SN | Orgnization | Tender Id | Tender Reference No | Tender Title | PublishedDate | Amount(UPLC Charges) | Payment | Payment Detail |
1 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101282_1 | 756/2017-18 | A- Repair of Mahona Amaniganj to Atesua Link road., B- Repair of Itounja kumrawa road to persaiya to sitalpuwa road., C- Repair of Itounja Kumrawa Road to Parasaiya Dhodipuwa link road., D- Repair of Amaniganj to Banoga Link Road (Remaining Portion | | 642.57 | | |
2 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101401_1 | 764/2017-18 | Repair of Chandrika Devi Road km. 6 Tueeable no. 15 to Chakarpur Raitha Road | | 250.00 | | |
3 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101443_1 | 771/2017-18 | Repair of Banthara Hanuman Mandir to Latifpur road to Baniyan Kheda, Bachan Kheda Baba ki Kutiya road. | | 250.00 | | |
4 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101449_1 | 773/2017-18 | Repair of Gangaganj Nagram road to Radhe Brick feeld Matera via Badeha road | | 291.17 | | |
5 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101457_1 | 757/2017-18 | A- Repair of Kursi Road Itounja Rajwaha to Kursi Behta Link Road., B- Repair of Mall Road to Madhaupur Marpa Naurangpur Link road., C- Repair of Ahmadput Kheda to Khera ke Purwa link road., D- Repair of Jamkhanawa to Surajpur Link Road | | 762.45 | | |
6 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101460_1 | 758/2017-18 | A- Repair of Behta Village to Kursi Road., B- Repair of Kursi road Itaunja Rajwaha to Kusi Behta Link Road. | | 398.22 | | |
7 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101463_1 | 759/2017-18 | A- Repair of B.K.T to Chandrika Devi road to Paschim gawon road., B- Repair of Madaripur to Kishunpur link road., C- Repair of Chandrika Devi Lucknow Road to Badi Devarahi, Chothi Devarahi, Parwat, Bhawanipur Road | | 431.57 | | |
8 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_106807_1 | 774/2017-18 | Repair and Maintenance of Toilets and Painting work in Mango Pack House Rahmankhera Hardoi road Lucknow | | 250.00 | | |
9 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101475_2 | 761/2017-18 | A- Repair of Hariharpur to Mazara Hasiyamau road., B- Repair of Lilmatha Nagram road to Ahimamau Mainar road. | | 250.00 | | |
10 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_111876_1 | | Repair of Kursi road to Adharkheda Nahar Purliya to Bhagatapur mandir Link Road | | 362.20 | | |
11 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_111882_1 | 765/2017-18 | Repair of Sairpur Bairumau road to Rajkiay kup no. 110 Bairumau School road | | 250.00 | | |
12 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_127028_1 | 783/2017-18 | repairing /maint. of of AC sheet, urinal and CC work and p/l of interlocking works near gate at Sub fish mandi yard dubagga lucknow | | 250.00 | | |
13 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_127030_1 | 784/2017-18 | repairing of OHT, WSP,Water pipe line, Sluabh toilet ,interlocking tile cc Road. Main hole cover and MS iron jal over PVC tank etc at F/v Market Dubagga Lucknow | | 340.00 | | |
14 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_127021_1 | 782/2017-18 | Repair and Maintainance of APF , Office Building, OHT , Boundary Wall, Internal Road, Water Stand Post, etc. and Painting , Colouring and also Construction of Water Stand Post with sumersible | | 720.00 | | |
15 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_208353_1 | 213/2018 | Construction of Covered A.P.F. (9x20M) , 1 no india mark hand pump ll and surrounding of APF Interlocking etc. at Ghatghata baba place Mavaikhurd, Mall , District Lucknow | 25-May-2018 04:25 PM | 250.00 | | |
16 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_216950_1 | 348/2018 | Construction of Covered A.P.F. (9x20M) , 1 no india mark hand pump ll and surrounding of APF Interlocking etc. at Ghatghata baba place Mavaikhurd, Mall , District Lucknow | 13-Jun-2018 04:30 PM | 254.40 | | |
17 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_223010_1 | 376 | Repair or maint. of Link road Neelmatha- Nagram road to sherpur via Shri Shushil patel house , District Lucknow | 29-Jun-2018 02:30 PM | 399.80 | | |
18 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_223034_1 | 411 | Construction of Covered A.P.F. (9x20M) , 1 no india mark hand pump ll and surrounding of APF Interlocking etc. at Ghatghata baba place Mavaikhurd, Mall , District Lucknow | 29-Jun-2018 02:55 PM | 254.40 | | |
19 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_227694_1 | 562/2018 | Repair or maint. of Link road Neelmatha- Nagram road to sherpur via Shri Shushil patel house , District Lucknow | 11-Jul-2018 02:15 PM | 349.17 | | |
20 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_231558_1 | 633/2018 | Repair or maint. of Link road Neelmatha- Nagram road to sherpur via Shri Shushil patel house , District Lucknow | 21-Jul-2018 12:50 PM | 349.17 | | |
21 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_239796_1 | 664 | Special repair work of link road Gangaganj nagram road to aadampur under mandi samiti banthra lko | 14-Aug-2018 05:35 PM | 264.81 | | |
22 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_239796_2 | 664 | Special repair work of link road Hussainabad to hasua under mandi samiti banthra lko | 14-Aug-2018 05:40 PM | 288.12 | | |
