SN | Orgnization | Tender Id | Tender Reference No | Tender Title | PublishedDate | Amount(UPLC Charges) | Payment | Payment Detail |
1 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_102963_1 | 924A-1 | Reapairing of L/R Etah Kasganj Road to Kaseti. (L- 0.540 Km) | | 294.98 | | |
2 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103006_1 | 924A-12 | Reapairing of L/R Etah Tundla Etah Road to Nasirpur. (L- 0.987 Km) | | 250.00 | | |
3 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103048_1 | 924B-3 | Reapairing of L/R Bijouri To Ahmadpur khurd. (L- 1.350 Km) | | 250.00 | | |
4 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_96196_2 | 873-6 | Reapairing of L/R Tada Road to Bhood Gaddha Sundarpur. (L- 2.00Km) | | 250.00 | | |
5 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_97366_2 | 881-5 | Repaire of L.R. From Behta to Dwarika Basawanpur. (L- 1.830Km) | | 250.00 | | |
6 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_97380_2 | 881-9 | Repaire of L.R. From Sidhpura Dhumari Road to Khajura. (L- 3.080Km) | | 693.12 | | |
7 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107711_1 | 988A-12 | Reapairing of L/R Bondar to Aladinpur Via Nagla Murli (L- 1.500Km) | | 250.00 | | |
8 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107793_1 | 988B-2 | Reapairing of L/R Mohanpur Sidhhpura Road to Prahladchak. (L- 1.200Km) | | 250.00 | | |
9 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_102965_2 | 924A-2 | Reapairing of L/R Etah Etah Amanpur Road to Nagla Sambhal. (L- 0.850 Km) | | 250.00 | | |
10 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103100_2 | 924B-7 | Reapairing of L/R Etah Baniya Dhahra to Gousalpura. (L- 1.866 Km) | | 250.00 | | |
11 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_97380_3 | 881-9 | Repairing of L/R Validadpur to Silamai Road. (L.-1.000) | | 250.00 | | |
12 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107501_2 | 988A-5 | Reapairing of L/R Taiyabpur to Naugawan. (L- 1.650Km) | | 250.00 | | |
13 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107823_2 | 988B-6 | Reapairing of L/R Bahoranpur To Karampur. (L- 2.900Km) | | 250.00 | | |
14 | SE Zone-4||Dy Director Construction, Etah | 2020_RKUMP_540696_1 | 768(2)/24.12.20 | Repaire of Link Road KasGanj to Ahrouli. | 26-Dec-2020 10:00 AM | 434.22 | | |
15 | SE Zone-4||Dy Director Construction, Etah | 2020_RKUMP_540700_1 | 768(4)/24.12.20 | Repaire of Link Road Bheekampur to Haiwatpur. | 26-Dec-2020 10:00 AM | 250.00 | | |
16 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107841_2 | 988B-7 | Reapairing of L/R Sidhpura Patiyali Rod to Bahadurnagar. (L- 3.300Km) | | 374.39 | | |
17 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_140840_2 | 1515A-1 | Reapairing of Internal Road in N.M.Y. Kasganj | | 2401.73 | | |
18 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_166343_1 | | Reapairing of Internal Road in N.M.Y. Kasganj | | 2401.73 | | |
19 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_223577_2 | 234 | Supply and fixing of sign board at district Kasganj | 13-Jul-2018 10:00 AM | 250.00 | | |
20 | SE Zone-4||Dy Director Construction, Etah | 2020_RKUMP_540697_1 | 768(3)/24.12.20 | Repaire of Link Road Mijkhuri to Ranjeetpur. | 26-Dec-2020 10:00 AM | 250.00 | | |
21 | SE Zone-4||Dy Director Construction, Etah | 2020_RKUMP_540701_1 | 768(5)/24.12.20 | Repaire of Link Road Asadgarh to Niviya. | 26-Dec-2020 10:00 AM | 264.76 | | |
22 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_542707_1 | 818(4)/01.01.2021 | Repaire of Link Road Awagarh to Surayaa. | 04-Jan-2021 10:00 AM | 269.16 | | |
23 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_542710_1 | 818(6)/01.01.2021 | Repaire of Link Road Nagla Dharu to Udesar. | 04-Jan-2021 10:00 AM | 250.00 | | |
24 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107750_1 | 988A-15 | Reapairing of L/R Kasganj Amanpur Road to Sailai. (L- 5.650Km) | | 250.00 | | |
25 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107760_1 | 988A-16 | Reapairing of L/R Etah Kasganj Road to Faridpur. (L- 0.550Km) | | 250.00 | | |
26 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107774_1 | 988B-1 | Reapairing of L/R Nagla Kothi to Nainsukh. (L- 0.900Km) | | 250.00 | | |
27 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107807_1 | 988B-4 | Reapairing of L/R Sadikpur To Nagla Kaiyan. (L- 1.020Km) | | 250.00 | | |
28 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107815_1 | 988B-5 | Reapairing of L/R Gadka Road to Mouhariya. (L- 1.930Km) | | 250.00 | | |
29 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103109_2 | 924C-4 | Reapairing of L/R Nagla dharu to Udesar. (L- 3.800 Km) | | 250.00 | | |
30 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103111_2 | 924C-5 | Reapairing of L/R Eka Basundhara Road to Jodhpur. (L- 0.780 Km) | | 250.00 | | |
31 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_102984_2 | 924-A6 | Reapairing of L/R Sakit Oncha Road to Gadhiya. (L- 1.050 Km) | | 250.00 | | |
32 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103096_2 | 924B-5 | Reapairing of L/R jaithra Kurawali Road to Targawan. (L- 0.703 Km) | | 250.00 | | |
