SN | Orgnization | Tender Id | Tender Reference No | Tender Title | PublishedDate | Amount(UPLC Charges) | Payment | Payment Detail |
1 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_93782_1 | | R/m L/r Daskolwa Se Sokhapurva | | 250.00 | | |
2 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_94034_1 | | R/M L/R Ramvapur Rakhaunabagh Hote Hie Bakhria | | 250.00 | | |
3 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_95969_1 | | R/M L/R Mahso Se Farda | | 250.00 | | |
4 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_97826_1 | | R/M Of L/R Gram Badhnichafa ke Tola Singiyahva Moad Se Tola Katehribagh | | 250.00 | | |
5 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_98032_1 | | R/M Of L/R Kalyanpur Se Savanpur Bsavanpur | | 252.69 | | |
6 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_98049_1 | | R/M Of L/R Kanjahva Se Katahna | | 250.00 | | |
7 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100149_1 | | R/M Of Kudrha Jibhiyav Marg To Pipariya | | 250.00 | | |
8 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100517_1 | | L/R Kudwa to Baizipur | | 250.00 | | |
9 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100582_1 | | L/R HALLAUR TO SASNA KHANTA | | 250.00 | | |
10 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101107_1 | | R/M Of L/R P.W.D. Bariyahva | | 250.00 | | |
11 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101272_1 | | L/R salehpur chauraha to pwd bairhwa marg | | 250.00 | | |
12 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101330_1 | | R/M Of L/R Dharmsinghva Marg Se Thane Hote Hue Nahar Ki Patri | | 250.00 | | |
13 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101349_1 | | R/M Of L/R Belharkala Loharson Marg To Mudila Koilbhar Hote Hue Hasvapar | | 665.94 | | |
14 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101639_1 | | R/M of L/R kapia grant to teldihwa | | 343.88 | | |
15 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_102540_1 | | L/R GRAM BADHNI CHAFA KE TOLA SINGIYAHWA MOAD SE TOLA KATEHRI BAAG | | 250.00 | | |
16 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_103277_1 | | R/M Of L/R Lotan Nepal Seema Se Bhadurpur | | 250.00 | | |
17 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_104030_1 | | R/M Of L/R Gopalpur Se Rudrapur | | 250.00 | | |
18 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_107796_1 | | R/M Of L/R Ramvapur Rakhaunabagh Hote Hue Bakhria | | 250.00 | | |
19 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_111464_1 | | R/M Of L/R Salehpur Singarjot Marg To Chapiya Chitauni | | 250.00 | | |
20 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_111464_2 | | R/M Of L/R Salehpur Singarjot Marg To Chapiya Chitauni | | 250.00 | | |
21 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_111682_1 | | Dhanghta Umria Marg Se Balampur Hote Hue Haiser Road Tak | | 250.00 | | |
22 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113518_1 | | L/R Gopal pur to Rudrapur | | 250.00 | | |
23 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113625_1 | | L/R HARIGAON BAZAAR | | 273.26 | | |
24 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_114828_1 | | R/M Of L/R Salehpur Singarjot Road To Chapiya Chitauni | | 250.00 | | |
25 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_117337_1 | | R/M L/R Kalyanpur Se Savanpur Bsavanpur | | 252.69 | | |
26 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_117384_1 | | R/M Of L/R Kanjahva Se Katahna | | 250.00 | | |
27 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_170547_1 | 185 A | c.c. pavement IN front of shops/APF OPEN space at NMY KHALILABAD | | 1722.37 | | |
28 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_181113_1 | 183 C | const and repairing of internal road navin mandi sthal Basti | | 555.08 | | |
29 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264505_1 | 195 | chetia kankati marg to Dadwa Bhargawa | 03-Nov-2018 11:00 AM | 250.00 | | |
30 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_266712_1 | 200 | Link road Daulatpur pitch road to Bhelkha via Bharsay | 03-Nov-2018 11:00 AM | 316.21 | | |
31 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_267844_1 | 206 | BABHNAN MAHUWA DABUR MARG TO SARNAAGI | 03-Nov-2018 11:00 AM | 250.00 | | |
32 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_268833_1 | 209 | BHANPUR RUDHAULI BARGADWA MARG TO KARAYAN | 03-Nov-2018 11:00 AM | 279.11 | | |
33 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_271521_1 | 214 | rep of link road Harpur to Bandhupur | 12-Nov-2018 11:00 AM | 274.34 | | |
34 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273717_1 | 189 | Rep of link road Kamdalalpur to Bhadokhar | 17-Nov-2018 12:00 PM | 734.30 | | |
35 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273828_1 | 195 | link road chetia kankati marg to Dadwa Bhargawa | 17-Nov-2018 12:00 PM | 250.00 | | |
36 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273982_1 | 210 | link road Saltauwa manikchand marg to kakrahwa | 17-Nov-2018 12:00 PM | 250.00 | | |
37 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_281519_1 | 193 | Rep of link road Shahpur gram to Shahpur Bazaar | 10-Dec-2018 04:00 PM | 250.00 | | |
38 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397377_1 | | Link Road Gayghat to Ranipur Menhdi Hasan house Rep work | 01-Nov-2019 02:00 PM | 355.57 | | |
39 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399398_1 | | REP WORK OF LINK ROAD ITWA ROAD TO PACHAHAR BAZAR | 08-Nov-2019 02:00 PM | 250.00 | | |
40 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409438_1 | | Rep of link road katayi mill magahar to Asharfabad | 05-Dec-2019 02:00 PM | 250.00 | | |
41 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409563_1 | | Rep of link road HATWA PITCH ROAD TO MAHADEWA MAHULI | 05-Dec-2019 02:00 PM | 250.00 | | |
42 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409796_1 | | Rep of link road MANJHARI T0 KALANDERPUR | 05-Dec-2019 02:00 PM | 279.08 | | |
43 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409821_1 | | REP WORK OF LINK ROAD TENUHAR TO NAAGABABA KUTI | 05-Dec-2019 02:00 PM | 250.00 | | |
44 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410130_1 | | Rep of link road ITWA ROAD TO PACHAHAR BAZAAR | 05-Dec-2019 02:00 PM | 250.00 | | |
45 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_428398_1 | | Rep of link road Gayghat to Ranipur Mehhdi Hasan house | 04-Feb-2020 02:00 PM | 250.00 | | |
46 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_446893_1 | | rep work link road Itwa biskohar marg to hirkhas sikri | 12-Mar-2020 02:00 PM | 567.00 | | |
47 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_553167_1 | | Repairing of link road Nauwa goan chauraha to Kaithwalia | 10-Feb-2021 02:00 PM | 250.00 | | |
48 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_649188_1 | | R/M link road ITWA BELWA MARG TO KUSAMHI | 30-Nov-2021 11:00 AM | 250.00 | | |
49 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409797_1 | | Rep of link road RUDHAULI BAKHIRA MARG TO VIJAHARDUHA | 05-Dec-2019 02:00 PM | 267.89 | | |
50 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409812_1 | | REP WORK OF LINK ROAD PIRAILA GRAM TO SHIV MANDIR | 05-Dec-2019 02:00 PM | 250.00 | | |
51 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410110_1 | | Rep of link road FATTEPUR PWD MARG TO DIHWA PEDARI | 05-Dec-2019 02:00 PM | 250.00 | | |
52 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410124_1 | | Rep of link road MAHMUDWA GRANT TO MAJRA SANGWAKHAS | 05-Dec-2019 02:00 PM | 250.00 | | |
53 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410135_1 | | Rep of link road L D MARG TO SUPA BAKSHI | 05-Dec-2019 02:00 PM | 250.00 | | |
54 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410137_1 | | Rep of link road ITWA MARG TO SEKHUIYA AMBEDKAR GRAM | 05-Dec-2019 02:00 PM | 250.00 | | |