23 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_239796_3 | 664 | Special repair work of link road Jaitipur marg to mirjapur santnagar rudwara padiyana under mandi samiti banthra lko | 14-Aug-2018 05:45 PM | 314.03 | | |
24 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_239796_4 | 664 | pecial repair work of link road Ramchora gram park CC road se Lalakhera hote hue dadupur under mandi samiti banthra lko | 14-Aug-2018 05:50 PM | 250.00 | | |
25 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_239796_5 | 664 | Special repair work of link road Samda to Anora under mandi samiti banthra lko | 14-Aug-2018 05:55 PM | 250.00 | | |
26 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_243211_1 | 741/2018 | Special repair work of link road Jaitipur marg to mirjapur santnagar rudwara padiyana under mandi samiti banthra lko | 24-Aug-2018 05:50 PM | 314.03 | | |
27 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_245711_1 | 781/2018 | Special repair work of link road Jaitipur marg to mirjapur santnagar rudwara padiyana under mandi samiti banthra lko | 31-Aug-2018 02:05 PM | 314.03 | | |
28 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_251332_1 | 821/2018 | Repairing /maint. of Link road Awadh Traders to I | 17-Sep-2018 04:55 PM | 250.00 | | |
29 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_270671_1 | 800/2018-19 | Special repair work of link road Awadh Traders to Indreesh house near Vijay nagar crossing on Neelmatha Nagram road under mandi samiti banthra lko | 05-Nov-2018 12:05 PM | 250.00 | | |
30 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_275442_11 | 1206/2018 | Repairing Mentanence of Link Road Saidapur chandrikadevi marg to Rasidkhera Under Mandi Samiti Lko | 06-Dec-2018 02:00 PM | 250.00 | | |
31 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_275442_12 | 1206/2018 | Repairing Mentanence of Link Road Chandrika Devi Marg to Choti Devraee, Badi Devraee to Bhawaanipur Under Mandi Samiti Lko | 06-Dec-2018 02:15 PM | 250.00 | | |
32 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_275442_13 | 1206/2018 | Repairing Mentanence of Link Road Damar Road to Devaria Khurd Under Mandi Samiti Lko | 06-Dec-2018 03:00 PM | 250.00 | | |
33 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_275442_14 | 1206/2018 | Repairing Mentanence of Link Road Eshapur to Subhaan Nagar to Dilawar Nagar Under Mandi Samiti Lko | 06-Dec-2018 03:00 PM | 280.44 | | |
34 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_275442_15 | 1206/2018 | Repair and maintainance of link road Amausi to Basantkhera Under Mandi Samiti Banthra Lko | 06-Dec-2018 03:00 PM | 387.98 | | |
35 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_275442_16 | 1206/2018 | Repairing AND Mentanence of Link Road FromMaura Marg to Jeahta Kharanja Under Mandi Samiti Lko | 06-Dec-2018 03:00 PM | 250.00 | | |
36 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101421_1 | 768/2017-18 | Repair of Raitha Road to Tubeel no 37 via Tubeel no. 36 Near Road | | 290.10 | | |
37 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101427_1 | 769/2017-18 | Repair of Bhadesarmau to Sindhaurawa road. | | 250.00 | | |
38 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101399_2 | 763/2017-18 | Repair of Faizabad Road to Uttar Dhauna Link Road | | 250.00 | | |
39 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101414_2 | 766/2017-18 | Repair of Itounja Kusi Road to Subhasnagar link road | | 250.00 | | |
40 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101438_2 | 770/2017-18 | Repair of Latifpur Jaitipur road to Gram Bahajanamau Link road. | | 250.00 | | |
41 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_111885_1 | 772/2017-18 | Repair of Patauna to Ankit kheda Link road | | 250.00 | | |
42 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_69225_1 | nikhl-nivida-2017-180 | repair and maintenance | | 250.00 | | |
43 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101391_1 | 762/2017-18 | Repair of Nandana Road to Kotwa link road | | 250.00 | | |
44 | SE Zone-5||Dy Director Construction, Lucknow | 2017_RKUMP_101418_1 | 767/2017-18 | Repair of Anaurapuliya Faizabad Road to Papnamau Lalpur Link Road | | 250.00 | | |
45 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_275442_17 | 1206/2018 | Repairing and Mentanence of Link Road From Mall Road to Mohammadpur Talukedaari Under Mandi Samiti Lko | 06-Dec-2018 03:00 PM | 250.00 | | |
46 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_275442_18 | 1206/2018 | Repairing and Mentanence of Link Road kakoribazar to Rasoolpur Under Mandi Samiti Lko | 06-Dec-2018 03:00 PM | 259.79 | | |
47 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_286346_1 | DDC/Tender/2018-1418 Date 14-12-2018 | Repairing and mentence of link road Chandrika Devi marg to choti Devraee, Bade Devraee to Bhawanipur under Mandi samti lko | 22-Dec-2018 12:00 PM | 250.00 | | |
48 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_286351_1 | DDC/Tender/2018-1418 Date 14-12-2018 | Repairing and mentence of link road Eshapur to Subhaan Nagar to dilawar nagar under mandi samiti lko | 22-Dec-2018 12:00 PM | 280.44 | | |
49 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_286354_1 | DDC/Tender/2018-1418 Date 14-12-2018 | Repairing and mentence of link road Amausi to basant khera under mandi samiti lko | 22-Dec-2018 12:00 PM | 387.98 | | |