33 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103101_2 | 924B-8 | Reapairing of L/R Harshinghpur to Fardpura. (L- 1.388 Km) | | 250.00 | | |
34 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103108_2 | 924C-3 | Reapairing of L/R Ikhu to Rudrapur. (L- 3.600 Km) | | 250.00 | | |
35 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_96259_3 | 873-7 | Reapairing of L/R Uncha goan to Nagla Prathvi. (L- 1.364Km) | | 250.00 | | |
36 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_102967_1 | 924A-3 | Reapairing of L/R Sakit Oncha Road to Jahangeerabad. (L- 0.850 Km) | | 250.00 | | |
37 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_102990_1 | 924A-7 | Reapairing of L/R Nagla Madhiya to Rarpatti. (L- 1.050 Km) | | 250.00 | | |
38 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_102991_1 | 924A-8 | Reapairing of L/R Lamheta to Koyanaa. (L- 1.473 Km) | | 250.00 | | |
39 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_102995_1 | 924A-9 | Reapairing of L/R Etah Aliganj Road Jisukhpur to Kason.. (L- 1.600 Km) | | 250.00 | | |
40 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103016_1 | 924A-15 | Reapairing of L/R Etah Mohabbatpur to Rasidpur. (L- 0.550 Km) | | 250.00 | | |
41 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103031_1 | 924B-2 | Reapairing of L/R Patiyali Aliganj Road to Nagla Mansingh. (L- 2.010 Km) | | 405.50 | | |
42 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_96024_2 | 873-2 | Reapairing of L/R Aliganj Road to Gadhiyahar. (L- 0.700Km) | | 250.00 | | |
43 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_96154_2 | 873-4 | Reapairing of L/R Dhumari Sidhpura Road to Nagla Baldev. (L- 1.972Km) | | 250.00 | | |
44 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_96179_2 | 873-5 | Reapairing of L/R Kheriema to Nagla Baniya. (L- 1.55Km) | | 250.00 | | |
45 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_97352_3 | 881-3 | Repaire of L.R. From Neoli Tarapur Road to Satay Junaardar. (L- 0.600Km) | | 250.00 | | |
46 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107380_2 | 988A-1 | Reapairing of L/R Gorha Bahediya Road to Loharra. (L- 0.560Km) | | 250.00 | | |
47 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107474_2 | 988A-3 | Reapairing of L/R Kasrsari Andauaa Road to Mubarikpur Mafi. (L- 0.920Km) | | 250.00 | | |
48 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_96287_2 | 873-9 | Reapairing of L/R Hathras Jalesar Road to Gadai. (L- 0.943Km) | | 250.00 | | |
49 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_97345_2 | 881-2 | Repaire of L.R. From Amanpur Sahawar Road to Boda Nagariya. (L- 4.500Km) | | 360.32 | | |
50 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_97373_2 | 881-7 | Repaire of L.R. From Amanpur Mohanpur Road to Nagla Bhimsen.. (L- 1.400Km) | | 250.00 | | |
51 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_97376_2 | 881-8 | Repaire of L.R. From Ganjdundwara Road to Sultanpur. (L- 1.187Km) | | 250.00 | | |
52 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_97338_1 | 881-1 | Repaire of Link Road | | 250.00 | | |
53 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_97363_1 | 881-4 | REPAIRE OF LINK ROAD | | 250.00 | | |
54 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_97371_1 | 881-6 | REPAIRE OF LINK ROAD | | 250.00 | | |
55 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_102970_1 | 924A-4 | (A) Reapairing of L/R Junior High School to Kansuri Puliya. (L- 0.885 Km) (B) Reapairing of L/R Jaitpur To Daspur. (L- 1.858 Km) | | 250.00 | | |
56 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_102999_1 | 924A-10 | (A) Reapairing of L/R Etah Shikohabad Road to rijor Road to Mahgani. (L- 1.540 Km) (B) Reapairing of L/R Ram Nagla to Sarfuddin Husainpur. (L- 2.669 KM) | | 250.00 | | |
57 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103004_1 | 924A-11 | Reapairing of L/R Nidhauli Nagariya Road to Nagla bhud Songara. (L- 1.300 Km) | | 250.00 | | |
58 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107455_1 | 988A-2 | Reapairing of L/R Bachhmai to Binpur Via Nagla Moti. (L- 0.600Km) | | 250.00 | | |
59 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107487_1 | 988A-4 | Reapairing of L/R Bhogpur to Ghatiyari.. (L- 1.320Km) | | 250.00 | | |
60 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107528_1 | 988A-7 | Reapairing of L/R Kisrouli to Garhi Chinti Nagla.. (L- 5.050Km) | | 428.50 | | |
61 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103010_1 | 924A-13 | Reapairing of L/R Nidhauli Nagariya Road to Nagla bhud Songara. (L- 1.300 Km) | | 250.00 | | |
62 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103014_1 | 924A-14 | Reapairing of L/RShri Ranvir Singh Home to Shri Jograj Home in Village Naya Baansh (L- 0.350 KM) | | 250.00 | | |
63 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103026_1 | 924B-1 | Reapairing of L/R Dhakpura Bhargain Road to Hiraiya Purvi (Dauraiya Purvi). (L- 1.500 Km) | | 292.39 | | |
64 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_96059_2 | 873-3 | Reapairing of L/R Aliganj Dariyabganj kela to Nagla Mathuri Via Nagla Gulla. (L- 1.852Km) | | 250.00 | | |