55 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410139_1 | | Rep of link road BANSI NAUGARH MARG TO BABHANITAAL | 05-Dec-2019 02:00 PM | 250.00 | | |
56 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_271780_1 | 216 | Rep of link road Bhatpaara to Ekdanga | 12-Nov-2018 11:00 AM | 250.00 | | |
57 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_271802_1 | 219 | Rep of link road Bhagwatpur to Belrayi | 12-Nov-2018 11:00 AM | 250.00 | | |
58 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273635_1 | 186 | Rep of link road Basti Domariaganj marg to pokharbhitwa | 17-Nov-2018 12:00 PM | 250.00 | | |
59 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273740_1 | 190 | Rep of link road semari biskohar marg to Baburhwakhas | 17-Nov-2018 12:00 PM | 250.00 | | |
60 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273763_1 | 192 | Rep of link road Bhutahwa to Parsa via Gurauwajote | 17-Nov-2018 12:00 PM | 790.26 | | |
61 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273813_1 | 193 | Rep of link road Shahpur gram to shahpur bazaar | 17-Nov-2018 12:00 PM | 250.00 | | |
62 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_445826_1 | 01 | NAVEEN MANDI ESTHAL AMAULI BASTI ME SAFAI KA KARYA | 09-Mar-2020 02:00 PM | 250.00 | | |
63 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_445832_1 | 03 | upmandi esthal rudhauli me safai ka kkarya | 09-Mar-2020 02:00 PM | 250.00 | | |
64 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_267322_1 | 201 | link road Manjharia pitch road to kabra | 03-Nov-2018 11:00 AM | 312.95 | | |
65 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_267360_1 | 202 | Pradhanmantri sadak se chhota ailiya(aila) | 03-Nov-2018 11:00 AM | 250.00 | | |
66 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_267836_1 | 205 | GAURA BADUJOTE MARG TO SONAURA | 03-Nov-2018 11:00 AM | 275.41 | | |
67 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273878_1 | 199 | rep of link road sonupar dewaria marg to medha majhari | 17-Nov-2018 12:00 PM | 460.87 | | |
68 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273924_1 | 202 | REP of link road pradhanmantri sakak to chhota ailia | 17-Nov-2018 12:00 PM | 250.00 | | |
69 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273962_1 | 205 | REP OF link road Gaura Badujote marg to Sonaura | 17-Nov-2018 12:00 PM | 275.41 | | |
70 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_170940_1 | 183 B | WATER supply and 5 nos. water stand post work at NMY AND FRUIT YARD BASTI | | 250.00 | | |
71 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_171427_1 | 183 C | Internal road repail and construction at NMY SAHIYAPUR | | 555.08 | | |
72 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264162_1 | 186 | Rep of link road Basti domariaganj marg to pokharbhitwa | 03-Nov-2018 11:00 AM | 250.00 | | |
73 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264297_1 | 193 | shahpur Bazar to Shahpur village | 03-Nov-2018 11:00 AM | 250.00 | | |
74 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264480_1 | 194 | maintenance of link road sani to Bhatpurwa via Dhaurahra | 03-Nov-2018 11:00 AM | 250.00 | | |
75 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_275666_1 | 212 | munderwa semariyawan marg to changera mangera | 23-Nov-2018 12:00 PM | 250.00 | | |
76 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_275694_1 | 216 | BHATPARA TO EKDANGA | 23-Nov-2018 12:00 PM | 250.00 | | |
77 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_278237_1 | 193 | Rep of link road Shahpur gram to shahpur bazaar | 01-Dec-2018 12:00 PM | 250.00 | | |
78 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264638_1 | 196 | Tilauli paidikhurd marg par paidikhurd se ramwapur bhai | 03-Nov-2018 11:00 AM | 250.00 | | |
79 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264901_1 | 198 | Siddhartha nagar road to Kauwa gram | 03-Nov-2018 11:00 AM | 250.00 | | |
80 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264910_1 | 187 | Tetri gram ke purve se Divlidiha marg tak | 03-Nov-2018 11:00 AM | 279.71 | | |
81 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_285486_1 | 193 | Rep of link road shahpur gram to shahpur bazaar | 21-Dec-2018 02:00 PM | 250.00 | | |
82 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397016_1 | | BHADI BUJURG TO AUSAPUR | 01-Nov-2019 02:00 PM | 250.00 | | |
83 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397031_1 | | Link road Sringinari Vikramjot to Farenda rep work | 01-Nov-2019 02:00 PM | 250.00 | | |
84 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397034_1 | | Link road pachbas to Atraula rep work | 01-Nov-2019 02:00 PM | 250.00 | | |
85 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113494_1 | | R/M Of L/R L.R.P. Bhanpur Lodva Marg Se Manaudi Hote Hue Rustampur Chauraha | | 324.23 | | |
86 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_268343_1 | 199 | Sonupaar Dewaria marg to Medha Majhari | 03-Nov-2018 11:00 AM | 460.87 | | |
87 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_268439_1 | 208 | Vishesharganj kakrahwa mahughaat to Jogapur | 03-Nov-2018 11:00 AM | 359.82 | | |
88 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_268821_1 | 207 | HARAIYYA BABHNAAN MARG TO BHAUKHARY | 03-Nov-2018 11:00 AM | 250.00 | | |
89 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113746_1 | | R/M Of Kanjahva Se Kathna | | 250.00 | | |
90 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113757_1 | | R/M Of L/R Biskohar Singarjot Mukya Marg Se Darginiya | | 250.00 | | |
91 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113785_1 | | R/M Of L/R Kalyanpue Se Savanpur Bsavanpur | | 252.69 | | |
92 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113803_1 | | Ramvapur Rakhunabagh Hote Hue Bakharia | | 250.00 | | |
93 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_114841_1 | | R/M Of L/R Belharkla Loharson Marg Mudila Koilbhar Hote Hue Hasvapar | | 665.94 | | |
94 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_114858_1 | | R/M Of L/R Kanjahva Se Ahdi | | 497.69 | | |
95 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_114961_1 | | R/M Of L/R KapiyaGrant Se Teldihva | | 343.88 | | |
96 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_117351_1 | | R/M Of L/R Lotan Nepal Seema Se Bhadurpur | | 250.00 | | |
97 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_117371_1 | | R/m Of L/R Uska Sohas Marg Se Uchhariya Badki | | 250.00 | | |
98 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_103310_1 | | R/M Of L/R L.D. Marg Se Jhande Nagar Nisshitpur | | 250.00 | | |
99 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_103347_1 | | R/M Of L/R Uska Sohas Marg Se Uchharia Badki | | 250.00 | | |
100 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_103364_1 | | R/M Of L/R Kanjahva Se Katahna | | 250.00 | | |
101 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_104022_1 | | L/R PAKKI SADAK SE GUJRAJLIA KHALSA | | 250.00 | | |
102 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_107433_1 | | L/R Of R/M Mahnso Se Farda | | 250.00 | | |
103 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_107698_1 | | R/M Of L/R Kudva Se Baigipur | | 250.00 | | |
104 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_107769_1 | | R/M Of L/R Visunpurva Hanumanganj Marg Se Nevarvar | | 250.00 | | |
105 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_107675_1 | | R/M Of L/R Lakhnaura School Se Tenui Gram | | 250.00 | | |
106 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_108230_1 | | R/M Of L/R Hanumanganj Padi Marg Auradeeha Hote Hue Bhita | | 250.00 | | |
107 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_107796_3 | | R/M Of L/R Ramvapur Rakhaunabagh Hote Hue Bakhria | | 250.00 | | |
108 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_107433_2 | | L/R Of R/M Mahnso Se Farda | | 250.00 | | |