50 | SE Zone-5||Dy Director Construction, Lucknow | 2018_RKUMP_286359_1 | DDC/Tender/2018-1414 Date 14-12-2018 | Special Repair of link road Awadh Traders to indreesh house near vijay nagar crossing on neelmatha nagaram road under mandi samiti lko | 22-Dec-2018 12:00 PM | 250.00 | | |
51 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_294023_1 | 1493 | Special Repair of link road Awadh Traders to indreesh house near vijay nagar crossing on neelmatha nagaram road under mandi samiti lko | 12-Jan-2019 09:00 AM | 250.00 | | |
52 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_310157_1 | 1534 | Construction of 9x20 Mt. Godown/Store, interlocking tile,drain, Flooring etc. , Repairing / Maint / painting of Boundary wall, Guest house, pack house, internal Road and Reboring of india mark II hand pump at mango Pack House, Rahman khera , Hardoi | 15-Feb-2019 05:40 PM | 510.21 | | |
53 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_313558_1 | 47/2019 | Supply Instalation of nest-in modular toilet units steel super structure | 19-Feb-2019 05:00 PM | 250.00 | | |
54 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_313615_1 | 47-2/2019 | Construction of Waste based Biogas plant | 19-Feb-2019 05:00 PM | 250.00 | | |
55 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_313636_1 | 47-3/2019 | Providing and Fixing of Self Supported ARC Type Roofing | 19-Feb-2019 05:00 PM | 250.00 | | |
56 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_326918_1 | 69/2019 | Construction of wastes based Biogas plant one cum and digester volume 02 cum with gas supplying in Hatpath at Lucknow | 28-Feb-2019 05:55 PM | 250.00 | | |
57 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_397851_1 | 824/2019 | Repairing of link road hardoi road to rasulpur | 31-Oct-2019 01:00 PM | 267.47 | | |
58 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_397878_1 | 824/2019 | Repairing of link road from Jamkhanwa to bhediya | 31-Oct-2019 02:15 PM | 250.00 | | |
59 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_417191_1 | NIRLK0/1193 DATE 19/12/19 | Uchval to Samthari | 27-Dec-2019 05:00 PM | 294.50 | | |
60 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_421490_1 | 1138 date 21/12/2019 | HATHPATH BICHIYA NMY UNNAO | 08-Jan-2020 05:00 PM | 838.90 | | |
61 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_330423_1 | 53 | CONS. Of two no. Shed 6X20, boundry wall, gate, interlocking tile, redymade toilet block at hatpath lateefpur district LUCKNOW | 04-Mar-2019 09:00 AM | 335.42 | | |
62 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_330438_1 | 63 | CONS. Of two no. Shed 6X20, boundry wall, gate, interlocking tile, redymade toilet block at hatpath newa district LUCKNOW | 04-Mar-2019 09:00 AM | 371.51 | | |
63 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_365045_1 | DDC/Tender/2019-395 | Repair and maintenance, Renovation of A type 43 no. Shops, B type 115 no. Shops, C type 127 no. Shops, 2no. Covered Auction plateform of size 12X88 mt. each, Repair and maintanance , Renovation of attached toilet in 43 no. A type shops and 73 no. B t | 18-Jul-2019 06:40 PM | 4003.11 | | |
64 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_365062_1 | DDC/Tender/2019-395 | Construction of 01 no Delux toilet block including sanitary and water supply work at NMY Sitapur Road Lucknow. | 19-Jul-2019 09:00 AM | 250.00 | | |
65 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_365065_1 | DDC/Tender/2019-395 | Construction of 25 no. C type shops , coverd shade work , Boundry wall near CWC godown, internal road in Raitu Bazar, c.c. tremix road in vegetable market at NMY Sitapur Road Lucknow. | 19-Jul-2019 09:00 AM | 1928.37 | | |
66 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_365156_1 | DDC/Tender/2019-395 | Construction of 2 no coverd shed, Boundry wall, Gate, Toilet, Interlocking tile, Drain etc. In hotpath at village Latifpur Block-mall under mandi Lucknow. | 19-Jul-2019 12:10 PM | 357.48 | | |
67 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_365169_1 | DDC/Tender/2019-395 | Construction of 2 no. coverd shed,Boundry wall, Gate, Toilet, Interlocking tile, Drain etc. In hotpath at village Neewan on Bani Mohanlalganj marg under mandi banthra Lucknow. | 19-Jul-2019 12:30 PM | 392.46 | | |
68 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_365180_1 | DDC/Tender/2019-395 | Construction of 2 no. coverd shed,Boundry wall, Gate, Toilet, Interlocking tile, Drain etc. In hotpath at village Sherpur lawal, Nigoha on Raibareli road under mandi banthra Lucknow | 19-Jul-2019 01:45 PM | 392.46 | | |
69 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_379288_1 | DDC/Tender/2019-619 | Repair and Maintenance of old constructed A,B,C Type Shops with toilet and construction of 25 Nos., C type shops, shed, Boundary, Internal Road in Raitu Bazar CC trimix at NMY Sitapur Road lko. | 09-Sep-2019 01:00 PM | 5000.00 | | |
70 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_379538_1 | DDC/Tender/2019-619 | Construction of 01 no Delux toilet block including sanitary and water supply work at NMY Sitapur Road Lucknow. | 09-Sep-2019 01:15 PM | 250.00 | | |