65 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_96001_2 | 873-1 | Reapairing of L/R Jagatpur (Bhanwarpur) Road to Shikohabad Road. (L- 0.425Km) | | 250.00 | | |
66 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107543_1 | 988A-8 | (A) Reapairing of L/R Nagla Madiya to Nagla Dhansingh. (L- 0.750Km) (B) Reapairing of L/R Nagla Andha to Nagla dhan Singh. (L- 1.750Km) | | 250.00 | | |
67 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107729_1 | 988A-13 | Reapairing of L/R Amanpur Sahawar Road to Banupura Via Farouli. (L- 1.650Km) | | 250.00 | | |
68 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107738_1 | 988A-14 | Reapairing of L/R Gorha Kunwarpur to Shyampur Via Nagla Madhon. (L- 2.200Km) | | 250.00 | | |
69 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103023_2 | 924A-16 | Reapairing of L/R Awagarh Sorkha Road Puthiya to Sahpur Badampur. (L- 2.880 Km) | | 315.92 | | |
70 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103104_2 | 924C-1 | (A) Reapairing of L/R Padam Mustafabad Road to Gauspur Bijendra Singh Home. (L- 0.300 Km) (B)Reapairing of L/R Singhpur to Nagla Dhati (L- 0.500 KM) | | 250.00 | | |
71 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103106_2 | 924C-2 | (A) Reapairing of L/R Suraya Sheeshpul to Mohabbatpul. (L- 1.200 Km) (B) Reapairing of L/R Awagarh to Suraya Rest Part (L- 3.000 KM) | | 250.00 | | |
72 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_102976_2 | 924A-5 | (A) Reapairing of L/R Navada to Shilampura. (L- 0.946 Km) (B) Reapairing of L/R Bewar Branch to Pursari. (L- 1.604 Km) (C) Reapairing of L/R Aliganj Road to 22 KM Gola Kuaa to Kunwarpur Nagriya road . (L- 0.900 Km) | | 250.00 | | |
73 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103051_2 | 924B-4 | (A) Reapairing of L/R Etah Aliganj Road to Nagla Dhampi. (L- 0.685 Km) (B) Repairing of L/R Dhumari Patiyali Road to Nagla Khanjan.(L- 0.509KM) | | 250.00 | | |
74 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_103098_2 | 924B-6 | Reapairing of L/R Aliganj Vilsad Road Via to Hatsari Via Mathui Rampur. (L- 1.000 Km) | | 250.00 | | |
75 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107518_2 | 988A-6 | Reapairing of L/R Etah Kasganj Road to Mubarikpur Sigtara. (L- 2.700Km) | | 250.00 | | |
76 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107579_2 | 988A-9 | Reapairing of L/R Nagriya Gaupura Road to Nagla Nihaali. (L- 0.890Km) | | 250.00 | | |
77 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107802_2 | 988B-3 | Reapairing of L/R Sidhpura Patiyali Road To Jatpura.. (L- 0.490Km) | | 312.44 | | |
78 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107587_2 | 988A-10 | Reapairing of L/R Kasganj Amanpur Road to Karsana to devari. (L- 1.200Km) | | 250.00 | | |
79 | SE Zone-4||Dy Director Construction, Etah | 2017_RKUMP_107694_4 | 988A-11 | Reapairing of L/R Amanpur Rampur Siddhpur Road to Kalyanpur. (L- 0.900Km) | | 250.00 | | |
80 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_140146_1 | 1354-A1 | Construction of Boundry wall 150 Meter AND 12x44 M APF Covered at NMY Etah. | | 603.26 | | |
81 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_140160_1 | 1354A-2 | Construction of CC Road at Lahsun Mandi and Repairing of Old Bank Building and Boundry wall and 02 Nos Toilet and 02 Nos Pump House AND Generator Room at NMY ETAH | | 533.56 | | |
82 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_140851_1 | 1515A-2 | Reapairing of Toilet Block, Water Supply and Water Stand Post, Rebore of 03 Nos Hand Pump, Repaire of Internal Drain (Naala), Construction of 60 M Drain, Repaire of Divider at NMY Kasganj. | | 250.00 | | |
83 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263606_1 | 521-1 | (A) Repaire of Link Road Kasganj Ismailpur Road to Nagla Than to Noukashpur Via Kilouni. (L- 0.460Km) (B) Repaire of Link Road Kasganj Ismailpur to Nagla Than. (L- 0.400Km) | 18-Oct-2018 10:00 AM | 250.00 | | |
84 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263662_1 | 521-2 | Repaire of Link Road Soron Kunwarpur Road to Milkinia. (L- 0.860Km) | 18-Oct-2018 10:00 AM | 250.00 | | |
85 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263664_1 | 521-3 | Repaire of Link Road Amanpur Sidhpura Road to Morcha. (L- 1.490Km) | 18-Oct-2018 10:00 AM | 250.00 | | |
86 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263670_1 | 521-5 | Repaire of Link Road Amanpur Sidhpura Road to Sujrai. (L- 1.000Km) | 18-Oct-2018 10:00 AM | 250.00 | | |
87 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263671_1 | 521-6 | Repaire of Link Road Chakeri pul to Chakeri Road pipal Vai Nagla Mitthu AND Bhura. (L- 2.000Km) | 18-Oct-2018 10:00 AM | 250.00 | | |
88 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263673_1 | 521-7 | Repaire of Link Road Sahawar Ganjdundwara Road to Egwa. (L- 0.500Km) | 18-Oct-2018 10:00 AM | 250.00 | | |
89 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263679_1 | 521-8 | Repaire of Link Road Tumadiya to Gaupura Road Vai Kuhatiya. (L- 1.38Km) | 18-Oct-2018 10:00 AM | 250.00 | | |
90 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263680_1 | 521-9 | Repaire of Link Road Etah Sidhpura Road to Shyampur. (L- 1.220Km) | 18-Oct-2018 10:00 AM | 250.00 | | |