109 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_117389_1 | | R/M Of L/R Pakki Sadak Se Gujrauliya Khalsa | | 250.00 | | |
110 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_117400_1 | | R/M Of L/R Gopalpur Se Rudrarpur | | 250.00 | | |
111 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_117680_1 | | R/M Of L/R Belharkla Loharson Marg Mudilakla Hote Hue Hasvapar | | 665.94 | | |
112 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_111505_1 | | R/M Of L/R Parsa SukulP.M.G.S.Y. Marg To Gram ParsaMafi School And Gram Tak | | 250.00 | | |
113 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_111540_1 | | R/M Of L/R Belharkla Loharson Marg Mudila Koilbhar Hote Hue Hasvapar | | 665.94 | | |
114 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101273_1 | | R/M Of L/R Jagdishpur Chauki Se Devri Asrafpir Marg Tak | | 250.00 | | |
115 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101287_1 | | R/M Of L/R Dhanghata Umariya Marg Se Balampur Hote Hue Haishar Road Tak | | 250.00 | | |
116 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101303_1 | | R/M Of L/R Basti Mehdaval Marg To Bhatpurva Tak | | 274.72 | | |
117 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101310_1 | | L/R RAMWAPUR SARKARI TO BANAULI PRADHANMANTRI ROAD VIA SAMUDAYIK KENDRA | | 250.00 | | |
118 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101314_1 | | R/M Of L/R Parsa Shukl PMGSY Se Gram ParsaMafi School Gaon Tak | | 250.00 | | |
119 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101343_1 | | R/M Of L/R Bhagausa Se Bhitiya Kithuri Bargadva Dhongapar Hote Hue Sarauaghat | | 258.22 | | |
120 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101340_1 | | L/R BASTI MENHDAWAL MARG PAR PIPRA BORING TO DASWADIH | | 250.00 | | |
121 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_111567_1 | | KADJAHWA TO AHADI | | 497.69 | | |
122 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_111615_1 | | R/M Of L/R kapia grant to teldihwa | | 343.88 | | |
123 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_111645_1 | | R/M Of L/R Jagdishpur Chauki Se Debri Ashrafpur Marg Tak | | 250.00 | | |
124 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101360_1 | | R/M Of L/R Loharson Motipur Belharkla Ke Beech Ka Bhag | | 250.00 | | |
125 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101368_1 | | R/M Of Kajahva Se Ahdi | | 497.69 | | |
126 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_98037_1 | | R/M Of L/r Lotan Nepal Seema Se Bahadurpur | | 250.00 | | |
127 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_98040_1 | | R/M Of L/R L.D Marg Se Jhande Nagar NishitPur | | 250.00 | | |
128 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_98047_1 | | R/M Of L/R UskaSohas Marg Se Uchhariya Badki | | 250.00 | | |
129 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_98051_1 | | R/M Of L/R Pakki Sadak Se Gujrauliya Khalsa | | 250.00 | | |
130 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_98053_1 | | R/M Of L/R Gopalpur Se Rudrapur | | 250.00 | | |
131 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_99690_1 | | R/M Of L/R Rudhauli Dumariaganj Marg se Thaurli | | 250.00 | | |
132 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_99707_1 | | R/M Of L/R Basti Bansi Marg To Amghati Vai Basantpur | | 331.98 | | |
133 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101974_1 | | l/r itwa belwa chitiya marg to ratanpur kankati via bankata | | 332.11 | | |
134 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_102419_1 | | R/M Of L/R Itwa Biskohar Marg To Biskoharkhas | | 250.00 | | |
135 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_102451_1 | | L/R BISKOHAR SINGARJOT MAIN ROAD TO DARJINIA | | 250.00 | | |
136 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_102478_1 | | L/R LRP BHANPUR LODHWA MARG TO RUSTAMPUR CHAURAHA VIA MANAUDI | | 324.23 | | |
137 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100154_1 | | L/R Bardad marg to pikaura gram | | 250.00 | | |
138 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100445_1 | | L/R Dashkolwa to shokhapurwa | | 250.00 | | |
139 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100480_1 | | L/R Lakhnaur school to teniyi gram | | 250.00 | | |
140 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100508_1 | | L/R parasi pokhara pitch road se arvind ke ghar hote huye uttar pitchroad tak | | 250.00 | | |
141 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100528_1 | | L/R Bishunpurwa hanumanganj marg to newarwar | | 250.00 | | |
142 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100549_1 | | L/R Ramwapur rakhaunabaag hote huye bakharia tak | | 250.00 | | |
143 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100564_1 | | L/R PADARIA DATTU GAON TO AASHRAM SEMAHO | | 250.00 | | |
144 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100592_1 | | L//R HANUMANGANJ PAIDI MARG TO BHITA VIA AURADIHA | | 250.00 | | |
145 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_100461_1 | | L/R mahson to farda | | 250.00 | | |
146 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101099_1 | | R/m of L/R salehpur singarjot marg to chhapia chhitauni | | 250.00 | | |
147 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_93841_1 | | R/m L/R Kudraha JIbhiyav Marg To Pipariya | | 250.00 | | |
148 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_93941_1 | | R/M L/R Bardad marg to Pikaura Gaon | | 250.00 | | |
149 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_93973_1 | | R/M L/R Lakhnaura School To Tenui Gram | | 250.00 | | |
150 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_94003_1 | | R/M L/R Parasi Pokhra Pich Road Se Arvind Ke Ghar Hote Hue Uttar Pich Road Tak | | 250.00 | | |
151 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_92306_1 | | R/M L/R VISHUNPURWA HANUMANGANJ MARG PER NEWARWAR | | 250.00 | | |
152 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_93762_1 | | R/M of L/R Kudwa to bazipur | | 250.00 | | |
153 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_94074_1 | | R/M L/R Paddia Dattu Gaon Se Semho AAshram | | 250.00 | | |
154 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_94110_1 | | R/M L/R Hallour se sasna Kjanta | | 250.00 | | |
155 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_94281_1 | | R/M L/R HanumanGanj Padi Marg Auradeeha Hote Hue Bhita | | 250.00 | | |
156 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_97803_1 | | R/M L/R Itwa Belwa Chetiya Marg To Bankta Hote Hue Ratanpur Kankati | | 332.11 | | |
157 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_97806_1 | | R/M of L/R Itwa Biskohar marg to Biskoharkhas | | 250.00 | | |
158 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_97809_1 | | R/M of L/R Biskohar singarjote mukhya marg se darjiniya | | 250.00 | | |
159 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_97818_1 | | R/M L/R L R P BHANPUR LODHWAMARG SE MANAUDI HOTE HUYE RUSTAMPUR CHAURAHA | | 324.23 | | |
160 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_97829_1 | | R/M Of L/R Didai GhoSiyari Marg Se Ghumchi Se Parsakhurd Hote Hue Kapiyakala | | 346.43 | | |
161 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_98000_1 | | R/M Of L/r Rudhuli Bansi Marg To Daredeeha | | 250.00 | | |
162 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_98001_1 | | R/M Of Link Road Harigaon Bazar | | 273.26 | | |
163 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_102579_1 | | R/M Of L/R Dedai Ghosiyari Marg Se Ghumchi Se Parsakhurd Hote Hue Kapiyakla | | 346.43 | | |
164 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_102587_1 | | R/M Of L/R Rudhauli Bansi Marg Se Darediha | | 250.00 | | |
165 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_102643_1 | | L/R HARIGAON BAZAAR | | 273.26 | | |