71 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_379551_1 | DDC/Tender/2019-619 | Construction of 2 no coverd shed, Boundry wall, Gate, Toilet, Interlocking tile, Drain etc. In hatpath at village Latifpur Block-mall under mandi Lucknow. | 09-Sep-2019 01:30 PM | 357.48 | | |
72 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_379561_1 | DDC/Tender/2019-619 | Construction of 2 no. coverd shed,Boundry wall, Gate, Toilet, Interlocking tile, Drain etc. In hatpath at village Newa on Bani Mohanlalganj marg under mandi banthra Lucknow | 09-Sep-2019 01:35 PM | 392.46 | | |
73 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_380591_1 | DDC/Tender/2019-646 | Architectural Consultancy of Existing and new Planing of Mandi Yard Under Mandi Samiti Lucknow. | 13-Sep-2019 10:00 AM | 250.00 | | |
74 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_389000_1 | E-Tender Lucknow/2019-781-1 | Construction of 2 no coverd shed Boundary wall Gate Toilet Interlocking Tile Drain etc In Hathpath At Village Latifpur Block Mall Marg Under Mandi Lucknow | 04-Oct-2019 06:00 PM | 404.80 | | |
75 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_391630_1 | 757/2019 | Construction of link road Raipur tiraha puliya village Dashahri to Sharda nahar via Kakori mohan road under mandi samiti Luconow | 12-Oct-2019 02:00 PM | 894.44 | | |
76 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_397907_1 | 846/2019 | Construction of link road raipur tiraha puliya village dashahri to sharda nahar via kakori mohan road under mandi samiti lucknow | 31-Oct-2019 03:00 PM | 894.44 | | |
77 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_397938_1 | 869/2019 | Construction of cover shed Boundry wall gate toilet interlocking tile drain etc at latifpur block mall under mandi lucknow | 31-Oct-2019 03:40 PM | 357.48 | | |
78 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_398972_1 | 853/2019 | Architecture consultancy of existing and new planning of mandi yard under mandi samiti lucknow | 02-Nov-2019 04:50 PM | 250.00 | | |
79 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_402444_1 | Const./E-Tender/2019-400 Dt. 22.10.2019 | Repair/Maintenance of Link road from Dhauremau to Kaimahara. | 11-Nov-2019 06:00 PM | 250.00 | | |
80 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_402461_1 | A-2 Const./E-Tender/2019-400 Dt. 22.10.2019 | Repair/Maintenance of Link road from Malihabad Chauraha to Gangapur via Pakariya Dhapupur. | 11-Nov-2019 06:00 PM | 421.60 | | |
81 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_402469_1 | B-1 Const./E-Tender/2019-400 Dt. 22.10.2019 | Repair/Maintenance of Link road from Nakra to Banni Kharaila via Majhigawan-Naseerpur. | 11-Nov-2019 06:00 PM | 250.00 | | |
82 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_402480_1 | C-1 Const./E-Tender/2019-400 Dt. 22.10.2019 | Repair/Maintenance of Link road from Laherpur-Bhadfer to Bilariya. | 11-Nov-2019 06:00 PM | 250.00 | | |
83 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_402491_1 | C-2 Const./E-Tender/2019-400 Dt. 22.10.2019 | Repair/Maintenance of Link road from Mudikheda road to Gadapur. | 11-Nov-2019 06:00 PM | 250.00 | | |
84 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405091_1 | DDC/Tender/2019-619/932 | Construction of 2 no coverd shed, Boundry wall, Gate, Toilet, Interlocking tile, Drain etc. In hatpath at village Latifpur Block-mall under mandi Lucknow. | 18-Nov-2019 03:20 PM | 357.48 | | |
85 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405461_1 | N.K.L/(Nivida public)/2019-951 Dated 19.11.19 | Construction of 02 No 6x20 APF 01 No gate and gate pillers construction of u type drain toilet laying of interlocking in open area at hat path judaura in NMY hardoi. | 19-Nov-2019 05:40 PM | 454.76 | | |
86 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405664_1 | N.K.Lko/(Nivida public)/2019-949 Dated 19.11.2019 | Maintenance of 10 No. A typer 06 No. B type 33 No. C type 10 No D type 10 No God own type shop and maintenance of sachiv office in NMY Shahabad Hardoi | 20-Nov-2019 02:00 PM | 509.15 | | |
87 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405665_1 | N.K.Lko/(Nivida public)/2019-917 Dated 19.11.2019 | R/O Link road Hardoi Lucknow Road to Gadnapur in NMY Hardoi | 20-Nov-2019 02:00 PM | 250.00 | | |
88 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405668_1 | N.K.Lko/(Nivida public)/2019-917 Dated 19.11.2019 | R/M Of L/R Hardoi Pihani Road to Nanhe in NMY Hardoi | 20-Nov-2019 02:00 PM | 250.00 | | |
89 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405770_1 | N.K.Lko/(Nivida public)/2019-917 Dated 19.11.2019 | R/M Of L/R Sandi Road to Sathra NMY Hardoi | 20-Nov-2019 02:00 PM | 250.00 | | |
90 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405786_1 | N.K.Lko/(Nivida public)/2019-917 Dated 19.11.2019 | R/M Of L/R Yeja to Baijana NMY Hardoi | 20-Nov-2019 02:30 PM | 250.00 | | |
91 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405812_1 | N.K.Lko/(Nivida public)/2019-917 Dated 19.11.2019 | Construction of C.C. Road at Gausganj to Katra Remaining part NMY Sandila | 20-Nov-2019 02:40 PM | 253.91 | | |
92 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405801_1 | N.K.Lko/(Nivida public)/2019-959 Dated 19.11.2019 | Special Repair work of Jamkhanwa to Bhediya Link Road at NMY Lucknow Sitapur Road. | 20-Nov-2019 02:45 PM | 250.00 | | |