91 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263681_1 | 521-10 | Repaire of Link Road Pithanpur Bhujpura Road to Ambedkar Gram Ganjdundwara Dehat (Firozpur Mafi). (L- 1.500Km) | 18-Oct-2018 10:00 AM | 250.00 | | |
92 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263682_1 | 521-11 | Repaire of Link Road Patiyali Sidhpura Road to Bilouti. (L- 1.950Km) | 18-Oct-2018 10:00 AM | 250.00 | | |
93 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263684_1 | 521-12 | Repaire of Link Road Ganjdundwara Kadarganj Road to Indra Jasanpur. (L- 2.650Km) | 18-Oct-2018 10:00 AM | 267.21 | | |
94 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263686_1 | 521-13 | Repaire of Link Road Bhargain to Nagla Amiir Rest Part. (L- 3.105Km) | 18-Oct-2018 10:00 AM | 312.54 | | |
95 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267006_1 | 590-1 | Repaire of Link Road Amanpur Road to Badhaira. (L- 0.740Km) | 27-Oct-2018 10:00 AM | 250.00 | | |
96 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267013_1 | 590-2 | Repaire of Link Road Achalpur Sarnau Road to Agarpur Vai Shyourai. (L- 2.135Km) | 27-Oct-2018 10:00 AM | 250.00 | | |
97 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267016_1 | 590-3 | Repaire of Link Road Etah Shikohabad Road to Udaypur Via Ghumariya Nagla parsi. (L- 1.600Km) | 27-Oct-2018 10:00 AM | 250.00 | | |
98 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267019_1 | 590-4 | Repaire of Link Road Sakit Malawan Road to Manu Ki Madhaiya to Rewari. (L- 2.150Km) | 27-Oct-2018 10:00 AM | 250.00 | | |
99 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267024_1 | 590-6 | Repaire of L.R. From Lalgarhi to Nagla Udai Vai Rarpatti (L- 1.370Km) | 27-Oct-2018 10:00 AM | 250.00 | | |
100 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267027_1 | 590-7 | Repaire of L.R. From Lalgarhi to Nagla Farid. (L- 1.350Km) | 27-Oct-2018 10:00 AM | 250.00 | | |
101 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267031_1 | 590-8 | Repaire of Link Road Sahawar Road to Sarkari Tuwell Puliya to Ambari. (L- 0.700Km) | 27-Oct-2018 10:00 AM | 250.00 | | |
102 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267035_1 | 590-9 | Repaire of Link Road Sahawar Road to Nagla Madiya. (L- 1.700Km) | 27-Oct-2018 10:00 AM | 250.00 | | |
103 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267043_1 | 590-13 | Repaire of Link Road Jaithra Bhatta to Jirouliya. (L- 1.650Km) | 27-Oct-2018 10:00 AM | 250.00 | | |
104 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267022_2 | 590-5 | Repaire of Link Road Nidhauli Nagariya Road to Kasimpur. (L- 0.700Km) | 27-Oct-2018 10:10 AM | 272.06 | | |
105 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_263667_2 | 521-4 | Repaire of Link Road Athaiya to Narayani. (L- 0.450Km) | 29-Oct-2018 10:00 AM | 250.00 | | |
106 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267037_2 | 590-10 | Repaire of Link Road Etah Aliganj Road to Kachhiyawada Kakoda to Nagla Hansi. (L- 0.720Km) | 05-Nov-2018 10:00 AM | 250.00 | | |
107 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_288192_1 | 905 | Construction of SULABH COMPLEX at N.M.Y. Kasganj. | 27-Dec-2018 04:00 PM | 250.00 | | |
108 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_395538_1 | 634-4 | Repaire of Link Road Marhara to Rasidpur. (L- 0.26 Km) | 24-Oct-2019 10:00 AM | 250.00 | | |
109 | SE Zone-4||Dy Director Construction, Etah | 2020_RKUMP_540694_1 | 768(1)/24.12.20 | Repaire of Link Road Taiyabpur to Naugawan. | 26-Dec-2020 10:00 AM | 250.00 | | |
110 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267041_3 | 590-11 | Repaire of Link Road Bhadki Chaurahe to Kali Nadi Ghat Via Dhakpura Nagla Chandi. (L- 1.450Km) | 16-Nov-2018 10:00 AM | 259.94 | | |
111 | SE Zone-4||Dy Director Construction, Etah | 2018_RKUMP_267042_2 | 590-12 | Repaire of Link Road Aliganj Saray Aghat to KM 06 Nagariya to Aliyapur. (L- 1.900Km) | 16-Nov-2018 10:00 AM | 268.78 | | |
112 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_325171_1 | 1117-1 | Construction of of Pump House, 50 KL OHT and Water Stand Post Supply and Laying of GI Pipe Line at SMY jaithra under NMY Aliganj | 28-Feb-2019 11:00 AM | 250.00 | | |
113 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_325938_1 | 1117-2 | Construction of 5x7 Meter Ded Stock Godown (50 MT) (01 No) and Repairing of Internal Road, APF 9x40M, office Building Repairing and Raising of Boundry wall at SMY Jaithra Under Mandi Samiti Aliganj. | 28-Feb-2019 11:00 AM | 508.67 | | |
114 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_341009_1 | 1230 | Maintenance AND Rebore of 24 Nos India Mark-II Hand Pump At NMY Etah | 29-Mar-2019 10:00 AM | 250.00 | | |
115 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_341182_1 | | Painting AND Colour Washing of APF 9x80 M, 15 Nos C Type Shop, Canteen, Inspection House, AND Contruction of 35 RM Boundry wall AND Making of Strong Room Etc for LOK SABHA ELECTION 2019. At NMY Kasganj | 01-Apr-2019 10:00 AM | 250.00 | | |
116 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_350196_1 | 95-1 | Construction of of Pump House 50 KL OHT and Water Stand Post Supply AND Laying of GI Pipe Line | 03-Jun-2019 06:00 PM | 250.00 | | |