166 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_102767_1 | | L/R KALYANPUR TO SAWANPUR BASHAWANPUR | | 252.69 | | |
167 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_97822_1 | | R/M Of L/R Gram Sbha Dhaurahrta Me Durga Parsad Kothi Se Paschim Pitch Road Se Badni Gaon Budhai Yadav Ke Ghar Tak | | 250.00 | | |
168 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_101366_1 | | L/R BADE VAN KESHAV CHAUDHARY KE GHAR SE MADWANAGAR GAON HOTE HUYE MADWANAGAR CHAURAHA | | 344.54 | | |
169 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_102495_1 | | L/R GRAM SABHA DHAURAHRA ME DURGA PRASAD KI KOTHI SE PASHCHIM PITCH ROAD SE BADHNI GAON BUDHAYI YADAV KE GHAR TAK | | 250.00 | | |
170 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_111578_1 | | R/M Of L/R Badeban Keshav Chaudhary Ke Ghar Se Madva Nagar Gram Hote Hue Madva Nagar | | 392.09 | | |
171 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_112025_1 | | R/M Of L/R Ramvapur Sarkari Se Samudayik Kendra Hote Hue Banauli PardhanMantri Marg Tak | | 250.00 | | |
172 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113581_1 | | Link road pakki sadak to Gujraulia khalsa | | 250.00 | | |
173 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113593_1 | | L/R USKA SOHAS MARG TO UNCHAHARIA BADKI | | 250.00 | | |
174 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113599_1 | | L.D. NAGAR TO JHANDENAGAR NISCHITPUR | | 250.00 | | |
175 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113609_1 | | L/R LOTAN NEPAL SEEMA TO BAHADURPUR | | 250.00 | | |
176 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_113531_1 | | R/M Of L/R GramSabha Dhaurahra Me Durga Parsad Ki Kothi Se Paschim Piitch Road Se Badni Gram Budhai Yadav Ke Ghar Tak | | 250.00 | | |
177 | SE Zone-3||Dy Director Construction, Basti | 2017_RKUMP_114853_1 | | R/M Of L/R Badevan Keshav Chaudhary Ke Ghar Se MadvaNagar Gaon Hote Hue MadvaNagar Chauraha | | 344.54 | | |
178 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_169833_1 | 184 a | three nos APF/ office building/boundary wall painting and repairing at NMY Sahiyapur | | 250.00 | | |
179 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_170477_1 | 184 B | Internal nali crossing, internal road by c.c. road construction/ repairing at NMY SAHIYAPUR | | 1598.69 | | |
180 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_170815_1 | 185 B | internal external nala c c drain crossing culvert AND saucer drain const. at NMY KHALILABAD | | 634.51 | | |
181 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_170893_1 | 185 C | const. of internal road around APF NOS.3 AND earth filling in open space at NMY KHALILABAD | | 250.00 | | |
182 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_170915_1 | 183 A | PAINTING of A B C Type shops, A E OFFICE , office builing check post ,pump house and boundary wall at NMY BASTI | | 250.00 | | |
183 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_181073_1 | 183B | water supply AND 5 nos. water stand post work in NMY and Fruit and vegetable yard BASTI | | 250.00 | | |
184 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_181163_1 | 184 B | Const of c.c. internal road and internal nali and crossing repail and const at NMY BASTI | | 1598.69 | | |
185 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_189129_1 | 183 B | water supply and 5 nos water stand post work in NMY and F/V YARD BASTI | 14-Apr-2018 12:00 PM | 250.00 | | |
186 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_193562_1 | 183 B | water supply and 5 nos water stand post work at NMY BASTI AND FRUIT AND VEgetable yard Basti | 24-Apr-2018 11:00 AM | 250.00 | | |
187 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264240_1 | 188 | maintenance of Bhadaria Badhnichafa marg par sthit pandit sekhuiya hote huye sekhuvi taj sahri bhawaniganj marg tak | 03-Nov-2018 11:00 AM | 250.00 | | |
188 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264275_1 | 190 | maintenance of link road semari biskohar marg to baburahwakhas | 03-Nov-2018 11:00 AM | 250.00 | | |
189 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264288_1 | 191 | maintenance of link road Bansi Itwa Jhakahia marg to mainihwa chamrautia Basti tak | 03-Nov-2018 11:00 AM | 250.33 | | |
190 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_264731_1 | 197 | Pakri Mahuraia marg par sukrauli chaurahe se marwatia mafi | 03-Nov-2018 11:00 AM | 250.00 | | |
191 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_268856_1 | 210 | SALTAUWA MANIKCHAND MARG TO KAKRAHWA | 03-Nov-2018 11:00 AM | 250.00 | | |
192 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_269473_1 | 189 | KAMDALAL PUR TO BHADOKHAR REPAIRING WORK | 03-Nov-2018 11:00 AM | 734.30 | | |
193 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_269545_1 | 192 | Repairing of link road Bhutahwa to parsa via Gurauwajote | 03-Nov-2018 11:00 AM | 790.26 | | |
194 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_267781_1 | 203 | Jinwa marg to Loharsanpurwa Raghunathpur Majhauwa khajuri | 03-Nov-2018 11:00 AM | 283.38 | | |
195 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_267821_1 | 204 | dubaulia pachpedwa marg se asnahra and keshwapur chauraha se pokharmitti | 03-Nov-2018 11:00 AM | 250.00 | | |
196 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_268868_1 | 211 | EKTEKWA CHAURAHE BELGHAT MARG TO EKTEKWA AND MAHUGHAT TO LAKSHMANPUR | 03-Nov-2018 11:00 AM | 250.00 | | |
197 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_271436_1 | 212 | Repairing of link road Munderwa semariyavan road to changera Mangera | 12-Nov-2018 11:00 AM | 250.00 | | |
198 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_271511_1 | 213 | Repairing of link road Khalilabad mukhlispur road to Naathnagar | 12-Nov-2018 11:00 AM | 253.07 | | |
199 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_271534_1 | 215 | Repairin of link road Hainsar Madrahia marg to Bhagwandas ghar to mahabaandh | 12-Nov-2018 11:00 AM | 250.00 | | |
200 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_271795_1 | 217 | Rep of link road Rampur Chhapia nagar ke pul se pachpedwa and Thuranda road to Dhodhayi gram | 12-Nov-2018 11:00 AM | 250.00 | | |
201 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_271798_1 | 218 | Rep of Link road Temi semariyava marg to Nabipur and Rupan chaurahe to Salahabaad | 12-Nov-2018 11:00 AM | 250.00 | | |
202 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_271806_1 | 220 | Rep of link road on Pipra to semariyava road Datuakhor to Barainia mirapur | 12-Nov-2018 11:00 AM | 294.98 | | |
203 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273747_1 | 191 | REP OF link road Bansi Itwa Jhakahia marg to mainihwa chamrautia basti tak | 17-Nov-2018 12:00 PM | 250.33 | | |
204 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273837_1 | 196 | REP OF LINK ROAD Tilauli paidikhurd marg par uaidikhurd se ramwapur bhai | 17-Nov-2018 12:00 PM | 250.00 | | |
205 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273852_1 | 197 | Repairing of link road Pakri Mahuraia marg par sukrauli chaurahe se marwatia mafi | 17-Nov-2018 12:00 PM | 250.00 | | |
206 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273871_1 | 198 | Rep of link road Siddharthanagar shohratgarg marg to kauwa gram | 17-Nov-2018 12:00 PM | 250.00 | | |
207 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273914_1 | 200 | Rep of link road Daulatpur pitch road to Bhelkha via Bharsay | 17-Nov-2018 12:00 PM | 316.21 | | |
208 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273937_1 | 203 | jINWA MARG TO LOHARSANPURWA RAGHUNATHPUR MAJHAWA KHAJURI | 17-Nov-2018 12:00 PM | 283.38 | | |
209 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399471_1 | | rep of link road L D MARG TO SUPA BAKSHI | 08-Nov-2019 02:00 PM | 250.00 | | |