93 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405827_1 | N.K.Lko/(Nivida public)/2019-917 Dated 19.11.2019 | R/M Of L/R Pihani Shahabad Road to Aderi NMY Shahabad | 20-Nov-2019 03:30 PM | 250.00 | | |
94 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405860_1 | N.K.Lko/(Nivida public)/2019-917 Dated 19.11.2019 | R/M of L/R Pihani karwan road to patrasa under mandi samiti Shahabad Dist. Hardoi | 20-Nov-2019 04:30 PM | 250.00 | | |
95 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405872_1 | N.K.Lko/(Nivida public)/2019-917 Dated 19.11.2019 | R/M Of L/R Sharma Halt to Bilalpur in NMY Shahabad | 20-Nov-2019 04:30 PM | 250.00 | | |
96 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405889_1 | N.K.Lko/(Nivida public)/2019-917 Dated 19.11.2019 | R/M Of L/R Uchval to Samthari Remaing Part NMY Shahabad | 20-Nov-2019 04:50 PM | 258.32 | | |
97 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_405913_1 | N.K.Lko/(Nivida public)/2019-917 Dated 19.11.2019 | R/M Of L/R Chena to Lona Road NMY Shahabad | 20-Nov-2019 05:45 PM | 250.00 | | |
98 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_408537_1 | 957 dated 19-11-2019 | REPAIRING OF LINK ROAD KUNDANGANJ JOHVA SHARKI MARG SE JAGAN KA PURVA HOTE HUE GAJA SINGH KA PURVA TAK Under N.m.y. RAEBARELI LENGTH 2.00 KM | 28-Nov-2019 04:00 PM | 348.43 | | |
99 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_408544_1 | 957 DATED 19-11-2019 | REPAIRING OF LINK ROAD UMRAN SE RASULPUR TAK Under N.m.y. LALGANJ LENGTH 1.50 KM | 28-Nov-2019 04:00 PM | 250.00 | | |
100 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_409843_1 | N.K.Lko/(Nivida public)/2019-924 | Construction of 2 No covered shed, boundary wall, Gate, Toilet , interlocking tile, drain, Biogas plant, Submersible pump, solar power plant,electrification etc. in Hotpath at village Manjhariya under mandi Lko | 03-Dec-2019 01:30 PM | 424.78 | | |
101 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_409643_1 | N.K.Lko/(Nivida public)/2019-924 Dated 13.11.2019 | Construction of 2 No covered shed, boundary wall, Gate, Toilet , interlocking tile, drain, Biogas plant, Submersible pump, solar power plant,electrification etc. in Hatpath at village Salempur patora under mandi Lko . | 03-Dec-2019 01:40 PM | 422.07 | | |
102 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_409880_1 | N.K.Lko/(Nivida public)/2019-924 Dated 13.11.2019 | Construction of 2 No covered shed, boundary wall, Gate, Toilet , interlocking tile, drain, Biogas plant, Submersible pump, solar power plant,electrification etc. in Hatpath at village Sonva under mandi Lko. | 03-Dec-2019 01:50 PM | 440.01 | | |
103 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_409895_1 | N.K.Lko/(Nivida public)/2019-1018 Dated 30.11.2019 | Supply and fixing of PVC Flooring at Rahmankhera Hardoi Road Lucknow. | 03-Dec-2019 02:20 PM | 250.00 | | |
104 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_416753_1 | U.N.(n.)lko-Nivida suchna/2019-1157 Dated 24.12.20 | Arcitecteral Consultancy for renovation and new planing work of new mandi yard at lucknow. | 26-Dec-2019 02:30 PM | 250.00 | | |
105 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_416770_1 | N.K/LKO/E-Nivida/2019-1125 Dated 18.12.2019 | Repairing Strengthingh or Road by Hot_Mix Plant Laying of Interlocking Tiles pavement Const. of Drain Gate and Gate Piller A.P.F Repairing Maintenance of Secratory office Staff quarters A B C D Type Shops Farmer Rest Houseetc at NMY Tukuniya kheri | 27-Dec-2019 10:30 AM | 3569.83 | | |
106 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_417405_1 | 1129 dated 18.12.2019 | Repair of Bangermau Sandila Marg se Gosha Kutubpur tak se Rasulpur tak Under N.m.y. BANGERMAU LENGTH 2.90 KM | 28-Dec-2019 02:00 PM | 353.65 | | |
107 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_418065_1 | 1102/2019 | Construction of 2 No covered shed, boundary wall, Gate, Toilet , interlocking tile, drain, Biogas plant, Submersible pump, solar power plant,electrification etc. in Hotpath at village Manjhuriya under mandi Lko . | 30-Dec-2019 05:00 PM | 424.78 | | |
108 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_418665_1 | 1101 dated 17.12.2019 | Construction of Hat-Path at KARMI GADHEVA N.M.Y. PURVA | 31-Dec-2019 06:55 PM | 409.50 | | |
109 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_418670_1 | 1101 DATED 17.12.2019 | Construction of Hat-Path at ASOHA N.M.Y. PURVA | 31-Dec-2019 06:55 PM | 430.10 | | |
110 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_422305_1 | N.K./lko/E-Nivida/2019-1123 Dt. 18.12.19 | Repairing and Painting of B C type shop office Building Construction of Dammage Boundary wall 8 No. C type shop Interlocking around A.P.F, Repairing of AC sheet on godown APF etc. and widening and Repairing of Enternal Road at UMS Maighalganj | 10-Jan-2020 01:00 PM | 1774.61 | | |
111 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_424071_1 | N.LKO.(N.Public)/2020-1229 Dated 04.01.20 | Construction of ENam office plumbing work and renovation of APF At NMY Sitapur | 15-Jan-2020 03:30 PM | 1194.92 | | |
112 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_424088_1 | N.Lko(N.Public)/2020-1229 Dated 04-01-2020 | Repairing and Strengthening of Internal Road Construction of APF on Old Open APF Repairing and Raising of floor old 02 No APF P L of CC Road SLAB around APF off street parking and Repairing and Maintenance snowcem painting etc at SMY Tambour Stp | 16-Jan-2020 10:30 AM | 1537.46 | | |