117 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_350211_1 | 95-2 | Construction of 5x7 Meter Ded Stock Godown (50 MT) (01 No) AND Repairing of Internal Road, APF 9x40M office Building Repairing and Raising of Boundry wall at SMY Jaithra Under Mandi Samiti Aliganj. | 03-Jun-2019 06:00 PM | 508.67 | | |
118 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_360116_1 | | Construction of 50 Nos C Type Shops, Approach road and Drain, 02 Nos Urinal Block, 02 Nos Super Market Shop, Laying of Interlocking tile, Replacement of dameged AC Sheet to GI Profile Sheet Maintenance and Colour Washing of Outer Surface 15 Nos A Typ | 03-Jul-2019 10:30 AM | 4010.76 | | |
119 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_360174_1 | 177/26.06.2019 | Construction of 50 Nos C Type Shops, Approach road and Drain, 02 Nos Urinal Block, 02 Nos Super Market Shop, Laying of Interlocking tile, Replacement of dameged AC Sheet to GI Profile Sheet Maintenance and Colour Washing of Outer Surface 15 Nos A Typ | 03-Jul-2019 12:30 PM | 4010.76 | | |
120 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_361162_1 | 189-21.06.2019 | Modernization and Repairing work at N.M.Y. Etah (Construction of E-Name Block, Canteen, Welcome Block, Driver Rest Room and Interlocking Maintenance of 02 Nos Type Ist, 01 Nos Type IIIrd,05 Nos Super Market and Drain, Check Post, Gate and gate Piller | 05-Jul-2019 05:30 PM | 4200.61 | | |
121 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374336_1 | 374-A1 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain and 02 Crossing Culvert etc. in Hot Paith at Village KATHOULI | 22-Aug-2019 10:00 AM | 501.53 | | |
122 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374352_1 | 374-A2 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain and 02 Crossing Culvert etc. in Hot Paith at Village MUIUDDINPUR | 22-Aug-2019 10:00 AM | 455.67 | | |
123 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374396_1 | 374-B1 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain and 02 Crossing Culvert etc. in Hot Paith at Village Jinhera. | 22-Aug-2019 10:00 AM | 489.29 | | |
124 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374405_1 | 374-B2 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain etc. in Hot Paith at Village SIRAWALI | 22-Aug-2019 10:00 AM | 450.88 | | |
125 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374410_1 | 374-B3 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain etc. in Hot Paith at Village KUMRAUA | 22-Aug-2019 10:00 AM | 457.65 | | |
126 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374410_2 | 374-B3 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain etc. in Hot Paith at Village KUMRAUA | 09-Sep-2019 10:00 AM | 457.65 | | |
127 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374336_2 | 374-A1 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain and 02 Crossing Culvert etc. in Hot Paith at Village KATHOULI | 09-Sep-2019 10:00 AM | 501.53 | | |
128 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374352_2 | 374-A2 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain and 02 Crossing Culvert etc. in Hot Paith at Village MUIUDDINPUR | 09-Sep-2019 10:00 AM | 455.67 | | |
129 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374396_2 | 374-B1 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain and 02 Crossing Culvert etc. in Hot Paith at Village Jinhera. | 09-Sep-2019 10:00 AM | 489.29 | | |
130 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374405_3 | 374-B2 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain etc. in Hot Paith at Village SIRAWALI | 09-Sep-2019 10:00 AM | 450.88 | | |
131 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_379888_1 | | CONSTRUCTION OF 02 NOS. RAIN WATER HARVESTING SYSTEM IN N.M.Y. KASGANJ | 12-Sep-2019 10:00 AM | 250.00 | | |
132 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_374410_3 | 374-B3 | Construction of 02 Nos covered shed, Boundry wall, Gate and Gate piller, Toilet, Interlocking Tile, Drain etc. in Hot Paith at Village KUMRAUA | 19-Sep-2019 10:00 AM | 457.65 | | |
133 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_395528_1 | 634-1 | Repaire of Link Road Jaithra aliganj Road to Tigra Bhagoura. (L- 0.85 Km) | 24-Oct-2019 10:00 AM | 250.00 | | |
134 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_395533_1 | 634-2 | Repaire of Link Road Aliganj Amrouli KM 04 to Tapua Road Via Kinoudi. (L- 0.70Km) | 24-Oct-2019 10:00 AM | 250.00 | | |
135 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_395535_1 | 634-3 | Repaire of Link Road Etah Aliganj Road Agraiya to Rari School. (L- 0.400 Km) | 24-Oct-2019 10:00 AM | 250.00 | | |
136 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_401047_1 | 663-1 | Repaire of Link Road Kasganj Mathura Road to Maddupur Rajpur. (L- 2.77Km) | 07-Nov-2019 03:00 PM | 264.18 | | |
137 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_401064_2 | 663-2 | REPAIRE OF LINK ROAD KASGANJ ATROULI ROAD TO JAKHERA L-1.640KM | 07-Nov-2019 03:15 PM | 250.00 | | |
