SN | Orgnization | Tender Id | Tender Reference No | Tender Title | PublishedDate | Amount(UPLC Charges) | Payment | Payment Detail |
1 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_105080_1 | ET-04/DDC/BDN/2017-650 Dt 13.10.2017 | PATICH WORK LINK ROAD | | 250.00 | | |
2 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_105176_1 | ET-08/DDC/BDN/2017- 650 Dt 13.10.2017 | Link Road Patch Work | | 250.00 | | |
3 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_105288_1 | ET-11/DDC/BDN/2017-650 Dt. 13.10.2017 | Link Road Paitch Work | | 250.00 | | |
4 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_113479_1 | Et-14/DDC/BDN/17/696/Dt1-11-17 | Link Road Paitc Work | | 250.00 | | |
5 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_306172_1 | ET-42/DDC/BDN/2019-45 dt. 05-02-2019 | Consttruction Work. | 14-Feb-2019 10:00 AM | 395.64 | | |
6 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_105083_1 | ET-05/DDC/BDN/2017-650 Dt 13.10.2017 | Link Road Patch Work | | 250.00 | | |
7 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_105087_1 | ET-06/DDC/BDN/2017-650 DT 13.10.2017 | Link Road Patch Work | | 250.00 | | |
8 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_105142_1 | ET-07/DDC/BDN/2017-650 DT 13.10.2017 | Link Road Paitch Work | | 278.53 | | |
9 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_105250_1 | ET-09/DDC/BDN/2017-650 Dt.13.10.2017 | Link Road Paitch Work | | 250.00 | | |
10 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_105273_1 | ET-10/DDC/BDN/2017-650 Dt 13.10.2017 | Link Road Paitch Work | | 250.00 | | |
11 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_105323_1 | ET-12/DDC/BDN/2017-650 Dt 13.10.2017 | Link Road Paitch Work | | 250.00 | | |
12 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_113464_1 | ET-13/DDC/BDN/2017/696 Dt1-11-2017 | Link Road Paitch Work | | 250.00 | | |
13 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_289535_1 | ET-39/DDC/BDN/2018-538 | Civil Work | 03-Jan-2019 10:00 AM | 1318.99 | | |
14 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_289582_1 | ET-40/DDC/BDN/2018-583 dt. 26-12-2018 | Civil Work | 03-Jan-2019 10:00 AM | 321.98 | | |
15 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_296245_1 | ET-41/DDC/BDN/2019-15 dt. 16-01-2019 | Civil Work | 19-Jan-2019 10:00 AM | 1318.99 | | |
16 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_103540_1 | ET-01/DDC/BDN/2017-650 Dt 13.10.2017 | Link Road Patch Work | | 250.00 | | |
17 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_103605_1 | ET-02/DDC/BDN/2017-650 DT 13.10.2017 | Link Road Paitch Work | | 250.00 | | |
18 | SE Zone-2||Dy Director Construction, Badaun | 2017_RKUMP_105073_1 | ET-03/DDC/BDN/2017-650 DT 13.10.2017 | Link Road Patch Work | | 250.00 | | |
19 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_195453_1 | ET-16/DDC/BDN/2018-109 DT-19.04.2018 | CONSTRUCTION OF APR0ACH ROAD AND C.C WORK DRAIN WORK ARROUND 12X88 M SIZE COVRED A.P.F. NO 4 AT N.MY BUDAUN | 26-Apr-2018 12:00 PM | 641.60 | | |
20 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_195377_1 | ET-15/DDC/BDN/2018-109 Dt. 19.04.2018 | Maintenance repairing various buildings maintenance raising of boundarywall and installation of 03 nos fire hydrant at N.M.Y. BUDAUN. | 26-Apr-2018 02:00 PM | 644.22 | | |
21 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_195490_1 | ET-17/DDC/BDN/2018-109 Dt-19.04.2018 | CONSTRUCTION OF APRON C.C. WORK ARROUND 12X88 M SIZE COVERED A.P.F. NO 3 AND 01 NO AGRICULTURE MARKETING OFFICE AT N.M.Y.BUDAUN. | 26-Apr-2018 02:00 PM | 414.53 | | |
22 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_195507_1 | ET-18/DDC/BDn/2018-109 Dt- 19.04.2018 | CONSTT. OF 01 NO. GENERATER ROOM C.C. WORK IN FRONT OF 18 NO. FV C TYPE SHOPS AT N.M.Y. BUDAUN. | 26-Apr-2018 03:00 PM | 417.22 | | |