210 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399732_1 | | rep work of link road BANSI NAUGARH MARG TO BABHANITAAL | 08-Nov-2019 02:00 PM | 250.00 | | |
211 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399004_2 | | REP OF LINK ROAD MENHDAWAL MARG TO NANDAUR | 25-Nov-2019 02:00 PM | 250.00 | | |
212 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409405_1 | | Rep of link road Rudhauli Bakhira marg to Karma kala | 05-Dec-2019 02:00 PM | 250.00 | | |
213 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273951_1 | 204 | REP OF LINK ROAD Dubaulia pachpedwa marg to Asnahra and keshwapur chauraha to pokharmitti | 17-Nov-2018 12:00 PM | 250.00 | | |
214 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273970_1 | 209 | rep of link road Bhanpur Rudhauli Bargadwa marg to Karayan | 17-Nov-2018 12:00 PM | 279.11 | | |
215 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273993_1 | 211 | link road Ektekwa chauraha belghat marg to ektekwa and mahughat to Lakshmanpur | 17-Nov-2018 12:00 PM | 250.00 | | |
216 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_273705_1 | 187 | Rep of link road Tetri gram ke purve se Diwlidiha marg tak | 17-Nov-2018 01:00 PM | 279.71 | | |
217 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_275712_1 | 217 | RAMPUR CHHAPIA NAHAR KE PUL SE PACHPEDWA AND THURANDA ROAD SE DHODHAYI GRAM TAK | 23-Nov-2018 12:00 PM | 250.00 | | |
218 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_278199_1 | 187 | REP OF LINK ROAD TETRI GRAM KE PURVE SE DIWLIDIHA MARG TAK | 01-Dec-2018 12:00 PM | 279.71 | | |
219 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_278572_1 | 203 | repairing of link road Jinwa marg to Loharsanpurwa Raghunathpur Majhauwa khajuri | 01-Dec-2018 04:00 PM | 283.38 | | |
220 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_281380_1 | 187 | REP of link road tetri gram ke purve se diwlidiha gram tad | 10-Dec-2018 02:00 PM | 279.71 | | |
221 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_283009_1 | 191 | Rep of link road Bansi Itwa Jhakahia marg to chamrautia basti Manihwa | 13-Dec-2018 02:00 PM | 250.00 | | |
222 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_285332_1 | 221 | const of 01 no adhunik toilet septik tank soak pit water supply fitting and 02 no sign board laying in NMY SAHIAPUR | 21-Dec-2018 02:00 PM | 250.00 | | |
223 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_289367_1 | 221 | const. of 01 no. aadhunik tiolet, septik tank, soak pit , water supply fitting and 2 nos sign board installation in NMY SAHIAPUR | 31-Dec-2018 02:00 PM | 250.00 | | |
224 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_289367_2 | 221 | const. of 01 no. aadhunik tiolet, septik tank, soak pit , water supply fitting and 2 nos sign board installation in NMY SAHIAPUR | 09-Jan-2019 02:00 PM | 250.00 | | |
225 | SE Zone-3||Dy Director Construction, Basti | 2018_RKUMP_289367_3 | 221 | const. of 01 no. aadhunik tiolet, septik tank, soak pit , water supply fitting and 2 nos sign board installation in NMY SAHIAPUR | 21-Jan-2019 02:00 PM | 250.00 | | |
226 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_330789_1 | 223 | Repailring work in NMY Naugarh office building shops gate and gate pillars B wall APF pump house canteen bank building int roadtype I II III etc | 04-Mar-2019 02:00 PM | 1466.87 | | |
227 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_466255_1 | | Rep of link Itwa Biskohar road to heerkhas sikri | 06-May-2020 05:00 PM | 567.00 | | |
228 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471147_1 | | C/O GAON SAKHI GORYAGHAT TO PIDIYA BELAHRA CHAURAHA | 18-May-2020 09:00 AM | 1246.41 | | |
229 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471263_1 | | c/ o link road gram panchayat pikaura pashchimi to nhogipur | 18-May-2020 09:00 AM | 250.48 | | |
230 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_348151_1 | | Repailring work in NMY Naugarh office building shops gate and gate pillars B wall APF pump house canteen bank building int roadtype I II III etc | 21-Jun-2019 02:00 PM | 1466.87 | | |
231 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_355348_1 | | rep work of A B C type shops gate and gate pillar canteen check post office buildingg and boundary wall etc paintin and const of c c road and earth filling at NMY KHALILABAD | 21-Jun-2019 02:00 PM | 250.00 | | |
232 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_355786_1 | | const. of 01 no. aadhunik tiolet, septik tank, soak pit , water supply fitting and 2 nos sign board installation at NMY khalilabad | 21-Jun-2019 02:00 PM | 250.00 | | |
233 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_359584_1 | | Repailring work in NMY Naugarh office building shops gate and gate pillars B wall APF pump house canteen bank building int roadtype I II III etc | 02-Jul-2019 02:00 PM | 1466.87 | | |
234 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370213_1 | | const of canteen /dhaba, kisan swagat kaksh, help booth desk, tiolet, amul/parag booth sell conunter ,(dormitory cost work), 01 no. enterance, rain water harvesting ,outer severage system cons work, sheet replacing of APF, repairing /painting of cons | 08-Aug-2019 02:00 PM | 1271.28 | | |
235 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370259_1 | | const of 01 no enam office and pesticide reducing testing lab at NMY SAHIYAPUR | 08-Aug-2019 02:00 PM | 1235.97 | | |
236 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370213_2 | | const of canteen /dhaba, kisan swagat kaksh, help booth desk, tiolet, amul/parag booth sell conunter ,(dormitory cost work), 01 no. enterance, rain water harvesting ,outer severage system cons work, sheet replacing of APF, repairing /painting of cons | 26-Aug-2019 02:00 PM | 1271.28 | | |
237 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370259_2 | | const of 01 no enam office and pesticide reducing testing lab at NMY SAHIYAPUR | 26-Aug-2019 02:00 PM | 1235.97 | | |
238 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_377978_1 | | Repailring work in NMY Naugarh office building shops gate and gate pillars B wall APF pump house canteen bank building int roadtype I II III etc | 09-Sep-2019 02:00 PM | 1466.87 | | |
239 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370213_3 | | const of canteen /dhaba, kisan swagat kaksh, help booth desk, tiolet, amul/parag booth sell conunter ,(dormitory cost work), 01 no. enterance, rain water harvesting ,outer severage system cons work, sheet replacing of APF, repairing /painting of cons | 09-Sep-2019 02:00 PM | 1271.28 | | |
240 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370259_3 | | const of 01 no enam office and pesticide reducing testing lab at NMY SAHIYAPUR | 09-Sep-2019 02:00 PM | 1235.97 | | |
241 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409560_1 | | Rep of link road MENHDAWAL MARG TO NANDAUR | 05-Dec-2019 02:00 PM | 250.00 | | |
242 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409521_1 | | Rep of link road Salehpur barihwa PWD marg to kanchanpur | 05-Dec-2019 02:00 PM | 250.00 | | |
243 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409562_1 | | Rep of link road AGYA TO BASDILA | 05-Dec-2019 02:00 PM | 250.00 | | |
244 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370213_4 | | const of canteen /dhaba, kisan swagat kaksh, help booth desk, tiolet, amul/parag booth sell conunter ,(dormitory cost work), 01 no. enterance, rain water harvesting ,outer severage system cons work, sheet replacing of APF, repairing /painting of cons | 23-Sep-2019 02:00 PM | 1271.28 | | |
245 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370259_4 | | const of 01 no enam office and pesticide reducing testing lab at NMY SAHIYAPUR | 23-Sep-2019 02:00 PM | 1235.97 | | |