113 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_424209_1 | N.Lko(N. Public)/2020-1229 Dated 04.01.20 | Construction of 01 no type 1st 01 no type 2nd 01 no type 3rd staff quarter at smy Laherpur distt sitapur | 16-Jan-2020 10:30 AM | 376.72 | | |
114 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_424240_1 | N.Lko(N. Public)/2020-1229 Dated 04.01.20 | Repairing and Maintenance of snowcem, painting etc. of office building, shops, Boundry Wall, Godown, and 9x40 M. covered shed etc at SMY Lalpur at Distt. SITAPUR. | 16-Jan-2020 10:30 AM | 306.81 | | |
115 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_418670_2 | 1101 DATED 17.12.2019 | Name of Work Construction of Hat Path at ASOHA NMY PURVA | 18-Jan-2020 06:00 PM | 430.10 | | |
116 | SE Zone-5||Dy Director Construction, Lucknow | 2019_RKUMP_418665_2 | 1101 dated 17.12.2019 | Name of Work Construction of HatPath at KARMI GADHEVA NMY PURVA | 18-Jan-2020 06:00 PM | 409.50 | | |
117 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_425751_1 | 2020-1255 | Consstruction of hatpath Manjhoria unser mandi samiti Lucknow | 20-Jan-2020 12:00 PM | 424.78 | | |
118 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_421490_2 | 1138 date 21/12/2019 | const of Under hotpat Bichiya nmy unnao | 24-Jan-2020 06:00 PM | 777.08 | | |
119 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_429105_1 | N.L./(Nivada pub.)/2020-1333 dated 18.01.2020 | Construction of 02 No covered APF 6x20 M boundary wall 02 No gate and gate pillar toilet interlocking tile drain etc in hatpath at village kuchlai under Mandi samiti mishrikh dist sitapur | 29-Jan-2020 01:00 PM | 300.48 | | |
120 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_429118_1 | N.L/(Nivida pub.)/2020-1333 dated 18.01.2020 | Construction of 02 No covered APF 6x20 M boundary wall 02 No gate and gate pillar toilet interlocking tile drain etc in hatpath at village sherpur under Mandi samiti hargaon dist sitapur | 29-Jan-2020 01:00 PM | 396.58 | | |
121 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_429724_1 | N.Lko(N. Public)/2020-1398 Dated 29.01.2020 | Construction of E-NAM office Plumbing work and renovation of A.P.F. at NMY SITAPUR. | 31-Jan-2020 02:00 PM | 1194.92 | | |
122 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_429851_1 | N.Lko.(N.public)/2020-1398 dated 29.01.2020 | R and S of Internal Road Construction of 9x40M. APF on Old Open APF Repairing and Raising of floor, old 02 No APFP and L of CC Road SLAB around APF off street parking etc of office building shops Boundry SMY Tambour Distt. Sitapur. | 31-Jan-2020 02:00 PM | 1537.46 | | |
123 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_429874_1 | N.lko.(N.pub.)/2020-1401 dated 29.01.2020 | Construction of hatpath at Asoha purwa dist. Unnao | 31-Jan-2020 02:00 PM | 430.10 | | |
124 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_429884_1 | N.lko./(N.pub.)/2020-1401 Dated 29.01.2020 | Construction of hatpath at Karmi Gadheva NMY purwa dist. Unnao | 31-Jan-2020 02:00 PM | 409.50 | | |
125 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_431816_1 | N.L./(Nivida publice)/2020-1470 Dated 04.02.2020 | Construction of Type Ist 01 No. Type-II 01 and Type III 01 Staff Quarter at SMY Laherpur at Distt. SITAPUR. | 06-Feb-2020 04:00 PM | 376.72 | | |
126 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_431785_1 | N.L/(Nivida publice)/2020-1470 Dated 04.02.2020 | Repairing Maintenance of snowcem, painting etc. of office building shops, Boundry Wall Godown and 9x40 M. covered shed etc at SMY Lalpur at Distt. SITAPUR. | 06-Feb-2020 04:15 PM | 306.81 | | |
127 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_435005_1 | 1468/2020 | Construction of gramin hatpath under mandi samiti unnav. | 14-Feb-2020 01:30 PM | 777.08 | | |
128 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_437086_1 | Ref. No. 1585 Dt. 18.02.2020 | Construction of 02 No covered APF 6x20 M boundary wall 02 No gate and gate pillar toilet interlocking tile drain etc in hatpath at village kuchlai under Mandi samiti mishrikh dist sitapur | 19-Feb-2020 05:00 PM | 390.48 | | |
129 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_437101_1 | Ref. No. 1585 Dt. 18.02.2020 | Construction of 02 No covered APF 6x20 M boundary wall 02 No gate and gate pillar toilet interlocking tile drain etc in hatpath at village sherpur under Mandi samiti hargaon dist sitapur | 19-Feb-2020 05:00 PM | 396.58 | | |
130 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_437117_1 | Ref. No. 1587 Dt. 18.02.2020 | Construction of E-NAM office Plumbing work and renovation of A.P.F. at NMY SITAPUR. | 19-Feb-2020 05:00 PM | 1194.92 | | |
131 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_437144_1 | Ref. No. 1585 Dt. 18.02.2020 | Construction of 02 No. Covered A.P.F. (6X20)M., Boundry Wall, 02 No. Gate and Gate Pillar, Toilet, Interlocking Tile, Drain etc in Hot_Path at Village KHARAULI Distt. Unnao. | 19-Feb-2020 05:30 PM | 415.80 | | |