23 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_203372_1 | ET-19/DDC/BDN/2018-138 Dt 08.05.2018 | Tender for Outsorsing worker for gest house | 14-May-2018 01:35 PM | 250.00 | | |
24 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_203387_1 | ET-20/DDC/BDN/2018-138 DT 08-05-2018 | Tender For Outsorsing worker for gest house Billsi | 14-May-2018 02:00 PM | 250.00 | | |
25 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_206042_1 | ET-21/DDC/BDN/2018-158 DT 18.05.2018 | Maintenance repairing various buildings maintenance raising of boundarywall and installation of 03 nos fire hydrant at N.M.Y. BUDAUN | 21-May-2018 03:30 PM | 730.00 | | |
26 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_206076_1 | ET-22/DDc/BDn/2018-158 DT 18.05.2018 | CONSTRUCTION OF APR0ACH ROAD AND C.C WORK DRAIN WORK ARROUND 12X88 M SIZE COVRED A.P.F. NO. 4 AT N.MY. BUDAUN. | 21-May-2018 04:00 PM | 730.00 | | |
27 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_265377_1 | ET-23/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM KASIMPUR TO KHASPUR UMS BUDAUN | 26-Oct-2018 10:00 AM | 250.00 | | |
28 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_265892_1 | ET-24/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM AONLA BUDAUN ROAD TO HARHARPUR AND AONLA BUDAUN ROAD TO NANDGAON UMS BUDAUN | 26-Oct-2018 10:00 AM | 250.00 | | |
29 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_265943_1 | ET-25/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM BAREILLY BUDAUN ROAD TO NAI UMS BUDAUN | 26-Oct-2018 10:00 AM | 250.00 | | |
30 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_265955_1 | ET-26/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM MUSAJHAG POLICE STATION TO TAJPURA VIA GOVIND NAGLA UMS BUDAUN | 26-Oct-2018 10:00 AM | 279.68 | | |
31 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_265967_1 | ET-27/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM DATAGANJ BERA ROAD TO BIHARIPUR UMS DATAGANJ | 26-Oct-2018 10:00 AM | 250.00 | | |
32 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266017_1 | ET-28/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM PURWAKHERA TO SAHAWAR SHAH UMS BISAULI | 26-Oct-2018 10:00 AM | 250.00 | | |
33 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266027_1 | ET-29/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM FAIJGANJ BEHTA TO MITROLI UMS BISAULI | 26-Oct-2018 10:00 AM | 404.31 | | |
34 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266040_1 | ET-30/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM NAGLA JAIS TO FAIJGANJ UMS BISAULI | 26-Oct-2018 10:00 AM | 580.84 | | |
35 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266051_1 | ET-31/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM ISLAMNAGAR BAHJOI ROAD TO SAMADNAGAR AND ISLAMNAGAR BAHJOI ROAD TO ALLEPUR SAMASPUR UMS ISLAMNAGAR | 26-Oct-2018 10:00 AM | 250.00 | | |
36 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266077_1 | ET-32/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM ISLAMNAGAR CHANDAUSI ROAD CHAMARPURA CHAURAHA TO KUNWARPUR AND CHAMARPURA BALPUR ROAD TO NAUNA UMS ISLAMNAGAR | 26-Oct-2018 10:00 AM | 372.00 | | |
37 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266179_1 | ET-33/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM NAGLA BARAH TO JAREDA UMS ISLAMNAGAR | 26-Oct-2018 10:00 AM | 250.00 | | |
38 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266213_1 | ET-34/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM RUDAIN TO RAMNAGAR SAIDPUR UMS ISLAMNAGAR | 26-Oct-2018 10:00 AM | 357.81 | | |
39 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266237_1 | ET-35/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM ISLAMNAGAR BISAULI MARG PER CHICHETA CHAURAHA TO RAMNAGAR SAIDPUR (MADFODA) UMS ISLAMNAGAR | 26-Oct-2018 10:00 AM | 354.42 | | |