246 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370213_5 | | const of canteen /dhaba, kisan swagat kaksh, help booth desk, tiolet, amul/parag booth sell conunter ,(dormitory cost work), 01 no. enterance, rain water harvesting ,outer severage system cons work, sheet replacing of APF, repairing /painting of cons | 09-Oct-2019 02:00 PM | 1271.28 | | |
247 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370259_5 | | const of 01 no enam office and pesticide reducing testing lab at NMY SAHIYAPUR | 09-Oct-2019 02:00 PM | 1235.97 | | |
248 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_388987_1 | | Complete drawings designs and estimate job for construction of a Navin Mandi Yard at Shohratgarh, Siddharthanagar | 10-Oct-2019 02:00 PM | 250.00 | | |
249 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370213_6 | | const of canteen /dhaba, kisan swagat kaksh, help booth desk, tiolet, amul/parag booth sell conunter ,(dormitory cost work), 01 no. enterance, rain water harvesting ,outer severage system cons work, sheet replacing of APF, repairing /painting of cons | 18-Oct-2019 02:00 PM | 1271.28 | | |
250 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370259_6 | | const of 01 no enam office and pesticide reducing testing lab at NMY SAHIYAPUR | 18-Oct-2019 02:00 PM | 1235.97 | | |
251 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_388987_2 | | Complete drawings designs and estimate job for construction of a Navin Mandi Yard at Shohratgarh, Siddharthanagar | 28-Oct-2019 02:00 PM | 250.00 | | |
252 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370213_7 | | const of canteen /dhaba, kisan swagat kaksh, help booth desk, tiolet, amul/parag booth sell conunter ,(dormitory cost work), 01 no. enterance, rain water harvesting ,outer severage system cons work, sheet replacing of APF, repairing /painting of cons | 29-Oct-2019 02:00 PM | 1271.28 | | |
253 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370259_7 | | const of 01 no enam office and pesticide reducing testing lab at NMY SAHIYAPUR | 29-Oct-2019 02:00 PM | 1235.97 | | |
254 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397025_1 | | link road Basti domariaganj road to main road to Ausapur pipra | 01-Nov-2019 02:00 PM | 250.00 | | |
255 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397030_1 | | Link road Rayath lahrauli piprakala siyaradeyi hote huye Suruwar Awwal rep work | 01-Nov-2019 02:00 PM | 250.00 | | |
256 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409608_1 | | Rep of link road Bhadibujurg to Ausapur | 05-Dec-2019 02:00 PM | 250.00 | | |
257 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409667_1 | | Link road Sringinari Vikramjot to Farenda rep work | 05-Dec-2019 02:00 PM | 250.00 | | |
258 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409778_1 | | Rep of link road PACHBAS TO ATRAULA | 05-Dec-2019 02:00 PM | 250.00 | | |
259 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397445_1 | | R/ m Link road Basti Kalwari marg to Sitarampur via Kharauwa | 01-Nov-2019 02:00 PM | 250.00 | | |
260 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397498_1 | | Rep of link road N H TO LATE AWADHESH SINGH HOUSE VIA JAMAULIA DANT NAGAR | 01-Nov-2019 02:00 PM | 250.00 | | |
261 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397511_1 | | Rep of Link road Manjhari to Kalanderpur | 01-Nov-2019 02:00 PM | 291.84 | | |
262 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397523_1 | | Rep of link road Rudhauli Bakhira marg to Vijaharduha | 01-Nov-2019 02:00 PM | 298.93 | | |
263 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_397550_1 | | Rep work of Janta U M. Vidyalaya Dharmsinghwa to gram Chhibara | 05-Nov-2019 02:00 PM | 250.00 | | |
264 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_398902_1 | | Rep work of Rudhauli Bakhira marg to Karma Kala | 05-Nov-2019 02:00 PM | 256.75 | | |
265 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_398966_1 | | Rep of link road katayi mill Magagar to Asharfabad | 05-Nov-2019 02:00 PM | 250.00 | | |
266 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_398982_1 | | REP OF LINK ROAD SALEHPUR BAIRHWA MARG PWD MARG TO KANCHANPUR | 05-Nov-2019 02:00 PM | 250.00 | | |
267 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399004_1 | | REP OF LINK ROAD MENHDAWAL MARG TO NANDAUR | 05-Nov-2019 02:00 PM | 250.00 | | |
268 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399019_1 | | REP OF LINK ROAD AGYA TO BASDILA | 05-Nov-2019 02:00 PM | 250.00 | | |
269 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399060_1 | | REP OF LINK ROAD HATWA PITCH ROAD TO MAHADEWA MAHULI | 05-Nov-2019 02:00 PM | 250.00 | | |
270 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399112_1 | | REP WORK OF PIRAILA GOAN TO SHIVMANDIR | 08-Nov-2019 02:00 PM | 250.00 | | |
271 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399137_1 | | REP WORK OFO LINK ROAD TENUHAAR TO NAGA BABA KUTI | 08-Nov-2019 02:00 PM | 250.00 | | |
272 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399146_1 | | REP OF LINK ROAD HISAMUDDIN PMGSY TO PATHAPURWA PAKKI SADAK | 08-Nov-2019 02:00 PM | 250.00 | | |
273 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399152_1 | | REOP OF LINK ROAD PMGSY TO PANCHAYAT GHAR VIA PEDARI MUSTAHKAM | 08-Nov-2019 02:00 PM | 250.00 | | |
274 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399193_1 | | REP WORK OF LINK ROAD FATTEPU PWD MARG TO DIHWA PEDARI | 08-Nov-2019 02:00 PM | 250.00 | | |
275 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399202_1 | | rep work of link road Biskohar parsohan ghat to Imiliya | 08-Nov-2019 02:00 PM | 568.57 | | |
276 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399217_1 | | Rep work of link road Itwa Biskohar marg to Heerkhas Sikri | 08-Nov-2019 02:00 PM | 612.26 | | |
277 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399246_1 | | REP WOR OF LINK ROAD BADHANI CHAFA MARG TO DHARAMPUR | 08-Nov-2019 02:00 PM | 250.00 | | |
278 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399257_1 | | REP WORK OF LINK ROAD MAHMUDWA GRANT MAJRA SANGWAKHAS | 08-Nov-2019 02:00 PM | 250.00 | | |
279 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399236_1 | | rep work of link road sarpoka mahri pipri patila main road to Govindpur sri Girish mishra house | 08-Nov-2019 02:00 PM | 250.00 | | |
280 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399564_1 | | rep work of link road JIGNIHWA CHETIA URWALIA MARG TO BARAHRA | 08-Nov-2019 02:00 PM | 250.00 | | |
281 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399727_1 | | rep work of link road BANSI ITWA ROAD TO SEKHUIYA AMBEDKAR GRAM | 08-Nov-2019 02:00 PM | 250.00 | | |
282 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_399755_1 | | REP OF LINK ROAD ON DIDAYI GHHOSIYARI ROAD GHUMCHI TO KHAIRATY POKHRA VIA SONAURA | 08-Nov-2019 02:00 PM | 250.00 | | |
283 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370213_8 | | const of canteen /dhaba, kisan swagat kaksh, help booth desk, tiolet, amul/parag booth sell conunter ,(dormitory cost work), 01 no. enterance, rain water harvesting ,outer severage system cons work, sheet replacing of APF, repairing /painting of cons | 08-Nov-2019 02:00 PM | 1271.28 | | |
284 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370259_8 | | const of 01 no enam office and pesticide reducing testing lab at NMY SAHIYAPUR | 08-Nov-2019 02:00 PM | 1235.97 | | |
285 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_388987_3 | | Complete drawings designs and estimate job for construction of a Navin Mandi Yard at Shohratgarh, Siddharthanagar | 08-Nov-2019 02:00 PM | 250.00 | | |
286 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370213_9 | | const of canteen /dhaba, kisan swagat kaksh, help booth desk, tiolet, amul/parag booth sell conunter ,(dormitory cost work), 01 no. enterance, rain water harvesting ,outer severage system cons work, sheet replacing of APF, repairing /painting of cons | 03-Dec-2019 02:00 PM | 1106.81 | | |