132 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_440252_1 | N.Lko./(Nivida Pub.)/2020-1612 Dated 26.02.2020 | Construction of boundary wall, gate and gate piller, repairing of (shed work and civil work covered APF (9x40), Repair of 13 No. C type shops, construction of check post/office, const. of earth filling and interlocking tiles at Hatpad Bichiya Unnao | 27-Feb-2020 01:00 PM | 777.08 | | |
133 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_440392_1 | N.Lko./(Nivida Pub.)/2020-1617 Dated 26-02-2020 | Construction and Maintinance of under drain main gate to sarayan river at New Mandi yard Sitapur. | 27-Feb-2020 02:30 PM | 250.00 | | |
134 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_442281_1 | N.Lko./(Nivida pub.)/2020-1640 dated 02.03.2020 | Construction of E-NAM office, Plumbing work and renovation of A.P.F. at NMY SITAPUR. | 02-Mar-2020 05:15 PM | 1194.92 | | |
135 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_465784_1 | N.K./Lko/E-Nivida/2020-23 Dated 04.05.2020 | Construction of E-NAM office Plumbing work renovation of A.P.F. and Construction of Gate and Gate pillar P/L of Trimix on old C.C. and Repair/Maintenance of 500M.T. Godown, A,B,C type shop etc. at NMY SITAPUR. | 06-May-2020 09:00 AM | 2698.81 | | |
136 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_465799_1 | N.K./Lko/E-Nivida/2020-23 Dated 04.05.2020 | Construction of 15 No. C Type shops, Repairing and painting of 15 No. super market shop and grain, fruit and vegetable market at NMY PALIYA. | 06-May-2020 09:00 AM | 781.69 | | |
137 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_465823_1 | N.K./Lko/E-Nivida/2020-23 Dated 04.05.2020 | Construction of 02 No. Covered A.P.F. (6X20)M., Boundry Wall, 02 No. Gate and Gate Pillar, Toilet, Interlocking Tile, Drain etc in HotPath at Village KUCHLAI Under Mandi Samiti Mishrikh Distt. Sitapur | 06-May-2020 09:00 AM | 390.48 | | |
138 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_465837_1 | N.K./Lko/E-Nivida/2020-23 Dated 04.05.2020 | Construction of 02 No. Covered A.P.F. (6X20)M., Boundry Wall, 02 No. Gate and Gate Pillar, Toilet, Interlocking Tile, Drain etc in HotPath at Village SHERPUR Under Mandi Samiti Hargaon Distt. Sitapur. | 06-May-2020 09:00 AM | 396.58 | | |
139 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_465911_1 | N.K./Lko/E-Nivida/2020-23 Dated 04.05.2020 | Development of under ground RCC drain New mandi yard sitapur main gate to Sarayan Rever at N.M.Y. Sitapur. | 06-May-2020 09:00 AM | 250.00 | | |
140 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_465915_1 | N.K./Lko/E-Nivida/2020-23 Dated 04.05.2020 | Construction of 02 No covered A.P.F 6x20 M., Boundary wall, 02 No. gate and gate pillar, Toilet, interlocking tiles, drain etc. in hatpath at village kharauli Distt. Unnao. | 06-May-2020 09:00 AM | 415.80 | | |
141 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_465921_1 | N.K./Lko/E-Nivida/2020-23 Dated 04.05.2020 | Const. of Boundary wall, gate and gate pillar, Repairing of shed work and civil work covered APF (9x40) M. Repair of 13 No. C type shop, const. of check post/office, const. earth filling and interlocking tiles in hatpath at Bichiya Distt. Unnao. | 06-May-2020 09:00 AM | 777.08 | | |
142 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_466115_1 | N.K./Lko/E-Nivida/2020-23 Dated 04-05-2020 | Repairing of Link road from Hardoi road to Central institute for Subtropical Horticulture at Rehman kheda Lucknow. | 06-May-2020 09:00 AM | 557.01 | | |
143 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_465919_1 | N.K./Lko/E-Nivida/2020-23 Dated 04.05.2020 | Repairing and strengthing of internal road with C.C Road, R.C.C drain work widing and construction of 2 No. Main gate, Repairing of Canteen Building (3 Nos.), Construction of APF (12x72) Meter with Truss and sheeting work etc at NMY Lucknow. | 06-May-2020 09:00 AM | 5000.00 | | |
144 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_470795_1 | N.K./Lko/E-Nivida/2020-44 Dated 15.05.2020 | Installation of 06 No. India Mark-2 Hand pump At NMY Raibarelly Dist. Raibarelly. | 16-May-2020 03:00 PM | 250.00 | | |
145 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_470800_1 | N.K./Lko/E-Nivida/2020-44 Dated 15.05.2020 | Reboring of 06 No. India Mark-2 Hand pump At NMY Lakhimpur Dist. Lakhimpur kheri. | 16-May-2020 03:00 PM | 250.00 | | |
146 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_470806_1 | N.K./Lko/E-Nivida/2020-44 Dated 15.05.2020 | Reboring of india mark II hand Pump at NMY Sitapur road (3 No.) and F/V market yard Dubagga (4 No.) Lucknow. | 16-May-2020 03:00 PM | 250.00 | | |
147 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_470811_1 | N.K./Lko/E-Nivida/2020-44 Dated 15.05.2020 | Installation of 06 No. India Mark-2 Hand pump At NMY Mahmoodabad Dist. Sitapur. | 16-May-2020 03:00 PM | 250.00 | | |
148 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_470816_1 | N.K./Lko/E-Nivida/2020-44 Dated 15.05.2020 | Installation of 8 Nos Hand pump at N.M.Y Madhoganj, Hardoi. | 16-May-2020 03:00 PM | 250.00 | | |
149 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_470820_1 | N.K./Lko/E-Nivida/2020-44 Dated 15.05.2020 | Reboring of 04 No. India Mark-2 Hand pump At NMY Salon Dist. Raibarelly. | 16-May-2020 03:00 PM | 250.00 | | |
150 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_470825_1 | N.K./Lko/E-Nivida/2020-44 Dated 15.05.2020 | Installation of 7 Nos Hand pump at N.M.Y. HARDOI. | 16-May-2020 03:00 PM | 250.00 | | |