138 | SE Zone-4||Dy Director Construction, Etah | 2019_RKUMP_401084_1 | 663-3 | Repaire of Link Road Amanpur Sidhpura Road to Pratappur. (L- 3.200Km) | 07-Nov-2019 03:15 PM | 364.93 | | |
139 | SE Zone-4||Dy Director Construction, Etah | 2020_RKUMP_540013_1 | 757(1)/22.12.20 | Repaire of Link Road Malawan Souhar Road to Ramnagar. | 23-Dec-2020 10:00 AM | 250.00 | | |
140 | SE Zone-4||Dy Director Construction, Etah | 2020_RKUMP_540016_1 | 757(2)/22.12.20 | Repaire of Link Road Junior High School to Kansuri Puliya. | 23-Dec-2020 10:00 AM | 250.00 | | |
141 | SE Zone-4||Dy Director Construction, Etah | 2020_RKUMP_540018_1 | 757(3)/22.12.20 | Repaire of Link Road Bewar Branch Navada to Pursari. | 23-Dec-2020 10:00 AM | 250.00 | | |
142 | SE Zone-4||Dy Director Construction, Etah | 2020_RKUMP_540020_1 | 757(4)/22.12.20 | Repaire of Link Road Mirechi Marthara Road to Suratpur Mafi. | 23-Dec-2020 10:00 AM | 250.00 | | |
143 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_542703_1 | 818(1)/01.01.2021 | Repaire of Link Road Aliganj Etah Road to Kukraya Ratanpur. | 04-Jan-2021 10:00 AM | 250.00 | | |
144 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_542704_1 | 818(2)/01.01.2021 | Repaire of Link Road Jasrathpur Thana to Nagla Ramsingh. | 04-Jan-2021 10:00 AM | 357.16 | | |
145 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_542706_1 | 818(3)/01.01.2021 | Repaire of Link Road Saray Aghat Tadhigara Road to Bhadki. | 04-Jan-2021 10:00 AM | 250.00 | | |
146 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_542709_1 | 818(5)/01.01.2021 | Repaire of Link Road Suraaya Sheeshpul to Mohabbatpur.(Rest Part). | 04-Jan-2021 10:00 AM | 250.00 | | |
147 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_543346_1 | 836/04.01.2021 | Construction of 02 Nos Drinking Water Room, and Open auction Plateform (12x60)m at NMY KASGANJ. | 05-Jan-2021 10:00 AM | 528.26 | | |
148 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_543908_1 | 845/06.01.2021 | Construction of 14x36m size Open plateform in front of 15Nos C Type Vegetable market , Shops, park boundary wall infront of office , and Conversion mandi Samiti office to Guest House at N.M.Y. Chharra. | 07-Jan-2021 10:00 AM | 679.16 | | |
149 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_545514_1 | 876/12.01.2021 | Construction of Link Road Khava to Khiriya. | 13-Jan-2021 10:00 AM | 416.20 | | |
150 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_546265_1 | 894/15.01.2021 | Repaire of Link Road Mirechi Marthara Road to Suratpur Mafi. | 16-Jan-2021 10:00 AM | 250.00 | | |
151 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_550509_1 | 989/01.02.2021 | Repaire of Link Road Mirechi Marthara Road to Suratpur Mafi. | 02-Feb-2021 10:00 AM | 250.00 | | |
152 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_554248_1 | 352(1)/10.02.2021 | Cleaning of Grain and Vegetable market at N.M.Y. Khair(Aligarh) | 12-Feb-2021 10:00 AM | 250.00 | | |
153 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_554273_1 | 352(2)/10.02.2021 | Cleaning of Sub Mandi Yard Tappal and Gabhana | 12-Feb-2021 10:00 AM | 250.00 | | |
154 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_554510_1 | 1208/11.02.2021 | Cleaning of Grain market, Vegetable market, Fruits market administrative Buldings, Residance colony, Godown at N.M.Y. Aligarh and Cleaning of all Vacant Space Sub mandi yard Harduaganj. | 12-Feb-2021 10:00 AM | 325.07 | | |
155 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_554844_1 | 779(1)/11.02.2021 | Mandi Samiti, cleaning work of all mandi premises like Galla block of Hathras, fruit vegetable block etc. | 13-Feb-2021 10:00 AM | 250.00 | | |
156 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_554870_1 | 779(2)/11.02.2021 | Cleaning work of new sub-mandi iglas and Sasni. | 13-Feb-2021 10:00 AM | 250.00 | | |
157 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_555488_1 | 261/12.02.2021 | Cleaning of Grain market, Vegetable and Fruits market administrative Buldings, Residance colony, Godown all Vacant Space mandi yard Chharra. | 15-Feb-2021 04:00 PM | 250.00 | | |
158 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_555495_1 | 191/12.02.2021 | Cleaning of Grain market, Vegetable and Fruits market administrative Buldings, Residance colony, Godown all Vacant Space mandi yard Atrauli. | 15-Feb-2021 04:00 PM | 250.00 | | |
159 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_556120_1 | 1105/17.02.2021 | Construction of Link Road Khava to Khiriya. | 18-Feb-2021 10:00 AM | 416.20 | | |
160 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_594548_1 | 80-2/08.06.2021 | Cleaning Work of new Sub-Mandi Iglas. | 12-Jun-2021 10:00 AM | 250.00 | | |
161 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_557831_1 | 1164/21.02.2021 | Inviting Tender for the handling of wheat Purchase center of mandi samiti Aligarh for the Year 2021-22 | 22-Feb-2021 10:00 AM | 250.00 | | |
162 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_557849_1 | 1164 -1/21.02.2021 | Inviting Tender for the handling of wheat Purchase center of mandi samiti Khair for the Year 2021-22 | 22-Feb-2021 10:00 AM | 250.00 | | |