287 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409399_1 | | Rep of link road Janta u m vidyalay dharmsinghwa to gram Chhibara | 05-Dec-2019 02:00 PM | 250.00 | | |
288 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409628_1 | | link road Basti domariaganj road to main road to Ausapur pipra | 05-Dec-2019 02:00 PM | 250.00 | | |
289 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409655_1 | | Link road Rayath lahrauli piprakala siyaradeyi hote huye Suruwar Awwal rep work | 05-Dec-2019 02:00 PM | 250.00 | | |
290 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_409785_1 | | Rep of link road BASTI KALWARI MARG TO SITARAMPUR VIA KHARAUWA | 05-Dec-2019 02:00 PM | 250.00 | | |
291 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410100_1 | | Rep of link road HISAMUDDIN PMGSY MARG TO PATHARPURWA PAKKI SADAK | 05-Dec-2019 02:00 PM | 250.00 | | |
292 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410107_1 | | Rep of link road P M SADAK YOJNA TO PANCHAYAT GHAR VIA PEDARI MUSTAHKAM | 05-Dec-2019 02:00 PM | 250.00 | | |
293 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_553167_2 | | Repairing of link road Nauwa goan chauraha to Kaithwalia | 03-Mar-2021 02:00 PM | 250.00 | | |
294 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_623035_1 | | R/M link road EKDANGA TO NIPANIYA | 22-Sep-2021 01:00 PM | 250.00 | | |
295 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_623061_1 | | R/M link road ON DHANGHATA SIKRIGANJ MARG 9TH KM TO SIRSI | 22-Sep-2021 01:00 PM | 250.00 | | |
296 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410115_1 | | Rep of link road SARPOKA PIPRI MAHRI PATILA MAIN ROAD TO GRAM GOVINDPUR SRI GIRISH MISHRA HOUSE | 05-Dec-2019 02:00 PM | 250.00 | | |
297 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410118_1 | | Rep of link road BARHNI CHAFA MARG TO DHAURAHRA URF DHARMPUR | 05-Dec-2019 02:00 PM | 250.00 | | |
298 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410136_1 | | Rep of link road JIGINIHWA CHETIA URWALIA MARG TO BARAHRA AMBEDKAR GRAM | 05-Dec-2019 02:00 PM | 250.00 | | |
299 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_410140_1 | | Rep of link road ON DIDAYI GHOSIYARI MARG GHUMCHI TO KHAIRAYI POKHRA VIA SONAUR BAIRIHWA | 05-Dec-2019 02:00 PM | 250.00 | | |
300 | SE Zone-3||Dy Director Construction, Basti | 2019_RKUMP_370213_10 | | const of canteen /dhaba, kisan swagat kaksh, help booth desk, tiolet, amul/parag booth sell conunter ,(dormitory cost work), 01 no. enterance, rain water harvesting ,outer severage system cons work, sheet replacing of APF, repairing /painting of cons | 16-Dec-2019 02:00 PM | 1106.81 | | |
301 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_428415_1 | | Rep of link road Biskohar Parsohan ghat to Imiliyahdi Hasan house | 04-Feb-2020 02:00 PM | 250.00 | | |
302 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_433133_1 | | const of boundary wall gate and gate pillar and earth filling at NMY SHOHRATGARH | 10-Feb-2020 02:00 PM | 1107.59 | | |
303 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_433133_2 | | const of boundary wall gate and gate pillar and earth filling at NMY SHOHRATGARH | 19-Feb-2020 02:00 PM | 1107.59 | | |
304 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_445829_1 | 02 | NAVEEN FAL SABJI MANDI DAKHIN DARWAJA PURNI BASTI KA SAFAI KARYA | 09-Mar-2020 02:00 PM | 250.00 | | |
305 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_433133_3 | | const of boundary wall gate and gate pillar and earth filling at NMY SHOHRATGARH | 14-Mar-2020 02:00 PM | 1107.59 | | |
306 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_449539_1 | | construction of saucer drain, 1nos gaurd room, 01 no store room etc and inst of pipeline at NMY Sahiyapur | 18-Mar-2020 02:00 PM | 343.68 | | |
307 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_466533_1 | | c/o boundary wall gate and gate pillar and earth filling at NMY shohratgarh | 06-May-2020 06:00 PM | 1107.59 | | |
308 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471176_1 | | c/ o link road IN SIRSI SHIVPRASAD RAI HOUSE TO TUFANI NAYI HOUSE C.C. WORK | 18-May-2020 09:00 AM | 250.00 | | |
309 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471247_1 | | c/ o link road IN gram kolhugarha junior school to main pitch road | 18-May-2020 09:00 AM | 266.29 | | |
310 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_470704_1 | | const of saucer drain 1 no gaurd room 1 no stoer room and pipe line work at NMY SAHIAPUR | 18-May-2020 10:00 AM | 333.79 | | |
311 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_466533_2 | | c/o boundary wall gate and gate pillar and earth filling at NMY shohratgarh | 19-May-2020 09:00 AM | 1107.59 | | |
312 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_473734_1 | | at Nmy sahiapur APF(12X88 ) AND (9X40) MTR SHEET REPLACEMENT REPAIRING WORK 1NO 200 MT GODOWN and 1000 MT GODOWN REPAIRING WORK and PRIOR CONSTRUCTED A CLASS SHOPS 15 NOS B cLASS SHOPS 20 NOS C CLASS SHOPS 11 NOS 1 NOS BANK 01 NOADMINISTRATIVE | 23-May-2020 10:00 AM | 1297.63 | | |
313 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_490521_1 | | const of saucer drain 1 no gaurd room 1 no store room and pipe line work at NMY SAHIAPUR | 11-Jul-2020 02:00 PM | 333.79 | | |
314 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_490536_1 | | APF(12X88 ) AND (9X40) MTR SHEET REPLACEMENT and REPAIRING WORK 1NO. 200 MT GODOWN 1000 MT GODOWN REPAIRING WORK PRIOR CONSTRUCTED A CLASS SHOPS 15 NOS B cLASS SHOPS 20 NOS C CLASS SHOPS 11 NOS. 1 NOS BANK 01 NO ADMINISTRATIVE BUILDING 02 NOS | 11-Jul-2020 02:00 PM | 1297.63 | | |
315 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_490536_2 | | APF(12X88 ) AND (9X40) MTR SHEET REPLACEMENT and REPAIRING WORK 1NO. 200 MT GODOWN 1000 MT GODOWN REPAIRING WORK PRIOR CONSTRUCTED A CLASS SHOPS 15 NOS B cLASS SHOPS 20 NOS C CLASS SHOPS 11 NOS. 1 NOS BANK 01 NO ADMINISTRATIVE BUILDING 02 NOS | 07-Aug-2020 02:00 PM | 1297.63 | | |
316 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_490521_2 | | const of saucer drain 1 no gaurd room 1 no store room and pipe line work at NMY SAHIAPUR | 07-Aug-2020 02:00 PM | 333.79 | | |
317 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_490536_3 | | APF(12X88 ) AND (9X40) MTR SHEET REPLACEMENT and REPAIRING WORK 1NO. 200 MT GODOWN 1000 MT GODOWN REPAIRING WORK PRIOR CONSTRUCTED A CLASS SHOPS 15 NOS B cLASS SHOPS 20 NOS C CLASS SHOPS 11 NOS. 1 NOS BANK 01 NO ADMINISTRATIVE BUILDING 02 NOS | 26-Aug-2020 02:00 PM | 1297.63 | | |
318 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_490521_3 | | const of saucer drain 1 no gaurd room 1 no store room and pipe line work at NMY SAHIAPUR | 26-Aug-2020 02:00 PM | 333.79 | | |
319 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471147_2 | | C/O GAON SAKHI GORYAGHAT TO PIDIYA BELAHRA CHAURAHA | 03-Sep-2020 02:00 PM | 1246.41 | | |
320 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471176_2 | | c/ o link road IN SIRSI SHIVPRASAD RAI HOUSE TO TUFANI NAYI HOUSE C.C. WORK | 03-Sep-2020 02:00 PM | 250.00 | | |
321 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471247_2 | | c/ o link road IN gram kolhugarha junior school to main pitch road | 03-Sep-2020 02:00 PM | 266.29 | | |
322 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471263_2 | | c/ o link road gram panchayat pikaura pashchimi to nhogipur | 03-Sep-2020 02:00 PM | 250.48 | | |
323 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471147_3 | | C/O GAON SAKHI GORYAGHAT TO PIDIYA BELAHRA CHAURAHA | 29-Sep-2020 02:00 PM | 1246.41 | | |
324 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471263_3 | | c/ o link road gram panchayat pikaura pashchimi to bhogipur | 29-Sep-2020 02:00 PM | 250.48 | | |
