Nos, Rewiring of Internal Electrification in Mandi Samiti Office and Inspection House, S/F of 22Watt LED TubeLight Fitting at NMY Moradabad (Distt.Moradabad)02-Jul-2018 10:10 AM250.00
47SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223810_1626Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 8 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 25 Nos 110-130 Watt LED Street Light Fittings, S/F of Distributtion Panel Board at NMY Dhanaura (Distt. Amroha)02-Jul-2018 10:20 AM250.00
48SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223811_1627S/I/C/T of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings,2 Nos 150 Ltr. Capacity Water Coolar, 02 Nos R. O. Plant, 4 KVA Steplizer, Construction of Water Coolar Cage 02 Nos at Dhanaura (Distt. Amroha)02-Jul-2018 10:30 AM250.00
49SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_223812_1628Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 8 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 20 Nos 110-130 Watt LED Street Light Fittings at NMY Hasanpur (Distt. Amroha)02-Jul-2018 10:45 AM250.00
50SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240634_1642Rewiring of Internal Electrification and Modular Switch in Kisan Vishram Girh and S/F of LED Tube Light in Dy. Director (Adm), Dy. Director (Cons.), Mandi Parishad at NMY Bareilly20-Aug-2018 09:00 AM250.00
51SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240637_1643S/F of 24 No 200 Watt LED Flood Light Fittings in 1 No. 30 M Height High Mast and replacement Damaged Trailing Power Control Cable and Painting of Pole at NMY Baheri (Distt. Bareilly) 20-Aug-2018 09:00 AM250.00
52SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240644_1644S/E of 01 No Over Head Type Retro Reflective High Intensity Sign Board on Main Gate and 01 No Cantilever Type Retro Reflective High Intensity Sign Board on Main Road at NMY Baheri (Distt. Bareilly)20-Aug-2018 09:00 AM250.00
53SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240652_1645S/I of 1 No. Over Head Structure Type Retro Reflective High Intensity Board on Main Gate and 01 No. Cantilever Type Retro Reflective High Intensity Board on Main Road at NMY Puranpur (Distt. Pilibhit)20-Aug-2018 09:00 AM250.00
54SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240661_1646S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height High Mast, Replacement of Damage, Cable Power Control Cable and Wire Rope of 1 Nos High Mast Light and LED Street Light Fittings at NMY Puranpur (Distt. Pilibhit)20-Aug-2018 09:00 AM254.77
55SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240671_1647Repair of Existing L.T.Line,Construction of New L.T.Distribution Line,S/F LED Street Light Fitting,Rewiring of Int. Electrification and S/F of LED Tube Light in Mandi Samiti Office, 100A Main Switch and Cabling work at NMY Puranpur(distt. Pilibhit)20-Aug-2018 09:00 AM268.16
56SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240757_1648Repairing of Existing L. T. LineS/F 60 Nos 110-130 Watt LED Street Light Fittings,S/I of 15 HP Submersible Pumping Plant 01 no.,Coloum Pipe, Starter Panel, Cable and Internal Electrification in Pump House at NMY Pilibhit (Distt. Pilibhit)20-Aug-2018 09:00 AM267.95
57SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240776_1649S/F of 96 Nos 200 Watt LED Flood Light Fittings for 4 Nos 30M Height High Mast, Replacement of Damage Power Control Cable of 1 Nos High Mast Light (Vegetable Market),S/F of L. T. Panel Board at NMY Pilibhit (Disst. Pilibhit)20-Aug-2018 09:00 AM341.87
58SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240787_1650S/F of 48 Nos 170 to 200 Watt LED Flood Light Fittings in 2 Nos 30M High Mast,Replacement of Damage Unnder ground Cable,Control Cable,Wire Rope, of High Mast No. 1 and S/F 20 Nos 110-130 Watt LED Street Light Fittings at NMY Beesalpur(Distt Pilibhit)20-Aug-2018 09:00 AM250.00
59SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240803_1651S/F of 64 No 200 Watt LED Flood Light Fittings for 4 No 30M High Mast Repairing of 1 No. highmast by old Sodium flood lights,Replacement of Damaged Power Control Cable, Wire Rope of 2 No. High Mast Light at NMY Shahjahanpur (Distt. Shahjahanpur)20-Aug-2018 09:00 AM269.88
60SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240816_1652S/F 60 Nos 110-130 Watt LED Street Light Fittings, Replacement of 13 No. damaged poles at NMY Shahjahanpur (Distt. Shahjahanpur)20-Aug-2018 09:00 AM250.00
61SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240829_1653S/F of 72 Nos 200 Watt LED Flood Light Fittings for 3 Nos 30M Height Hight MastReplacement of Damage Power Conteol Cable, Wire Rope of 1 No. High Mast Light at NMY Puwayan (Distt.Shahjahanpur)20-Aug-2018 09:00 AM250.00
62SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240840_1654S/E of 02 Nos Over Head Type Retro Reflective High Intensity Sign Board on Gates at NMY Puwayan (Distt. Shahjahanpur)20-Aug-2018 09:00 AM250.00
63SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_240847_1655S/F of 110 to 130 Watt LED Light replacement of damage Street light cable at NMY Puwayan (Distt.Shahjahanpur)20-Aug-2018 09:00 AM250.00
64SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241028_1656 Repairing / Extension of L.T line with new Steel tubular pole S/F of LED Street Lamps on pole at N.M.Y. Tilhar ( Shahjahanpur )20-Aug-2018 09:00 AM250.00
65SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241030_1657Repairing of 2 Nos. 16 Mtrs High Mast Light,S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos, 4KVA stabilizer, Construction of water cooler cage, GI Pipe line connection and cabling work at N.M.Y. Tilhar ( Shahjahanpur ).20-Aug-2018 09:00 AM250.00
66SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241034_1658S/F/I/C of 15 K.V.A. DG set, 16 mt. High Mast Supply and fixing of 110 watt to 130 watt L.E.D. street light and Repairing of L.T. Line at N.M.Y. Saheswan (Badaun)20-Aug-2018 09:00 AM250.00
67SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241036_1659Repairing of L.T. line, replacement of damaged poles, S/F of 30 No. LED lights 110 to 130 watt.Internal wiring with Copper wire in existing concealed steel conduit in Quarter at NMY Bisouli (Distt. Badaun).20-Aug-2018 09:00 AM250.00
68SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241037_1660S/I/T/C of 2 No. 16 mt. High Mast System at NMY Bisouli(Distt. Badaun).20-Aug-2018 09:00 AM250.00
69SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241038_1661Repairing of L.T. line, and replacement of damaged Cabls,TPN, change over switches S/F of L.E.D lights 110 to 130w on poles. at N.M.Y. Wazirganj (Badaun).20-Aug-2018 09:00 AM250.00
70SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241039_1662Repairing of L.T. line, and replacement of damaged Cabls, Poles TPN, change over switches S/F of 30 no L.E.D lights 110 to 135w on poles.at N.M.Y. Dataganj (Badaun).20-Aug-2018 09:00 AM250.00
71SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241041_1663S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water Coolar,05 Nos R. O. Plant, 4 KVA Steplizer Rewiring of Internal Electrification in Mandi Samiti Office and Inspection House, S/F of 22 Watt LED Tube Light Fitting at N M Y. Moradabad (Distt. Moradabad)20-Aug-2018 09:00 AM250.00
72SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241042_1664S/I of 3 No. 16 mt. High Mast with 200 watt LED Light Fittings and Cabiling, Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board, Cabling work at NMY Moradabad (Distt. Moradabad)20-Aug-2018 09:00 AM306.24
73SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241044_1665Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 8 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 25 Nos 110-130 Watt LED Street Light Fittings, S/F of Distributtion Panel Board at NMY Dhanaura (Distt. Amroha)20-Aug-2018 09:00 AM250.00
74SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241085_1666S/I/C/T of 2 No. 16mt. High Mast System with 200watt LED Light Fittings,02 Nos 150 Ltr. Capacity Water Coolar,02 Nos R.O. Plant,4 KVA Steplizer,Construction of Water Coolar Cage G.I.Pipe Line Connection and Cabling work at Dhanaura(Distt Dhanaura)20-Aug-2018 09:00 AM250.00
75SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241092_1667Repairing of LT line, S/F of 20 Nos 110-130 Watt LED Street Light Fittings at NMY Hasanpur and repairing of LT line S/F of 15 Nos 110-130 Watt LED Street Light Fittings at SMY Gajraula-Hasanpur (Distt. Amroha)20-Aug-2018 09:00 AM250.00
76SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241096_1668repairing of LT lineS/F of 78 Nos 110-130 Watt LED Street Light Fittings, Distributtion Panel Board,S/L of Cable for Pump HouseS/I/ of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant,at NMY Amroha (Distt. Amroha)20-Aug-2018 09:00 AM356.64
77SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241100_1669Internal Electrification and S/F of LED Tube Light in Toilet Block 01 No. at NMY Rampur (Distt. Rampur)20-Aug-2018 09:00 AM250.00
78SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241149_1670Internal Electrification in Type I 3 No., type II 4 No., type III 5 No. By copper wire in existing Conduit with Moduler Switch, Internal Electrification with copper wire in APF 3no. at N.M.Y. Sambhal ( Distt. Sambhal)20-Aug-2018 09:00 AM250.00
79SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241153_1671S/F of 110 to 130 watt L.E.D. Light fiting on Pole and Repairing of L.T. Line,Internal Electrification in Type I 3 No., type II 4 No., type III 5 No. , APF 3no. with Copper wire at N.M.Y. Sambhal ( Distt. Sambhal)20-Aug-2018 09:00 AM250.00
80SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_241157_1672Repairing of 02 No. 30mt. Highmasts,Replacement of 400 watt Sodium Flood Lights by 200 watt L.E.D. Flood Lights, S/I/C/Testing of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos R. O. Plant,at N. M. Y. Chandausi(Distt.Sambhal)20-Aug-2018 09:00 AM277.44
81SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_270994_1673Rewiring of Internal Electrification and Modular Switch in Kisan Vishram Girh,Rewiring of Internal Electrification and S/F of LED Tube Light in Dy. Director (Adm), Dy. Director (Cons.), Mandi Parishad at NMY Bareilly05-Nov-2018 05:45 PM250.00
82SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_271021_1674S/F of 24 No 200 Watt LED Flood Light Fittings in 1 No. 30 M Height High Mast and replacement Damaged Trailing Power Control Cable and Painting of Pole at NMY Baheri (Distt. Bareilly) 05-Nov-2018 05:45 PM250.00
83SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_271038_1675Repairing of L.T. line, and replacement of damaged Cabls, Poles TPN, change over switches S/F of 30 no L.E.D lights 110 to 135w on poles.at N.M.Y. Dataganj (Badaun).05-Nov-2018 05:45 PM250.00
84SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_271045_1676 Internal Electrification in Type I 3 No., type II 4 No., type III 5 No. By copper wire in existing Conduit with Moduler Switch, Internal Electrification with copper wire in APF 3no. at N.M.Y. Sambhal ( Distt. Sambhal)05-Nov-2018 05:55 PM250.00
85SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_285820_1677Internal Electrification and S/F of LED Tube Light in Toilet Block 02 No. at NMY Shahjahanpur (Distt. Shahjahanpur)21-Dec-2018 09:45 AM250.00
86SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_285822_1678Internal Electrification and S/F of LED Tube Light in Toilet Block 01 No. at NMY Puranpur (Distt. Pilibhit)21-Dec-2018 10:00 AM250.00
87SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_285823_1679Internal Electrification and S/F of LED Tube Light in Toilet Block 01 No. at NMY Beesalpur (Distt. Pilibhit)21-Dec-2018 10:15 AM250.00
88SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_285824_1680Internal Electrification in S.M.I Office and generator room at NMY Badaun (Distt.Badaun)21-Dec-2018 10:25 AM250.00
89SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_285826_1681Distribution system arrangement for LTline replacement of damaged poles TPNChange overswitch street light cable and street lighting by 110-130Watt LED Lights at NMY Badaun.21-Dec-2018 10:40 AM250.00
90SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_285831_1682Internal Electrification and S/F of LED Tube Light in Toilet Block 01 No. at NMY Chandausi (Distt. Sambhal)21-Dec-2018 10:50 AM250.00
91SE Zone-2||Dy Director Construction(E-M), Bareilly2018_RKUMP_285838_1683Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 5 No. Damage Steel Tubular Pole, Painting of Pole, S/F of 20 Nos 110-130 Watt LED Street Light Fittings at NMY Babrala (Distt. Sambhal)21-Dec-2018 11:05 AM250.00
92SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297024_1684S/F of LED light, sifting of L.T. line, due to Road Widening and Distribution of Circuits at NMY Ujhani(Badaun)21-Jan-2019 09:00 AM287.08
93SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297028_1685Repairing of 02 No. 30mt. Highmasts and Replacement of 400 watt Sodium Flood Lights by 200 watt L.E.D. Flood Lights. S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos and related work at N.M.Y. Ujhani (Distt. Badaun)21-Jan-2019 09:00 AM250.00
94SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297034_1686S/F of 110 to 130 W.L.E.D street light on poles and Repairing of L.T Line,by replacement of damaged poles, cable and all un service able, A.C.S.R. conductor. G.I. wire at N.M.Y. jalalabad(shajhanpur)21-Jan-2019 09:00 AM250.00
95SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297072_2687S/I/T/C of 2 No. 16 mt. High Mast System at NMY jalalabad(shajhanpur)21-Jan-2019 09:00 AM250.00
96SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297088_1688Internal Electrification in 4 No (12x88) APF and 2No (9x40) APF.N.M.Y. jalalabad(shajhanpur)21-Jan-2019 09:00 AM250.00
97SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297094_1689S/F of 02 No. 150 Ltr. Capacity Water Coolar, 02 Nos R. O. Plant, 4 KVA Steplizer, 02 Nos Construction of Water Coolar Cage, G. I. Pipe Line Connection and at NMY Bahedi (Distt. Bareilly)21-Jan-2019 09:00 AM250.00
98SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297139_1690Repairing of existing LT line, S/I/C/testing of 2 no. 150ltr water cooler, 2no. RO plant and related work. Repairing of 250 KVA Aluminium winding transformer at NMY Bilaspur (Distt. Rampur)21-Jan-2019 09:00 AM250.00
99SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297145_1691Cost of S/F of 32 No. 200 Watt LED Flood Light Fittings in 16 Meter Height High Mast 04 No. Replacement of Damage Undergroun Cable of 1 No. High Mast at NMY Bilspur (Distt. Rampur) 21-Jan-2019 09:00 AM250.00
100SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297149_2692Repairing of existing LT line. S/I/C/T of 2no. water cooler, 2no. RO plant and related work. S/F of 1no. 15HP submerssible pump set with Control Panel Board at N. M. Y. Bahjoi (Distt. Sambhal)21-Jan-2019 09:00 AM250.00
101SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297158_1693Supply/ Installation/ Commissining/ Testing of 2 No. 16 mt. High Mast System with LED Light Fittings and Cabiling work at Bahjoi (Distt. Sambhal21-Jan-2019 09:00 AM250.00
102SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297165_1694Repairing of existing LT line and S/F of LED street light fittings. S/I/C/T of 1no. water cooler, 1no. RO plant and related work.S/F of 15 HP Submerssible Pump set with Control Panel Board at N. M. Y. Najibabad ( Bijnor )21-Jan-2019 09:00 AM250.00
103SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297169_2695S/I/C/T of 2 No. 16 mt. High Mast System with 245 watt LED Light Fittings and Cabiling work. Supply and Installation of 25 KVA Diesel Generator Set 1 No, Panel Board, Cabling work at NMY at NMY Najibabad ( Bijnor )21-Jan-2019 09:00 AM250.00
104SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297174_1696Repairing and Tightening of Existing L. T. Line, , S/F of Main Switch, 110 Watt to 130 Watt LED Light Fitting 13 Nos, Rewiring of Internal Electrification in Mandi Samiti Office and Staff Quarter Type 1st 01 No. at NMY Haldaur (Dist Bijnaur)21-Jan-2019 09:00 AM250.00
105SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_297175_2697Internal Electrification in Toilet block-1 No. at NMY Chandpur.21-Jan-2019 09:00 AM250.00
106SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309134_1706Replacement of damage 07 No. Steel Tubular Pole, S/F 110 Watt to 130 Watt LED Light Fitting 50 Nos, and Painting of Pole at Navin Grain Mandi Yard, Bareilly (Distt. Bareilly)14-Feb-2019 02:30 PM250.00
107SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309247_2707Rewiring of Internal Electrification in 4 Suit Inspection House, S/F of 1.8 Ton Split Air Conditionor 2 No. and LED Television 02 No. and S/L of cable for Krishi Vigyan Kendra at Grain Mandi, Bareilly14-Feb-2019 04:40 PM250.00
108SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309342_1708S/F of 170 To 200 Watt LED Flood Light in 4 No. 16 Meter High Mast, Replacement of existing damage underground Cable at F and V Mandi, Bareilly 14-Feb-2019 05:00 PM250.00
109SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309361_1710S/F of 02 No. 150 Ltr. Capacity Water Coolar, 02 Nos R. O. Plant, 4 KVA Steplizer, 02 Nos Construction of Water Coolar Cage, G. I. Pipe Line Connection and at NMY Bahedi (Distt. Bareilly)14-Feb-2019 05:10 PM250.00
110SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309371_1711Dismantling, Repairing, Tightening of Existing L. T. Line, Painting of Pole, S/F of 25 Nos 110-130 Watt LED Street Light Fittings at SMY Richcha-Bahedi (Distt. Bareilly)14-Feb-2019 05:30 PM250.00
111SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309398_1709S/F of 15 No. 110 to 130 watt LED Street Light and Painting of Pole in Sub Mandi Yard Nawabganj and S/F of 15 No. 110 to 130 watt LED Street Light, Main Switch, Painting of Pole at Sub Mandi Yard Nariyawal 14-Feb-2019 06:00 PM250.00
112SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309421_1712Rewiring of Internal Electrification and Modular Switch in A Type Shops 06 No, B Type Shops 30 No. and C Type Shops 14 No., Kisan Vishram Girh and Canteen 01 No, at SMY Richcha-Bahedi (Distt. Bareilly)14-Feb-2019 06:15 PM250.00
113SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309432_1713S/E of 01 No Cantilever Type Retro Reflective High Intensity Sign Board on Main Road at SMY Richcha-Bahedi (Distt. Bareilly)14-Feb-2019 06:30 PM250.00
114SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309446_1714S/E of 01 No Over Head Type and one No. Cantilever Type Retro Reflective High Intensity Sign Board at NMY Tilhar (Distt. Shahjahanpur) 14-Feb-2019 06:45 PM250.00
115SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309456_1715Internal Electrification in 30 No super market shop at N.M.Y Bilsi (Badaun) 14-Feb-2019 06:55 PM250.00
116SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309466_1716Internal Electrification in A Type Shops 12 No. A Type Shops 01 No, Auction PlateForm (12x88M) 04 No and Auction PlateForm (12x60M) 02 No. at NMY Ujhani (Distt. Badaun)15-Feb-2019 09:00 AM250.00
117SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309479_1717S/I/C/Testing of 02 Nos 150 Ltr. Capacity Water Coolar, 4 KVA Steplizer, Servicing of existing 25 KVA diesel Genarator Set, S/F of 110 Watt to 130 Watt LED Light Fitting 15 Nos and Painting of Pole at N. M. Y Milak (Distt. Rampur)15-Feb-2019 09:00 AM250.00
118SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309482_2718Dismantling, Repairing, Tightening of Existing L. T. Line, Replacement of 18 Nos Damage Steel Pole, Painting of Pole, S/F 25 Nos 110-130 Watt LED Street Light Fittings, 100A Main Switch and Cabling work at NMY Tanda (Rampur)15-Feb-2019 09:00 AM250.00
119SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309502_1719Supply/ Installation/ Commissining/ Testing of 2 No. 16 mt. High Mast System with LED Light Fittings and Cabiling work at Bahjoi (Distt. Sambhal)15-Feb-2019 09:00 AM250.00
120SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309508_1720Repairing and Tightening of Existing L. T. Line, S/F of 110 Watt to 130 Watt LED Light Fitting 33 Nos, Painting of Pole. and Repairing/Overhauling of existing 62.5 KVA diesel Genarator Set at NMY Chandpur (Distt. Bijnaur)15-Feb-2019 09:00 AM250.00
121SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309512_1721Internal Electrification in C type shops- 05 nos at N.M.Y. Kiratpur ( Distt. Bijnor)15-Feb-2019 09:00 AM250.00
122SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309612_1722S/F of 110 to 130 W.L.E.D street light on poles and Repairing of L.T Line,by replacement of damaged poles, cable and all un service able, A.C.S.R. conductor. G.I. wire at N.M.Y. jalalabad(shajhanpur)15-Feb-2019 11:45 AM250.00
123SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_309666_1723Repairing of Existing L. T. Line, S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar, S/F of 15 HP Submerssible Pump set with Control Panel Board at N. M. Y. Najibabad ( Bijnor )15-Feb-2019 12:00 PM250.00
124SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_313048_1724Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Baheri19-Feb-2019 11:00 AM382.32
125SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_313059_1725Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Rampur19-Feb-2019 11:05 AM382.32
126SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_313074_1726Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bilaspur19-Feb-2019 11:25 AM382.32
127SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_313182_1727Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bahjoi19-Feb-2019 12:40 PM382.32
128SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_313213_1728Comprehensive Maintenance and operation of 1 No. 50M.T. Weigh Bridge three years at NMY Sambhal19-Feb-2019 12:50 PM250.00
129SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_313236_1729Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Amroha19-Feb-2019 01:10 PM382.32
130SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_313341_1730Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Najibabad19-Feb-2019 02:10 PM382.32
131SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_313368_1731Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Kiratpur19-Feb-2019 02:25 PM250.00
132SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327374_1733Repairing of L.T. line and replacement of damaged Cables, Poles TPN, change over switches etc., S/F of 20 no. 110 to 135 watt L.E.D lights on poles at S.M.Y. Banda (Puwayan).01-Mar-2019 09:00 AM250.00
133SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327377_1734Repairing of 2 no. high mast lights and replacement of 400 watt sodium Flood Light on it by 200 watt LED Lights at S.M.Y. Banda (Puwayan).01-Mar-2019 09:00 AM250.00
134SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327378_1735S/E of 1 No. Over Head Retro Reflective High Intensity Sign Board on Gate at S.M.Y. Banda (Puwayan) (Distt. Shahjahanpur)01-Mar-2019 09:00 AM250.00
135SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327379_1736Construction of tubewell size (300mmx200mm) AND S/F of 7.5 H.P Submeresible Pump at N.M.Y. Wazirganj (Badaun)01-Mar-2019 09:00 AM250.00
136SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327380_1737Internal Electrification in 05 No B type shops and 1 No pump House at NMY Wazirganj (Badaun) 01-Mar-2019 09:00 AM250.00
137SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327381_1738Dismantling, Repairing, Tightening of Existing L. T. Line, Painting of Pole, S/F of 20 Nos 110-130 Watt LED Street Light Fittings Repairing of Submerssible Pump at SMY Thakurdwara Under Mandi Samiti Moradabad (Distt. Moradabad)01-Mar-2019 09:00 AM250.00
138SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327387_1739Construction of L. T. Line, Painting of Pole, S/F of 10 Nos 110-130 Watt LED Street Light Fittings, Main Switch at SMY Kanth Under Mandi Samiti Moradabad (Distt. Moradabad) 01-Mar-2019 09:00 AM250.00
139SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327388_1740Dismantling, Repairing, Tightening of Existing L. T. Line, S/F of 15 Nos 110-130 Watt LED Street Light Fittings and S/I/C/Testing of 02 Nos 150 Ltr. Capacity Water Coolar at NMY Kiratpur (Distt. Bijnaur)01-Mar-2019 09:00 AM250.00
140SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327389_1741S/F of 7.5 HP Submerssible Pump set with Control Panel Board,S/I/C/Testing of 02 Nos 150 Ltr. Capacity Water Coolerat N. M. Y. Babrala (Distt. Sambhal)01-Mar-2019 09:00 AM250.00
141SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327439_1742Internal Electrification in C type shop-15 no., 100 MT Godown-2 no. and 12x32 APF - 1 No at N.M.Y. Najibabad ( Distt. Bijnor)01-Mar-2019 09:15 AM250.00
142SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_327367_1732S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer 04 Nos Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at NMY Pilibhit (Distt. Pilibhit)01-Mar-2019 11:00 AM250.00
143SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_334423_1743Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Baheri08-Mar-2019 10:45 AM382.32
144SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_334432_1744Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Rampur08-Mar-2019 11:00 AM382.32
145SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_334457_1745Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bilaspur08-Mar-2019 11:15 AM382.32
146SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_334471_1746Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bahjoi08-Mar-2019 11:30 AM382.32
147SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_334488_1747Comprehensive Maintenance and operation of 1 No. 50M.T. Weigh Bridge three years at NMY Sambhal08-Mar-2019 11:50 AM250.00
148SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_334505_1748Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Amroha08-Mar-2019 12:00 PM382.32
149SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_334519_1749Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Najibabad08-Mar-2019 12:15 PM382.32
150SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_334535_1750Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Kiratpur08-Mar-2019 12:25 PM250.00
151SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_335036_2751S/F of 110 to 130 W.L.E.D street light on poles and Repairing of L.T Line,by replacement of damaged poles, cable and all un service able, A.C.S.R. conductor. G.I. wire at N.M.Y. jalalabad(shajhanpur)08-Mar-2019 05:45 PM250.00
152SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_335092_1752S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer 04 Nos Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at NMY Pilibhit (Distt. Pilibhit)08-Mar-2019 06:00 PM250.00
153SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_335123_1753S/E of 01 No Cantilever Type Retro Reflective High Intensity Sign Board on Main Road at SMY Richcha-Bahedi (Distt. Bareilly)08-Mar-2019 06:20 PM250.00
154SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_335143_1754S/E of 01 No Over Head Type and one No. Cantilever Type Retro Reflective High Intensity Sign Board at NMY Tilhar (Distt. Shahjahanpur) 08-Mar-2019 06:30 PM250.00
155SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_335163_1755Internal Electrification in C Type Shops 03 and 01 No. pump House at N.M.Y Shaswan (Badaun) 08-Mar-2019 06:50 PM250.00
156SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_335187_1756S/F of 7.5 HP Submerssible Pump set with Control Panel Board, S/I/C/Testing of 02 Nos 150 Ltr. Capacity Water Coolar at N. M. Y. Babrala (Distt. Sambhal)09-Mar-2019 09:00 AM250.00
157SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_335203_1757Internal Electrification in A type shops-2 no, B type shops-2 no.,C type shops- 30 no C type and super mkt shops-12 nos at N.M.Y. Hasanpur ( Distt. Amroha)09-Mar-2019 09:00 AM250.00
158SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_351141_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Baheri05-Jun-2019 12:20 PM382.32
159SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_351145_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Rampur05-Jun-2019 12:35 PM382.32
160SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_351152_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bilaspur05-Jun-2019 12:45 PM382.32
161SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_351249_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bahjoi06-Jun-2019 09:00 AM382.32
162SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_351251_1Comprehensive Maintenance and operation of 1 No. 50M.T. Weigh Bridge three years at NMY Sambhal06-Jun-2019 09:00 AM250.00
163SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_351253_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Amroha06-Jun-2019 09:00 AM382.32
164SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_351254_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Najibabad06-Jun-2019 09:00 AM382.32
165SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_351256_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Kiratpur06-Jun-2019 09:00 AM250.00
166SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_355791_1S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer 04 Nos Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at NMY Pilibhit (Distt. Pilibhit)19-Jun-2019 09:00 AM250.00
167SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_355801_1S/F of 110 to 130 W.L.E.D street light on poles and Repairing of L.T Line,by replacement of damaged poles, cable and all un service able, A.C.S.R. conductor. G.I. wire at N.M.Y. jalalabad(shajhanpur)19-Jun-2019 09:20 AM250.00
168SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_355803_1S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer 04 Nos Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at NMY Jalalabad (Distt. Shahjahanpur)19-Jun-2019 09:30 AM250.00
169SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_355804_1Internal Electrification in C Type Shops 03 and 01 No. pump House at N.M.Y Shaswan (Badaun)19-Jun-2019 09:45 AM250.00
170SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_355806_1S/F of 7.5 HP Submerssible Pump set with Control Panel Board, S/I/C/Testing of 02 Nos 150 Ltr. Capacity Water Coolar, 02 Nos R. O. Plant, 4 KVA Steplizer, Construction of Water Coolar Cage 02 No, and Cabling work at N.M.Y. Babrala (Distt. Sambhal)19-Jun-2019 10:05 AM250.00
171SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_355808_1Internal Electrification in A type shops-2 no, B type shops-2 no.,C type shops- 30 no C type and super mkt shops-12 nos at N.M.Y. Hasanpur ( Distt. Amroha)19-Jun-2019 11:25 AM250.00
172SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_359511_2S/F of 110 to 130 W.L.E.D street light on poles and Repairing of L.T Line,by replacement of damaged poles, cable and all un service able, A.C.S.R. conductor. G.I. wire at N.M.Y. jalalabad(shajhanpur)02-Jul-2019 09:30 AM250.00
173SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_359815_1Internal Electrification in 100 MT Godowns 6 No. at N-M-Y Ujhani (Badaun)02-Jul-2019 09:45 AM250.00
174SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_359817_1CONSTRUCTION OF 6 No BORING 110 MM DIA , S/F OF 1.5 H.P at NMY Moradabad02-Jul-2019 09:55 AM250.00
175SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_365537_1Supply/ Erection/ Commissioning and Testing of 3840mmX2560mm size Ticker board complete with cable at NMY Shahjahanpur (Shahjahanpur)20-Jul-2019 11:25 AM266.50
176SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_365542_1Supply/ Erection/ Commissioning and Testing of 3840mmX2560mm Ticker board complete with cable at NMY Puranpur (Pilibhit)20-Jul-2019 11:30 AM266.50
177SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_365568_1Supply/ Erection/ Commissioning and Testing of 3840mmX2560mm Ticker board complete with cable at NMY Chandausi (Sambhal)20-Jul-2019 12:10 PM266.50
178SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_389271_1Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Shahjahanpur (Shahjahanpur)05-Oct-2019 09:45 AM264.02
179SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_389281_1Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Puranpur (Pilibhit)05-Oct-2019 09:55 AM264.02
180SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_389284_3Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Chandausi (Sambhal)05-Oct-2019 10:30 AM264.02
181SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_392179_1S/I/TC of 1 No. 16 mt. High Mast System with 170 to 200 watt LED Light Fittings and Cabiling work, S/I of 15 KVA Diesel Generator Set 1 No, Panel Board, S/F of Distribution Panel Board, Main Switch and Cabling work at NMY Aonla (Distt. Bareilly)15-Oct-2019 09:45 AM250.00
182SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_392192_1Internal electrification in A-type shops 5 no. at NMY chandpur( Bijnaur)15-Oct-2019 11:20 AM250.00
183SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_403349_1Int. Elec. work of Mandi Samiti office, Repairing LT Line, S/F of 7.5HP Submerssible Pump set with Control Panel, S/F of 26 Nos LED Street Light, S/I/T/C of 2No. 16m Mast System and 4No. 150Ltr. Capacity Water Cooler set at NMY SHAHABAD (Rampur)14-Nov-2019 09:00 AM295.35
184SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_403366_1S/E of 01 No. Over Head Type and one No. Cantilever type Retro Reflective High Intensity Sign Board at NMY Shahabad ( Rampur)14-Nov-2019 09:00 AM250.00
185SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_403413_1Internal Electrification by Copper wire, Modular Switch in 2 No. C-type shops at N.M.Y. Tanda ( Distt. Rampur) .14-Nov-2019 09:00 AM250.00
186SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_403424_1Supply/Erection/Commissioning and Testing of 3840mmX2880MM size Ticker board complete with cable at NMY Shahjahanpur (Shahjahanpur)14-Nov-2019 06:00 PM264.02
187SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_403728_1Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Puranpur (Pilibhit)15-Nov-2019 09:00 AM264.02
188SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_403749_1Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Chandausi (Sambhal)15-Nov-2019 09:00 AM264.02
189SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_408682_1Wiring of internal electrification in 20 nos. C type shops at NMY Pilibhit.29-Nov-2019 09:00 AM250.00
190SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_408695_1Rewiring of Internal Electrification by Copper wire, Modular Switch and S/F of LED Tube Light in Mandi Samiti Office and S/I/C/T of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings and Cabiling work at NMY Rampur29-Nov-2019 09:00 AM250.00
191SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_408697_1S/E of 01 No. Over Head Type and one No. Cantilever type Retro Reflective High Intensity Sign Board at NMY Rampur ( Rampur)29-Nov-2019 09:00 AM250.00
192SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_408698_1S/I/T/C of 2 No. 16 mt. High Mast Light System and Cabiling work and 02 Nos 150 Ltr. Capacity Water Coolar, 02 Nos R. O. Plant at N.M.Y. Hasanpur (Amroha) and S/I/C/T of 01 Nos 150 Ltr. Capacity Water Coolar, 01 Nos RO plant at SMY Gajraula29-Nov-2019 09:00 AM250.00
193SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_408701_1S/I/C/T of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings, Supply and Installation of Panel Board, LED street light and Cabiling work at NMY Babrala (Distt. Sambhal)29-Nov-2019 09:00 AM250.00
194SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_408703_1S/I/C/T of 05 Nos 150 Ltr. Capacity Water Coolar, 05 Nos R. O. Plant and S/I/C/T of 3 No. 16 mt. High Mast System with 200 watt LED Light Fittings on High masts at N.M.Y. Sambhal (Sambhal)29-Nov-2019 09:00 AM302.89
195SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_408705_1Construction of Tubewell size 300x200 mm by D.C. Rig m/c and S/I of 7.5 H.P. Pumping Plant at New T/Well at N.M.Y. Sambhal (sambhal)29-Nov-2019 09:00 AM250.00
196SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_408706_1Rewiring of Internal Electrification by Copper wire, Modular Switch and S/F of LED Tube Light in Mandi Samiti Office and 1 No. check post at N.M.Y. Chandausi ( Distt. Sambhal) .29-Nov-2019 09:00 AM250.00
197SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_413087_1Supply/Erection/Commissioning and Testing of 3840mmX2880MM size Ticker board complete with cable at NMY Shahjahanpur (Shahjahanpur)14-Dec-2019 09:00 AM264.02
198SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_413494_1Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Puranpur (Pilibhit)14-Dec-2019 09:00 AM264.02
199SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_413495_1Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Chandausi (Sambhal)14-Dec-2019 09:00 AM264.02
200SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_413784_1S/I/C/T of 05 Nos 150Ltr. Capacity Water Coolar, 05Nos R.O. Plant and related work, S/I/C/T of 3No. 16m High Mast System with 200W LED Light Fittings on High masts and 20 no. 120W LED street light on poles with Cabiling work at NMY Sambhal16-Dec-2019 09:00 AM302.89
201SE Zone-2||Dy Director Construction(E-M), Bareilly2019_RKUMP_417695_1Construction of Tubewell size 300x200 mm by D.C. Rig m/c and S/I of 7.5 H.P. Pumping Plant at New TubeWell at N.M.Y. Sambhal (sambhal)30-Dec-2019 09:00 AM250.00
202SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_424969_1Internal Electrification work in Utility Block, Canteen, toilet block, Urinal block, driver rest room, garbage room and E-NAM office at NMY Puranpur17-Jan-2020 05:50 PM336.92
203SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_424986_1Internal Electrification work in Utility Block, canteen and E-NAM office at NMY Shahjahanpur17-Jan-2020 06:00 PM309.64
204SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_425000_1Construction of Tubewell and S/F of 01HP Submersible Pump,02 No and wiring at N.M.Y. Tilhar (Distt. Shahjahanpur).18-Jan-2020 09:00 AM250.00
205SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_425130_1Internal Electrification in B type shops 20 no, 200 MT godown 2 nos at N.M.Y. Bilaspur ( Distt. Rampur)18-Jan-2020 09:00 AM250.00
206SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_425132_1INTERNAL ELECTRIFICATION IN UTILITY BLOCK, CANTEEN WITH PARAG BOOTH, DRIVER REST ROOM, STORE ROOM, TOILET BLOCK, OLD TOILET BLOCK 2NO. , CHECK POST AND E-NAM BUILDING N.M.Y. CHANDAUSI(. SAMBHAL) .18-Jan-2020 09:00 AM335.00
207SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_425134_1Internal Electrification in C type shop-10 no., at N.M.Y. Babrala ( Distt. Sambhal) .18-Jan-2020 09:00 AM250.00
208SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_428631_1Reparinig of 01 No 16 mt Hight mast replacement Diffective sodium flood light by 200 watt flood light Internal Electrification in APF 01 No (9x40) and making Distrbution System at N.M.Y Wazirganj (Badaun)28-Jan-2020 09:00 AM250.00
209SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_428632_1S/E of 1 No. Over Head Retro Reflective High Intensity Sign Board on Gate at N.M.Y. Wazirganj (Badaun)28-Jan-2020 04:30 PM250.00
210SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_428900_1Repairing of 01 No. 30 mt. High masts and 16 mt 02 No High masts s/f OF 200 watt L.E.D. Flood Lights, Replacement of damage cables. And cableling work office to gust House, generator room to pump House at N.M.Y. Badaun (Distt. Badaun)28-Jan-2020 05:45 PM250.00
211SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_436339_1Repairing of LT line and replacement of 05no. Damaged steel tubular pole and internal electrification in 02no. toilet block at NMY Baheri (Distt. Bareilly)18-Feb-2020 09:00 AM250.00
212SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_436343_1Supply/Erection/Commissioning and Testing of 3840mmX2880MM size Ticker board complete with cable at NMY Shahjahanpur (Shahjahanpur)18-Feb-2020 09:00 AM264.02
213SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_436348_1Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Puranpur (Pilibhit)18-Feb-2020 09:00 AM264.02
214SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_436352_1Supply/Erection/Commissioning and Testing of 3840mmX2880mm size Ticker board complete with cable at NMY Chandausi (Sambhal)18-Feb-2020 09:00 AM264.02
215SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_447619_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Fruit and Vegetable Market).17-Mar-2020 10:00 AM417.60
216SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_447634_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Grain Market).17-Mar-2020 10:00 AM417.60
217SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_448716_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Shahjahanpur.17-Mar-2020 10:00 AM417.60
218SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_448735_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puwayan.17-Mar-2020 10:00 AM417.60
219SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_448818_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Budaun.17-Mar-2020 10:00 AM417.60
220SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_448837_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Ujhani.17-Mar-2020 10:00 AM417.60
221SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_448853_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Pilibhit.17-Mar-2020 10:00 AM417.60
222SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_448865_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puranpur.17-Mar-2020 10:00 AM417.60
223SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_448885_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandpur.17-Mar-2020 10:00 AM417.60
224SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_448908_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandausi.17-Mar-2020 10:00 AM417.60
225SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_449141_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Aonla.17-Mar-2020 10:00 AM250.00
226SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_449158_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Tilhar.17-Mar-2020 10:00 AM250.00
227SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_449168_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Jalalabad.17-Mar-2020 10:00 AM250.00
228SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_449170_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Beesalpur.17-Mar-2020 10:00 AM250.00
229SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_449173_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Moradabad.17-Mar-2020 10:00 AM250.00
230SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_449177_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Shahbad.17-Mar-2020 10:00 AM250.00
231SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_449181_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Milak.17-Mar-2020 10:00 AM250.00
232SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_449185_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Dhanaura.17-Mar-2020 10:00 AM250.00
233SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_466816_1S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, Cabling work at NMY Aonla(Distt. Bareilly)07-May-2020 09:00 AM250.00
234SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_466826_1Rewiring of internal electrification in Mandi Samiti Office, Farmer Rest House and Sachiv Awas at NMY Beesalpur.07-May-2020 09:00 AM250.00
235SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_466836_1Internal Electrification in 05 No super market shop at N.M.Y Badaun (Badaun)07-May-2020 09:00 AM250.00
236SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_466849_1S/I/T/C of 1 No. 16 mt. High Mast System and L.T Disritbutison systm at NMY Dataganj (Distt. Badaun).07-May-2020 09:00 AM250.00
237SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_466854_1S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar,1 Nos R. O. Plant, 4 KVA Steplizer 01 Nos, Construction of Water Coolar Cage 01 Nos, G. I. Pipe Line Connection, Cabling work at NMY Dataganj(Distt. Budaun)07-May-2020 09:00 AM250.00
238SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_466865_1S/I/C/T of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, Cabling work and internal electrification in office buliding at NMY Sahswan (Budaun)07-May-2020 09:00 AM250.00
239SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_466875_1Internal Electrification in 14 No C- type shop and L.T line work at N.M.Y Bisouli (Badaun)07-May-2020 09:00 AM250.00
240SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_466885_1Supply/ Installation/ Commissining/ Testing of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings and Cabiling work and Construction of Boring 110 mm dia , S/F of 1.00 H.P submersible pump at NMY Milak (Rampur)07-May-2020 09:00 AM250.00
241SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_466892_1Replacing 400 watt S.V.Light by 200 watt LED flood light in 30 Mt. High masts, Cabling work and S/F 80 no. of LED lights and Internal Electrification in Toilet block-4 No. at N.M.Y. Bilaspur( Rampur )07-May-2020 09:00 AM250.00
242SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_466900_1Internal Electrification in New Pump Sambhal (Sambhal )07-May-2020 09:00 AM250.00
243SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_477328_1Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Shahjahanpur(Shahjahanpur)01-Jun-2020 09:00 AM250.00
244SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_477329_1Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Puranpur (Pilibhit)01-Jun-2020 09:00 AM250.00
245SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_477332_1Supply/ Erection/ Commissioning and Testing of 3840mmX2880mm Ticker board complete with cable at NMY Chandausi (Sambhal)01-Jun-2020 09:00 AM250.00
246SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478321_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Fruit and Vegetable Market).03-Jun-2020 09:00 AM353.90
247SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478331_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Grain Market).03-Jun-2020 09:00 AM353.90
248SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478335_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Shahjahanpur.03-Jun-2020 09:00 AM353.90
249SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478339_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puwayan.03-Jun-2020 09:00 AM353.90
250SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478340_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Budaun.03-Jun-2020 09:00 AM353.90
251SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478344_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Ujhani.03-Jun-2020 09:00 AM353.90
252SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478345_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Pilibhit.03-Jun-2020 09:00 AM353.90
253SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478349_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puranpur.03-Jun-2020 09:00 AM353.90
254SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478352_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandpur.03-Jun-2020 09:00 AM353.90
255SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478355_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandausi.03-Jun-2020 09:00 AM353.90
256SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478361_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Aonla.03-Jun-2020 09:00 AM250.00
257SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478362_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Tilhar.03-Jun-2020 09:00 AM250.00
258SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478364_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Jalalabad.03-Jun-2020 09:00 AM250.00
259SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478365_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Beesalpur.03-Jun-2020 09:00 AM250.00
260SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478366_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Moradabad.03-Jun-2020 09:00 AM250.00
261SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478367_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Shahbad.03-Jun-2020 09:00 AM250.00
262SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478368_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Milak.03-Jun-2020 09:00 AM250.00
263SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_478369_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Dhanaura.03-Jun-2020 09:00 AM250.00
264SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_490909_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Fruit and Vegetable Market).09-Jul-2020 09:00 AM353.90
265SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_490934_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Grain Market).09-Jul-2020 09:00 AM353.90
266SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_490944_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Shahjahanpur.09-Jul-2020 09:00 AM353.90
267SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_490954_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puwayan.09-Jul-2020 09:00 AM353.90
268SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_490962_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Budaun.09-Jul-2020 09:00 AM353.90
269SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_490993_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Ujhani.09-Jul-2020 09:00 AM353.90
270SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491003_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Pilibhit.09-Jul-2020 09:00 AM353.90
271SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491016_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puranpur.09-Jul-2020 09:00 AM353.90
272SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491026_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandpur.09-Jul-2020 09:00 AM353.90
273SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491032_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandausi.09-Jul-2020 09:00 AM353.90
274SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491041_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Aonla.09-Jul-2020 09:00 AM250.00
275SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491046_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Tilhar.09-Jul-2020 09:00 AM250.00
276SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491060_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Jalalabad.09-Jul-2020 09:00 AM250.00
277SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491067_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Beesalpur.09-Jul-2020 09:00 AM250.00
278SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491074_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Moradabad.09-Jul-2020 09:00 AM250.00
279SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491078_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Shahbad.09-Jul-2020 09:00 AM250.00
280SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491089_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Milak.09-Jul-2020 09:00 AM250.00
281SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_491093_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Dhanaura.09-Jul-2020 09:00 AM250.00
282SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_501402_1Repair of LT line and line shifting, S/F of main switch and LT panel at NMY Shahjahanpur.14-Aug-2020 09:00 AM250.00
283SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_501410_1Repairing of existing LT line, S/F of LED street lights, Repair of existing 30m hight high mast, S/F of LED flood light and Internal Electrification in Office and Toilet Block at NMY Bilsi14-Aug-2020 09:00 AM276.80
284SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_501419_1Rewiring of internal electrification in Inspection House, S/I of 02no. Split AC in inspection house and internal electrification in Farmer Rest House at NMY Puranpur.14-Aug-2020 09:00 AM250.00
285SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_501427_1Repairing of LT line and replacement of damaged steel tubular pole at NMY Beesalpur (Distt. Pilibhit)14-Aug-2020 09:00 AM250.00
286SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_501436_1Provision of cable for street light, S/F of 110 Watt to 130 Watt LED Light Fitting 30 Nos, Painting of existing poles at NMY Moradabad.14-Aug-2020 09:00 AM250.00
287SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_506116_1S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, Cabling work at NMY Aonla(Distt. Bareilly)29-Aug-2020 09:00 AM250.00
288SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_506128_1Rewiring of internal electrification in Mandi Samiti Office, Farmer Rest House and Sachiv Awas at NMY Beesalpur.29-Aug-2020 09:00 AM250.00
289SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_506137_1S/I/T/C of 1 No. 16 mt. High Mast System and L.T Disritbutison systm at NMY Dataganj (Distt. Badaun).29-Aug-2020 09:00 AM250.00
290SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_506151_1S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, Cabling work and internal electrification in office buliding at NMY Sahswan (BUDAUN)29-Aug-2020 09:00 AM250.00
291SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_506170_2Supply/ Installation/ Commissining/ Testing of 2 No. 16 mt. High Mast System with 200 watt LED Light Fittings and Cabiling work and Construction of Boring 110 mm dia , S/F of 1.00 H.P submersible pump at NMY Milak (Rampur)29-Aug-2020 09:00 AM250.00
292SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_506187_1Supply and Replacing 400 watt S.V.Light by 200 watt LED flood light in 30 Mt. High masts, Cabling work and S/F 80 no. of LED lights and Internal Electrification in Toilet block-4 No. at N.M.Y. Bilaspur( Rampur )29-Aug-2020 09:00 AM250.00
293SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_507344_1Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/T/C of 2.00KW off grid solar plant and S/I/T/C of Solar LED Street light in Nuranpur and Chandrapura (Mandi Samiti, Bisalpur).03-Sep-2020 09:00 AM250.00
294SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_507346_1S/F of LED street light and main switch at NMY Tilhar (Shahjahanpur)03-Sep-2020 09:00 AM250.00
295SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_507347_1Internal Electrification in 05 No super market shop at N.M.Y Badaun (Badaun)03-Sep-2020 09:00 AM250.00
296SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_507348_1S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar,1 Nos R. O. Plant, 4 KVA Steplizer 01 Nos, Construction of Water Coolar Cage 01 Nos, G. I. Pipe Line Connection, Cabling work at NMY Dataganj(Distt. Budaun)03-Sep-2020 09:00 AM250.00
297SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_507349_1Internal Electrification in 14 No C- type shop and L.T line work at N.M.Y Bisouli (Badaun)03-Sep-2020 09:00 AM250.00
298SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_507350_1S/I/T/C of 03 no. 16m high mast system and cabling work at NMY Bilsi (Budaun)03-Sep-2020 09:00 AM250.00
299SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_507351_1Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/T/C of 2.00KW off grid solar plant and S/I/T/C of Solar LED Street light in Godhi and Machariya (Mandi Samiti, Moradabad).03-Sep-2020 09:00 AM250.00
300SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_507352_1Internal Electrification in New Pump Sambhal (Sambhal )03-Sep-2020 09:00 AM250.00
301SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_507353_1Construction of 03 no. Mini boring and S/F OF 1.00 H.P submersible pump at NMY Sambhal ( Sambhal ).03-Sep-2020 09:00 AM250.00
302SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_507354_1Construction of 01 no. Mini boring and S/F of submersible pump set at SMY Gajraula( Amroha) and Construction of 02 no. Mini boring and S/F of submersible pump set at NMY Hasanpur (Amroha).03-Sep-2020 09:00 AM250.00
303SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_512188_1S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, Cabling work at NMY Aonla(Distt. Bareilly)17-Sep-2020 09:00 AM250.00
304SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_512199_1S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Cooler Cage 03 Nos, Pipe Line Connection, Cabling and internal electrification in office buliding at NMY Sahswan (Budaun)17-Sep-2020 09:00 AM250.00
305SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_514922_1S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, Cabling work at NMY Aonla(Distt. Bareilly)26-Sep-2020 09:00 AM250.00
306SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_514935_1S/I/C/Testing of 03 Nos 150 Ltr. Capacity Water Coolar, 03 Nos R. O. Plant, 4 KVA Steplizer 03 Nos, Construction of Water Coolar Cage 03 Nos, G. I. Pipe Line Connection, and internal electrification in office buliding at NMY Sahswan (Budaun)26-Sep-2020 09:00 AM250.00
307SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_520258_1S/F of LED street light and main switch at NMY Tilhar (Shahjahanpur)14-Oct-2020 09:00 AM250.00
308SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_520263_1Internal Electrification in 05 No super market shop at N.M.Y Badaun (Badaun)14-Oct-2020 09:00 AM250.00
309SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_520283_1S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar,1 Nos R. O. Plant, 4 KVA Steplizer 01 Nos, Construction of Water Coolar Cage 01 Nos, G. I. Pipe Line Connection, Cabling work at NMY Dataganj(Distt. Budaun)14-Oct-2020 09:00 AM250.00
310SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_520289_1Internal Electrification in 14 No C- type shop and L.T line work at N.M.Y Bisouli (Badaun)14-Oct-2020 09:00 AM250.00
311SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_520295_1Internal Electrification in New Pump Sambhal (Sambhal )14-Oct-2020 09:00 AM250.00
312SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_520313_1Construction of 03 no. Mini boring and S/F OF 1.00 H.P submersible pump at NMY Sambhal ( Sambhal ).14-Oct-2020 09:00 AM250.00
313SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531348_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Fruit and Vegetable Market).19-Nov-2020 09:00 AM353.90
314SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531354_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Bareilly (Grain Market).19-Nov-2020 09:00 AM353.90
315SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531359_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Shahjahanpur.19-Nov-2020 09:00 AM353.90
316SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531362_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puwayan.19-Nov-2020 09:00 AM353.90
317SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531365_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Budaun.19-Nov-2020 09:00 AM353.90
318SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531369_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Ujhani.19-Nov-2020 09:00 AM353.90
319SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531373_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Pilibhit.19-Nov-2020 09:00 AM353.90
320SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531376_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Puranpur.19-Nov-2020 09:00 AM353.90
321SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531380_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandpur.19-Nov-2020 09:00 AM353.90
322SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531393_1Comprehensive Maintenance and operation of 2 No. 50 M.T. Weigh Bridge for three years at NMY Chandausi.19-Nov-2020 09:00 AM353.90
323SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531401_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Aonla.19-Nov-2020 09:00 AM250.00
324SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531407_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Tilhar.19-Nov-2020 09:00 AM250.00
325SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531413_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Jalalabad.19-Nov-2020 09:00 AM250.00
326SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531421_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Beesalpur.19-Nov-2020 09:00 AM250.00
327SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531430_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Moradabad.19-Nov-2020 09:00 AM250.00
328SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531438_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Shahbad.19-Nov-2020 09:00 AM250.00
329SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531442_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Milak.19-Nov-2020 09:00 AM250.00
330SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_531446_1Comprehensive Maintenance and operation of 1 No. 50 M.T. Weigh Bridge for three years at NMY Dhanaura.19-Nov-2020 09:00 AM250.00
331SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_532046_1S/F of LED street light and main switch at NMY Tilhar (Shahjahanpur)23-Nov-2020 09:00 AM250.00
332SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_532049_1Internal Electrification in 05 No super market shop at N.M.Y Badaun (Badaun)23-Nov-2020 09:00 AM250.00
333SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_532053_1S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar,1 Nos R. O. Plant, 4 KVA Steplizer 01 Nos, Construction of Water Coolar Cage 01 Nos, G. I. Pipe Line Connection, Cabling work at NMY Dataganj(Distt. Budaun)23-Nov-2020 09:00 AM250.00
334SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_532057_1Internal Electrification in 14 No C- type shop and L.T line work at N.M.Y Bisouli (Badaun)23-Nov-2020 09:00 AM250.00
335SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_532064_1Internal Electrification in New Pump Sambhal (Sambhal )23-Nov-2020 09:00 AM250.00
336SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_532072_1Construction of 03 no. Mini boring and S/F OF 1.00 H.P submersible pump at NMY Sambhal ( Sambhal ).23-Nov-2020 09:00 AM250.00
337SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_533423_1Internal Electrification in 03 No APF (12x44M), S/F of 7.5 H.P Submersible pump and associated L.T. line work at N.M.Y Dataganj (Badaun)27-Nov-2020 09:00 AM250.00
338SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_533429_1Internal Electrification in 01 no. toilet block at NMY Chandausi (Sambhal)27-Nov-2020 09:00 AM250.00
339SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_533439_1Construction of 01 no. Mini boring and S/F of submersible pump set at SMY Gajraula( Amroha) and Construction of 02 no. Mini boring and S/F of submersible pump set at NMY Hasanpur (Amroha).27-Nov-2020 09:00 AM250.00
340SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_539591_1Internal Signage work using retro reflective sheet at NMY Puranpur21-Dec-2020 09:00 AM250.00
341SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_539593_1Shifting of pole / Repairing of L. T. Line and CONSTRUCTION OF 2 No BORING 140 MM DIA , S/F OF submersible pump set at NMY chandausi ( Distt. Sambhal) .21-Dec-2020 09:00 AM251.35
342SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_540439_1S/F of LED street light, main switch and change over switch at NMY Ujhani (Budaun)24-Dec-2020 09:00 AM250.00
343SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_540446_1S/I of 1 No. Over Head Structure Type Retro Reflective High Intensity Board on Main Gate at NMY Ujhani (Distt. Budaun)24-Dec-2020 09:00 AM250.00
344SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_540458_1Construction of Tubewell and S/F of 01HP Submersible Pump at NMY Sahswan (Budaun)24-Dec-2020 09:00 AM250.00
345SE Zone-2||Dy Director Construction(E-M), Bareilly2020_RKUMP_540462_1S/I/C/Testing of 04 Nos 150 Ltr. Capacity Water Coolar, 04 Nos R. O. Plant, 4 KVA Steplizer, Construction of Water Coolar Cage 04 Nos, G. I. Pipe Line Connection and Cabling work at N. M. Y. Najibabad (Distt. Bijnaur)24-Dec-2020 09:00 AM250.00
346SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_544652_1S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar, 01 Nos R. O. Plant, 4 KVA Steplizer 01 Nos, Cabling work, S/E of LT panel, construction of 01 no. Mini boring with 1HP submersible pump at SMY Banda(Puwayan)11-Jan-2021 09:00 AM250.00
347SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_544657_1S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar, 01 Nos R. O. Plant, 4 KVA Steplizer 01 Nos. at NMY Baheri (Bareilly)11-Jan-2021 09:00 AM250.00
348SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_544785_1E-Quotation 948S/I/T/C of VHT Unit,Mango Processing Line, Cold Room,Ripening Room,Pre-Cold Room,DG Sets,Vegetable Processing Line,LT Panel,Evaporator and Condensing Unit,Puff Panel and supply of allied equipments for Fruit and vegetable pack house, NMY Amroha11-Jan-2021 09:00 AM250.00
349SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_545840_1Rewiring of internal electrification in Mandi Samiti Office, S/F of LED tubelight, S/E of damaged 2 no. steel tubular poles near mandi yard gate, S/L of cable for mandi samiti office and main cable from transformer at NMY Bareilly15-Jan-2021 09:00 AM250.00
350SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_545841_1S/F of LED flood light in 03 no. 16m hight high mast and fixing of old sodium lights in 01 no. 16m high mast system at SMY Nawabganj(Bareilly)15-Jan-2021 09:00 AM250.00
351SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_546648_1S/F of LED street light and main switch at NMY Tilhar (Shahjahanpur)19-Jan-2021 09:00 AM250.00
352SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_546649_1Internal Electrification in 14 No C- type shop and L.T line work at N.M.Y Bisouli (Badaun)19-Jan-2021 09:00 AM250.00
353SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_546650_1S/F of LED street light, main switch and change over switch at NMY Ujhani (Budaun)19-Jan-2021 09:00 AM250.00
354SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_546651_1S/I of 1 No. Over Head Structure Type Retro Reflective High Intensity Board on Main Gate at NMY Ujhani (Distt. Budaun)19-Jan-2021 09:00 AM250.00
355SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_546652_1Construction of Tubewell and S/F of 01HP Submersible Pump at NMY Sahswan (Budaun)19-Jan-2021 09:00 AM250.00
356SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_546653_1Internal Electrification in 03 No APF (12x44M), S/F of 7.5 H.P Submersible pump andassociatedL.T line work at N.M.Y Dataganj(Badaun)19-Jan-2021 09:00 AM250.00
357SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_546654_1Internal Signage work using retro reflective sheet at NMY Puranpur19-Jan-2021 09:00 AM250.00
358SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_546655_1Internal Electrification in 01 no. toilet block at NMY Chandausi (Sambhal)19-Jan-2021 09:00 AM250.00
359SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_546656_1Construction of 01 no. Mini boring and S/F of submersible pump set at SMY Gajraula( Amroha) and Construction of 02 no. Mini boring and S/F of submersible pump set at NMY Hasanpur (Amroha).19-Jan-2021 09:00 AM250.00
360SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_554388_1S/F of LED street light, main switch and change over switch at NMY Ujhani (Budaun)12-Feb-2021 09:00 AM250.00
361SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_554407_1Construction of Tubewell and S/F of 01HP Submersible Pump at NMY Sahswan (Budaun)12-Feb-2021 09:00 AM250.00
362SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_554415_1Internal Electrification in 03 No APF (12x44M), S/F of 7.5 H.P Submersible pump andassociatedL.T line work at N.M.Y Dataganj(Badaun)12-Feb-2021 09:00 AM250.00
363SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_554421_1Supply and laying of cable from generator room to inspection house at NMY Pilibhit (Pilibhit)12-Feb-2021 09:00 AM250.00
364SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_554425_1Internal Electrification in 01 no. toilet block at NMY Chandausi (Sambhal)12-Feb-2021 09:00 AM250.00
365SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_560021_1S/I/T/C of VHT unit, Cold Room, Ripening room, Fruits processing line, Veg. processing line, hot water treatment unit and allied equipments, Comprehensive Annual Maintenance for 4yrs. Operation for 5yrs of Integrated Pack House at NMY Amroha27-Feb-2021 09:00 AM5000.00
366SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_560030_1Internal electrification work, S/E of LT panel, S/I/T/C of Diesel Generator Set and S/I/T/C of 02no. 16m high mast with LED flood light and Construction of mini boring with S/F of 02HP Submersible Pump in Integrated Pack House Facility at NMY Amroha27-Feb-2021 09:00 AM961.34
367SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_560673_1S/I/C/Testing of 01 Nos 150 Ltr. Capacity Water Coolar, 01 Nos R. O. Plant, 4 KVA Steplizer 01 Nos. at NMY Baheri (Bareilly)01-Mar-2021 09:00 AM250.00
368SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_564771_1Supply and laying of cable from generator room to inspection house at NMY Pilibhit (Pilibhit)08-Mar-2021 09:00 AM250.00
369SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_564795_1Internal Electrification in 01 no. toilet block at NMY Chandausi (Sambhal)08-Mar-2021 09:00 AM250.00
370SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_567737_1Construction of Tubewell and S/F of 01HP Submersible Pump, S/I/T/C of 2.00KW on grid solar plant and 4 no. solar street light in Rurban Mart Vill. Faridpur Inayat Khan, Development Block Bithri Chainpur.11-Mar-2021 09:00 AM250.00
371SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_567878_1S/F of steel tubular poles with LED street light on main gate, S/L of cable for residential colony and APF, Construction of 1no. Mini Boring and S/F of 01 HP Submersible Pump at NMY Milak.12-Mar-2021 09:00 AM250.00
372SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_586882_1S/I/T/C of mechanical machines and allied equipments at Integrated Pack House Amroha, Maintenance and operation of Integrated Pack House Amroha.18-May-2021 09:00 AM5000.00
373SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_586923_1S/F of steel tubular poles with LED street light on main gate, S/L of cable for residential colony and APF, Construction of 1no. Mini Boring and S/F of 01 HP Submersible Pump at NMY Milak.18-May-2021 09:00 AM250.00
374SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_591710_1Mechanical work at Integrated pack house, Amroha03-Jun-2021 09:00 AM5000.00
375SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_621725_1S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, Cabling work, Construction of 02 no. boring 110mm dia and S/F of 1.00 HP submersible pump at NMY Beesalpur21-Sep-2021 09:00 AM250.00
376SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_621726_1S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Tilhar (Distt. Shahjahanpur)21-Sep-2021 09:00 AM250.00
377SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_621727_1S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Bilsi (Distt. Budaun)21-Sep-2021 09:00 AM250.00
378SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_621728_1S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Bisauli (Distt. Budaun)21-Sep-2021 09:00 AM250.00
379SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_621729_1S/F of LED flood lights in 3 no. 16mt. Hight high mast, S/F of LED street light at NMY Chandpur (Distt. Bijnaur)21-Sep-2021 09:00 AM250.00
380SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_621730_1Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe at NMY Chandpur (Distt. Bijnaur)21-Sep-2021 09:00 AM250.00
381SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_621731_1Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe and cabling work at NMY Rampur (Distt. Rampur)21-Sep-2021 09:00 AM250.00
382SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_636992_1S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Tilhar (Distt. Shahjahanpur)28-Oct-2021 09:00 AM250.00
383SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_637011_1S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Bisauli (Distt. Budaun)28-Oct-2021 09:00 AM250.00
384SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_637027_1Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe at NMY Chandpur (Distt. Bijnaur)28-Oct-2021 09:00 AM250.00
385SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_637051_1Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe and cabling work at NMY Rampur (Distt. Rampur)28-Oct-2021 09:00 AM250.00
386SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_643974_1S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Tilhar (Distt. Shahjahanpur)17-Nov-2021 09:00 AM250.00
387SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_643984_1S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Bisauli (Distt. Budaun)17-Nov-2021 09:00 AM250.00
388SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_643995_1Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe at NMY Chandpur (Distt. Bijnaur)17-Nov-2021 09:00 AM250.00
389SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_644006_1Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe and cabling work at NMY Rampur (Distt. Rampur)17-Nov-2021 09:00 AM250.00
390SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_650391_1S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Tilhar (Distt. Shahjahanpur)03-Dec-2021 09:00 AM250.00
391SE Zone-2||Dy Director Construction(E-M), Bareilly2021_RKUMP_650405_1S/I/C/T of 02 no. 150 Ltr. Capacity Water cooler, 4 KVA Steplizer 02 Nos, Construction of Water Coolar Cage 02 Nos, G. I. Pipe Line Connection, Cabling work at NMY Bisauli (Distt. Budaun)03-Dec-2021 09:00 AM250.00
Total121945.38
Tender detail with UPLC Charges