163 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_557852_1 | 1164-2/21.02.2021 | Inviting Tender for the handling of wheat Purchase center of mandi samiti Kasganj for the Year 2021-22 | 22-Feb-2021 10:00 AM | 250.00 | | |
164 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_557855_1 | 1164-3/21.02.2021 | Inviting Tender for the handling of wheat Purchase center of mandi samiti Etah for the Year 2021-22 | 22-Feb-2021 10:00 AM | 250.00 | | |
165 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_557857_1 | 1164-4/21.02.2021 | Inviting Tender for the handling of wheat Purchase center of mandi samiti Hathras for the Year 2021-22 | 22-Feb-2021 10:00 AM | 250.00 | | |
166 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_557859_1 | 1165/21.02.2021 | Inviting Tender for the transportation of wheat Purchase center of mandi samiti Aligarh for the Year 2021-22 | 22-Feb-2021 10:00 AM | 250.00 | | |
167 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_557860_1 | 1165-1/21.02.2021 | Inviting Tender for the transportation of wheat Purchase center of mandi samiti Khair for the Year 2021-22 | 22-Feb-2021 10:00 AM | 250.00 | | |
168 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_557861_1 | 1165-2/21.02.2021 | Inviting Tender for the transportation of wheat Purchase center of mandi samiti Etah for the Year 2021-22 | 22-Feb-2021 10:00 AM | 250.00 | | |
169 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_557863_1 | 1165-3/21.02.2021 | Inviting Tender for the transportation of wheat Purchase center of mandi samiti Kasganj for the Year 2021-22 | 22-Feb-2021 10:00 AM | 250.00 | | |
170 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_557864_1 | 1165-4/21.02.2021 | Inviting Tender for the transportation of wheat Purchase center of mandi samiti Hathras for the Year 2021-22 | 22-Feb-2021 10:00 AM | 250.00 | | |
171 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_559842_1 | 1154/25.02.2021 | Const. of Store room for Mandi Samiti Office, Generator Room, Repairing of Internal Road By hot mix plant, Dismantling of BOE soling , laying of Interlocking and Const. of Saucer Drain, etc.. at NMY Sikandra Rao. | 26-Feb-2021 10:00 AM | 1049.11 | | |
172 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_563469_1 | 1182/04.03.2021 | Construction of Link Road from Chitawar to Chandpa. | 05-Mar-2021 10:00 AM | 575.57 | | |
173 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_566532_1 | 1251/ Dt. 08.03.21 | Cleaning of Grain market, Vegetable market, Fruits market administrative Buldings, Residance colony, Godown at N.M.Y. Aligarh and Cleaning of all Vacant Space Sub mandi yard Harduaganj. | 10-Mar-2021 10:00 AM | 325.07 | | |
174 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_566949_1 | 1215/08.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Aligarh. For the year 2021-22 | 10-Mar-2021 10:00 AM | 250.00 | | |
175 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_566980_1 | 1215/08.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Khair. For the year 2021-22 | 10-Mar-2021 10:00 AM | 250.00 | | |
176 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_567001_1 | 292/09.03.2021 | Cleaning of Grain market, Vegetable and Fruits market administrative Buldings, Residance colony, Godown all Vacant Space mandi yard Chharra. | 10-Mar-2021 10:00 AM | 250.00 | | |
177 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_567014_1 | 1215/08.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Etah. For the year 2021-22 | 10-Mar-2021 10:00 AM | 250.00 | | |
178 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_567023_1 | 1215/08.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Kasganj. For the year 2021-22 | 10-Mar-2021 10:00 AM | 250.00 | | |
179 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_567038_1 | 1215/08.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Hathras. For the year 2021-22 | 10-Mar-2021 10:00 AM | 250.00 | | |
180 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_567052_1 | 1215/08.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Aligarh. For the year 2021-22 | 10-Mar-2021 10:00 AM | 250.00 | | |
181 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_567062_1 | 1215/08.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Khair For the year 2021-22 | 10-Mar-2021 10:00 AM | 250.00 | | |
182 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_567071_1 | 1215/08.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Etah. For the year 2021-22 | 10-Mar-2021 10:00 AM | 250.00 | | |
183 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_567076_1 | 1215/08.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti kasganj. For the year 2021-22 | 10-Mar-2021 10:00 AM | 250.00 | | |
184 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_567088_1 | 1215/08.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Hathras. For the year 2021-22 | 10-Mar-2021 10:00 AM | 250.00 | | |
185 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_571247_1 | 1248/16.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Aligarh For the year 2021-22 | 17-Mar-2021 10:00 AM | 250.00 | | |
186 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_571284_1 | 1248/16.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Khair For the year 2021-22 | 17-Mar-2021 11:00 AM | 250.00 | | |