325 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471176_3 | | c/ o link road IN SIRSI SHIVPRASAD RAI HOUSE TO TUFANI NAYI HOUSE C.C. WORK | 29-Sep-2020 02:00 PM | 250.00 | | |
326 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471247_3 | | c/ o link road IN gram kolhugarha junior school to main pitch road | 29-Sep-2020 02:00 PM | 266.29 | | |
327 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_471176_4 | | c/ o link road IN SIRSI SHIVPRASAD RAI HOUSE TO TUFANI NAYI HOUSE C.C. WORK | 16-Oct-2020 02:00 PM | 250.00 | | |
328 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_466533_3 | | c/o boundary wall gate and gate pillar and earth filling at NMY shohratgarh | 04-Dec-2020 02:00 PM | 1107.59 | | |
329 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_538894_1 | | const of link road Nandaur Bansi PWD road to Goithaha via layer form 1.20 km | 21-Dec-2020 02:00 PM | 403.77 | | |
330 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_543581_1 | | CONST OF LINK ROAD MASINA NAHAR KI PATARI EVAM RAMWAPUR BARAHPUR | 06-Jan-2021 02:00 PM | 250.00 | | |
331 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_552969_1 | | Repairing of Khunkhun Chauraha Domariaganj marg to Jakhaulikhas | 10-Feb-2021 02:00 PM | 250.00 | | |
332 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_553178_1 | | Repairing of link road BASI DUDHARA CHAURAHA TO MADAARPUR TO LAUKI LAUKA | 10-Feb-2021 02:00 PM | 281.04 | | |
333 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_538894_2 | | const of link road Nandaur Bansi PWD road to Goithaha via layer form 1.20 km | 11-Feb-2021 02:00 PM | 403.77 | | |
334 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_558481_1 | 1555/1 | Transportaion and Handling Work of Wheat Purchase 2021-2022 At Sub Mandi Center basti | 23-Feb-2021 05:00 PM | 250.00 | | |
335 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_558548_1 | 1555/2 | Transportaion and Handling Work of Wheat Purchase 2021-2022 At Sub Mandi Center Balrampur | 23-Feb-2021 05:00 PM | 250.00 | | |
336 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_558560_1 | 1555/3 | Transportaion and Handling Work of Wheat Purchase 2021-2022 At Sub Mandi Center khalilabad | 23-Feb-2021 05:00 PM | 250.00 | | |
337 | SE Zone-3||Dy Director Construction, Basti | 2020_RKUMP_538894_3 | | const of link road Nandaur Bansi PWD road to Goithaha via layer form 1.20 km | 03-Mar-2021 02:00 PM | 403.77 | | |
338 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_558481_2 | 1555/1 | Transportaion and Handling Work of Wheat Purchase 2021-2022 At Sub Mandi Center basti | 10-Mar-2021 03:00 PM | 250.00 | | |
339 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_558560_2 | 1555/3 | Transportaion and Handling Work of Wheat Purchase 2021-2022 At Sub Mandi Center khalilabad | 10-Mar-2021 03:00 PM | 250.00 | | |
340 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_649268_1 | | R/M link road ITWA BELWA MARG TO Bharbharsantha | 30-Nov-2021 11:00 AM | 250.00 | | |
341 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_649289_1 | | R/M link road ITWA Bansi marg to Majhauwa | 30-Nov-2021 11:00 AM | 250.00 | | |
342 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_558548_2 | 1555/2 | Transportaion and Handling Work of Wheat Purchase 2021-2022 At Sub Mandi Center Balrampur | 18-Mar-2021 10:00 AM | 250.00 | | |
343 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_558481_3 | 1555/1 | Transportaion and Handling Work of Wheat Purchase 2021-2022 At Sub Mandi Center basti | 19-Mar-2021 10:00 AM | 250.00 | | |
344 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_558560_3 | 1555/3 | Transportaion and Handling Work of Wheat Purchase 2021-2022 At Sub Mandi Center khalilabad | 19-Mar-2021 10:00 AM | 250.00 | | |
345 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_558548_3 | 1555/2 | Transportaion and Handling Work of Wheat Purchase 2021-2022 At Sub Mandi Center Balrampur | 26-Mar-2021 10:00 AM | 250.00 | | |
346 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_612275_1 | | const of Link road Nandaur Bansi PWD road to Goithaha via Layer form Length 1.20 km | 23-Aug-2021 02:00 PM | 403.77 | | |
347 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_620000_1 | etender 01 | HANDLING WORK FORPADDY PURCHASE CENTER AS NMY BASTI MANDI | 16-Sep-2021 03:00 PM | 250.00 | | |
348 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_620372_1 | E-Tender/handling 2021-22-02 | HANDLING WORK FORPADDY PURCHASE CENTER AS NMY KHALILABAD MANDI | 16-Sep-2021 03:00 PM | 250.00 | | |
349 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_620386_1 | E-Tender/2021-22-03 | TRANSPORT FOR PADDY PURCHASE CENTRE AS NMY BASTI | 16-Sep-2021 03:00 PM | 250.00 | | |
350 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_620394_1 | TRANSPORT FOR PADDY PURCHASE CENTRE AS KHALILABAD | TRANSPORT FOR PADDY PURCHASE CENTRE AS NMY KHALILABAD | 16-Sep-2021 03:00 PM | 250.00 | | |
351 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_620791_1 | 295/224 dt 13.9.2021 | R/M of link road Faizabad road to Khatamsaray | 21-Sep-2021 06:00 PM | 250.00 | | |
352 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_620814_1 | 296/ 224 dt 13.9.2021 | R/M of link road on Basti road Dasiya to Majhauwa Baikunthpur via Basaukha | 21-Sep-2021 06:00 PM | 250.00 | | |
353 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_621204_1 | 287 REF NO. 224 DT. 13-9-21 | R/M link road ON BANSI NAUGARG MARG SUPARAJA GAON TO SUPAGHAT | 21-Sep-2021 06:00 PM | 250.00 | | |
354 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_622839_1 | | R/M link road ON RUDHAULI MAIN ROAD TILAULI PAIDIKHURD (0-0.70 KM 1.003.88KM)BANSI NAUGARG MARG SUPARAJA GAON TO SUPAGHAT | 22-Sep-2021 10:00 AM | 466.92 | | |
355 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_622879_1 | | R/M link road SAPTI BELAHRI PWD MARG TO RAJEDIHA DHARMSNGHWA GRAM SIKRI ANUSUCHIT BASTI TAK | 22-Sep-2021 10:00 AM | 311.47 | | |
356 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_621191_1 | 285 ref no 224 dt 13-9-21 | R/M link road ON ITWA BELWA MARG TIKUIYA PARSA MARG TO BAHADURPUR | 22-Sep-2021 11:00 AM | 250.00 | | |
357 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_622999_1 | | R/M link road MARWATIA HEAD MINOR TO USMANPUR PAKKI SADAK TAK NAHAR KI PATRI | 22-Sep-2021 12:00 PM | 292.94 | | |
358 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_623017_1 | | R/M link road KHALILABAD MUKHLISPUR MAIN ROAD TO GANESH YADAV KE PURWA | 22-Sep-2021 12:00 PM | 250.00 | | |
359 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_623044_1 | | R/M link road DABRA PARSA SHUKL MARG TO GRAM SIKRI PITCH ROAD VIA NAHAR KI PATRI GRAM KHAJURI | 22-Sep-2021 01:00 PM | 250.00 | | |
360 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_623075_1 | | R/M link road KHALILABAD NATH NAGAR MARG TO GAJPUR PAKKI SADAK VIA KATAHARIYA | 22-Sep-2021 02:00 PM | 250.00 | | |
361 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_622839_2 | | R/M link road ON RUDHAULI MAIN ROAD TILAULI PAIDIKHURD (0.00 km-0.70 KM 1.00km-3.88KM) | 02-Oct-2021 02:00 PM | 466.92 | | |
362 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_621191_2 | 285 ref no 224 dt 13-9-21 | R/M link road ON ITWA BELWA MARG TIKUIYA PARSA MARG TO BAHADURPUR | 02-Oct-2021 02:00 PM | 250.00 | | |
363 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_634682_1 | 380/22-10-2021 | HANDLING WORK FORPADDY PURCHASE CENTER AS NMY KHALILABAD MANDI | 23-Oct-2021 02:00 PM | 250.00 | | |
364 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_634702_1 | 381/2021-22 | TRANSPORT FOR PADDY PURCHASE CENTRE AS NMY KHALILABAD | 23-Oct-2021 02:00 PM | 250.00 | | |
365 | SE Zone-3||Dy Director Construction, Basti | 2021_RKUMP_649277_1 | | R/M link road Jhakahia kathela chetia marg per dhobaha tola Agardeeh | 30-Nov-2021 11:00 AM | 295.04 | | |
Total | | | | | | 141624.18 | | |