40 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266257_1 | ET-36/DDC/BDN/2018-453 DT 12.10.2018 | MAINTINANCE OF LINK ROAD FROM MAJRA NATH NAGLA TO HARPALPUR PRATHMIK VIDYALAYALA UMS UJHANI | 26-Oct-2018 10:00 AM | 250.00 | | |
41 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266857_1 | ET-37/DDC/BDN/2018-472 DT 17.10.2018 | Construction of 30 Nos Super Market Shops at N.M.Y. Bilsi (Budaun) | 29-Oct-2018 10:00 AM | 1134.91 | | |
42 | SE Zone-2||Dy Director Construction, Badaun | 2018_RKUMP_266899_1 | ET-38/DDC/BDN/2018-472 DT 17.10.2018 | Maintenance and Repairing work of 01 No. Toilet Block at N.M.Y. Bilsi | 29-Oct-2018 10:00 AM | 250.00 | | |
43 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_321038_1 | ET-43/DDC/BDN/2019-83 dt. 22-02-2019 | Construction of 06 Nos 100 M.T. Capacity godowns at N.M.Y. Ujhani (Budaun) | 25-Feb-2019 10:00 AM | 788.50 | | |
44 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_321060_1 | ET-44/DDC/BDN/2019-83 dt. 22-02-2019 | Maintenance reparing of boundary wall various buildings development work and supply Installation of 06 no. Indi Mark-II hand pump at N.M.Y. Ujhani (Budaun). | 25-Feb-2019 10:00 AM | 778.90 | | |
45 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_326917_1 | ET-45/DDC/BDN/2019-96 dt. 27-02-2019 | Construction of 3 Nos. C type shops and Maintenance repairing of various building at N.M.Y. SahaswanBudaun | 01-Mar-2019 10:00 AM | 480.80 | | |
46 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_349263_1 | ET-46/DDC/BDN/2019-248 dt. 27-05-2019 | Construction of 06 Nos 100 M.T. Capacity godowns at N.M.Y. Ujhani Budaun | 12-Jun-2019 10:00 AM | 788.50 | | |
47 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_349294_1 | ET-47/DDC/BDN/2019-248 dt. 27-05-2019 | Maintenance and repairing of boundary wall and various buildings development work and supply and installation of 06 No. India Mark -II hand pump at N.M.Y. Ujhani Budaun | 12-Jun-2019 10:00 AM | 690.20 | | |
48 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_369801_1 | ET-48/DDC/BDN/2019-390 dt. 31-07-2019 | Construction of 04 No C Type shops for Grain Market 10 No. C type shops for FV Market and repairing Maintenance of Internal road Constt. Of Internal road for FV Market and Culvert at N.M.Y. Bisauli Budaun. | 03-Aug-2019 02:00 PM | 743.76 | | |
49 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_369801_2 | ET-48/DDC/BDN/2019-390 dt. 31-07-2019 | Construction of 04 No C Type shops for Grain Market 10 No. C type shops for FV Market and repairing Maintenance of Internal road Constt. Of Internal road for FV Market and Culvert at N.M.Y. Bisauli Budaun. | 19-Aug-2019 12:00 PM | 743.90 | | |
50 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_369801_3 | ET-48/DDC/BDN/2019-390 dt. 31-07-2019 | Construction of 04 No C Type shops for Grain Market 10 No. C type shops for FV Market and repairing Maintenance of Internal road Constt. Of Internal road for FV Market and Culvert at N.M.Y. Bisauli Budaun. | 29-Aug-2019 10:00 AM | 743.90 | | |
51 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398038_1 | ET-49/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Budaun Billsi to Daviyari Ghari Under Mandi Samiti Ujhani Budaun | 01-Nov-2019 10:00 AM | 250.00 | | |
52 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398054_1 | ET-50/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Ghatpuri Railway Station to Palia Jhanda Under Mandi Samiti Budaun | 01-Nov-2019 10:00 AM | 250.00 | | |
53 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398069_1 | ET-51/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Patasa Jagat road to Kundeli Under Mandi Samiti Budaun | 01-Nov-2019 10:00 AM | 250.00 | | |