187 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_571455_1 | 1248/16.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Hathras. For the year 2021-22 | 17-Mar-2021 11:00 AM | 250.00 | | |
188 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_571465_1 | 1248/16.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Etah. For the year 2021-22 | 17-Mar-2021 11:00 AM | 250.00 | | |
189 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_571476_1 | 1248/16.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti kasganj. For the year 2021-22 | 17-Mar-2021 11:00 AM | 250.00 | | |
190 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_571487_1 | 1248/16.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Aligarh. For the year 2021-22 | 17-Mar-2021 12:00 PM | 250.00 | | |
191 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_571507_1 | 1248/16.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Khair. For the year 2021-22 | 17-Mar-2021 12:00 PM | 250.00 | | |
192 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_571515_1 | 1248/16.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Hathras. For the year 2021-22 | 17-Mar-2021 12:00 PM | 250.00 | | |
193 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_571521_1 | 1248/16.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Etah For the year 2021-22 | 17-Mar-2021 12:00 PM | 250.00 | | |
194 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_571534_1 | 1248/16.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti kasganj For the year 2021-22 | 17-Mar-2021 01:00 PM | 250.00 | | |
195 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_576501_1 | 1304/24.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Aligarh. For the year 2021-22 | 25-Mar-2021 05:00 PM | 250.00 | | |
196 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_576539_1 | 1304/24.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Aligarh. For the year 2021-22 | 25-Mar-2021 05:00 PM | 250.00 | | |
197 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_576558_1 | 1304/24.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Khair. For the year 2021-22 | 25-Mar-2021 05:00 PM | 250.00 | | |
198 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_576582_1 | 1304/24.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Khair For the year 2021-22 | 25-Mar-2021 05:30 PM | 250.00 | | |
199 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_576600_1 | 1304/24.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Etah For the year 2021-22 | 25-Mar-2021 05:50 PM | 250.00 | | |
200 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_576619_1 | 1304/24.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Etah. For the year 2021-22 | 25-Mar-2021 05:55 PM | 250.00 | | |
201 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_576632_1 | 1304/24.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti kasganj For the year 2021-22 | 26-Mar-2021 10:00 AM | 250.00 | | |
202 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_576656_1 | 1304/24.03.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti kasganj. For the year 2021-22 | 26-Mar-2021 10:00 AM | 250.00 | | |
203 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_577275_1 | 1304/24.03.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Hathras. For the year 2021-22 | 27-Mar-2021 09:00 AM | 250.00 | | |
204 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_579855_1 | 15/05.04.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti kasganj. For the year 2021-22 | 06-Apr-2021 10:00 AM | 250.00 | | |
205 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_580364_1 | 22/06.04.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Aligarh. For the year 2021-22 | 07-Apr-2021 12:30 PM | 250.00 | | |
206 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_580370_1 | 22/06.04.2021 | Inviting Tender for the Transportation of Wheat purchase center of mandi samiti Khair For the year 2021-22 | 07-Apr-2021 12:30 PM | 250.00 | | |
207 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_580372_1 | 22/06.04.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Aligarh. For the year 2021-22 | 07-Apr-2021 12:30 PM | 250.00 | | |
208 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_580378_1 | 22/06.04.2021 | Inviting Tender for the handling of Wheat purchase center of mandi samiti Khair. For the year 2021-22 | 07-Apr-2021 12:40 PM | 250.00 | | |
209 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_590075_1 | 151-1/27.05.2021 | Purchase of plastic crate for keeping fruits and vegetables | 28-May-2021 11:15 AM | 250.00 | | |
210 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_590085_1 | 151-2/27.05.2021 | Plastic Sheet purchase for laying under the pile in the mandi site for farmers | 28-May-2021 11:45 AM | 250.00 | | |
211 | SE Zone-4||Dy Director Construction, Etah | 2021_RKUMP_594532_1 | 80-1/08.06.2021 | Mandi samiti, cleaning work of all mandi premises like Galla block of Hathras fruit and vegetable block etc. | 12-Jun-2021 10:00 AM | 250.00 | | |
Total | | | | | | 76224.57 | | |