54 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398085_1 | ET-52/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Kadarchouk road to Rahimuddin Nagar Under Mandi Samiti Ujhani Budaun | 01-Nov-2019 10:00 AM | 250.00 | | |
55 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398093_1 | ET-53/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Hazratpur to Chakba Under Mandi Samiti Datagunj Budaun | 01-Nov-2019 10:00 AM | 250.00 | | |
56 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398101_1 | ET-54/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of Link road from Nadha Shaswan Road to Jallupur Under Mandi Samiti Sahaswan Budaun | 01-Nov-2019 10:00 AM | 289.52 | | |
57 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398101_2 | ET-54/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of Link road from Nadha Shaswan Road to Jallupur Under Mandi Samiti Sahaswan Budaun | 01-Nov-2019 10:00 AM | 289.46 | | |
58 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398038_2 | ET-49/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Budaun Billsi to Daviyari Ghari Under Mandi Samiti Ujhani Budaun | 05-Nov-2019 10:00 AM | 250.00 | | |
59 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398054_2 | ET-50/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Ghatpuri Railway Station to Palia Jhanda Under Mandi Samiti Budaun | 05-Nov-2019 10:00 AM | 250.00 | | |
60 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398069_2 | ET-51/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Patasa Jagat road to Kundeli Under Mandi Samiti Budaun | 05-Nov-2019 10:00 AM | 250.00 | | |
61 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398085_2 | ET-52/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Kadarchouk road to Rahimuddin Nagar Under Mandi Samiti Ujhani Budaun | 05-Nov-2019 10:00 AM | 250.00 | | |
62 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398093_2 | ET-53/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Hazratpur to Chakba Under Mandi Samiti Datagunj Budaun | 05-Nov-2019 10:00 AM | 250.00 | | |
63 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398101_3 | ET-54/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of Link road from Nadha Shaswan Road to Jallupur Under Mandi Samiti Sahaswan Budaun | 05-Nov-2019 10:00 AM | 289.46 | | |
64 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398038_3 | ET-49/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Budaun Billsi to Daviyari Ghari Under Mandi Samiti Ujhani Budaun | 05-Nov-2019 10:00 AM | 250.00 | | |
65 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398054_3 | ET-50/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Ghatpuri Railway Station to Palia Jhanda Under Mandi Samiti Budaun | 05-Nov-2019 10:05 AM | 250.00 | | |
66 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398069_3 | ET-51/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Patasa Jagat road to Kundeli Under Mandi Samiti Budaun | 05-Nov-2019 10:10 AM | 250.00 | | |
67 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398085_3 | ET-52/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Kadarchouk road to Rahimuddin Nagar Under Mandi Samiti Ujhani Budaun | 05-Nov-2019 10:15 AM | 250.00 | | |
68 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398093_3 | ET-53/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of link road from Hazratpur to Chakba Under Mandi Samiti Datagunj Budaun | 05-Nov-2019 10:20 AM | 250.00 | | |
69 | SE Zone-2||Dy Director Construction, Badaun | 2019_RKUMP_398101_4 | ET-54/DDC/BDN/2019-574 dt. 25-10-2019 | Maintenance of Link road from Nadha Shaswan Road to Jallupur Under Mandi Samiti Sahaswan Budaun | 05-Nov-2019 10:25 AM | 289.46 | | |
Total | | | | | | 27362.04 | | |