151 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_470830_1 | N.K./Lko/E-Nivida/2020-44 Dated 15.05.2020 | Installation of 05 Nos Hand pump at N.M.Y. Sandi, HARDOI. | 16-May-2020 03:00 PM | 250.00 | | |
152 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_470836_1 | N.K./Lko/E-Nivida/2020-44 Dated 15.05.2020 | Installation of 02 Nos Hand pump at N.M.Y. Unnao | 16-May-2020 03:00 PM | 250.00 | | |
153 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_476060_1 | N.K./Lko/E-Nivida/2020-80 Dated 27.05.2020 | Installation of 7 Nos Hand pump at N.M.Y. HARDOI. | 28-May-2020 09:00 AM | 250.00 | | |
154 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_476083_1 | N.K./Lko/E-Nivida/2020-80 Dated 27.05.2020 | Reboring of india mark II hand Pump at NMY Sitapur road (3 No.) and F/V market yard Dubagga (4 No.) Lucknow. | 28-May-2020 09:00 AM | 250.00 | | |
155 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_476103_1 | N.K./Lko/E-Nivida/2020-80 Dated 27.05.2020 | Installation of 8 Nos Hand pump at N.M.Y Madhoganj, Hardoi. | 28-May-2020 09:00 AM | 250.00 | | |
156 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_476138_1 | N.K./Lko/E-Nivida/2020-80 Dated 27.05.2020 | Installation of 06 No. India Mark-2 Hand pump At NMY Mahmudabad Dist. Sitapur. | 28-May-2020 09:00 AM | 250.00 | | |
157 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_476126_1 | N.K./Lko/E-Nivida/2020-80 Dated 27.05.2020 | Installation of 05 Nos Hand pump at N.M.Y. Sandi, HARDOI. | 28-May-2020 09:00 AM | 250.00 | | |
158 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_478242_1 | N.K./LKO/E-Nivida/2020-95 Dated 01.06.2020 | R/S of internal road with C.C Road, R.C.C drain work widing, const. of 2 No. Main gate, Rep. of Canteen Building , Const. of APF with Truss and sheeting work, Rep. sewer line and manhole, Const. laying water supply Pipe line etc at NMY Lko. | 02-Jun-2020 09:00 AM | 5000.00 | | |
159 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_478251_1 | N.K./LKO/E-Nivida/2020-95 Dated 01.06.2020 | Construction of 15 No. C Type shops, Repairing and painting of 15 No. super market shop and grain, fruit and vegetable market at NMY PALIYA. | 02-Jun-2020 09:00 AM | 781.69 | | |
160 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_478263_1 | N.K./LKO/E-Nivida/2020-95 Dated 01.06.2020 | Repairing of Link road from Hardoi road to Central institute for Subtropical Horticulture at Rehman kheda Lucknow. | 02-Jun-2020 09:00 AM | 557.01 | | |
161 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_480551_1 | N.K./Lko/E-Nivida/2020-125 Dated 06.06.2020 | Installation of 06 No. India Mark-2 Hand pump At NMY Mahmudabad Dist. Sitapur. | 06-Jun-2020 04:00 PM | 250.00 | | |
162 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_480558_1 | N.K./Lko/E-Nivida/2020-125 Dated 06.06.2020 | Reboring of india mark II hand Pump at NMY Sitapur road (3 No.) and F/V market yard Dubagga (4 No.) Lucknow. | 06-Jun-2020 04:00 PM | 250.00 | | |
163 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_480562_1 | N.K./Lko/E-Nivida/2020-125 Dated 06.06.2020 | Installation of 8 Nos Hand pump at N.M.Y Madhoganj, Hardoi. | 06-Jun-2020 04:00 PM | 250.00 | | |
164 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_480576_1 | N.K./Lko/E-Nivida/2020-125 Dated 06.06.2020 | Installation of 05 Nos Hand pump at N.M.Y. Sandi, HARDOI. | 06-Jun-2020 04:00 PM | 250.00 | | |
165 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_480587_1 | N.K./Lko/E-Nivida/2020-125 Dated 06.06.2020 | Installation of 7 Nos Hand pump at N.M.Y. HARDOI. | 06-Jun-2020 04:00 PM | 250.00 | | |
166 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_499822_1 | N.K./Lko/E-Nivida/2020-398 Dated 07.08.2020 | Rep. and strengthing of internal road with C.C Road, R.C.C drain work widing and const. of 2 No. Main gate, Rep. of Canteen Building (3 Nos.), Rep. sewer line and manhole, Const. and laying water supply Pipe line etc work at N.M.Y Lko | 08-Aug-2020 09:00 AM | 5000.00 | | |
167 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_499831_1 | N.K./Lko/E-Nivida/2020-398 Dated 07.08.2020 | Const. of Gate and Gate pillar, P and L of Trimix on old C.C. and Repair and Maintenance of 500M.T. Godown, A, B, and C type shop of F/V Market, C.C. work and internal Drain and Drain cover etc. at NMY SITAPUR. | 08-Aug-2020 09:00 AM | 1503.89 | | |
168 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_502767_1 | N.K./Lko/E-Nivida/2020-428 Dated 18.08.2020 | Construction of Electrical substation Underground Tank, Tubewell Room 2 no and HVAC plant room at Sub Mandi yard Malihabad Lucknow. | 19-Aug-2020 09:00 AM | 1014.18 | | |
169 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_502779_1 | N.K./Lko./E-Nivida/2020-428 Dated 18.08.2020 | Reboring of india mark II hand Pump at NMY Sitapur road (3 No.) and F/V market yard Dubagga (4 No.) Lucknow. | 19-Aug-2020 09:00 AM | 250.00 | | |
170 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_502783_1 | N.K./Lko./E-Nivida/2020-428 Dated 18.08.2020 | Installation of 06 No. India Mark-2 Hand pump At NMY Mahmudabad Dist. Sitapur. | 19-Aug-2020 09:00 AM | 250.00 | | |
171 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_502791_1 | N.K./Lko./E-Nivida/2020-428 Dated 18.08.2020 | Repairing of Link road from Hardoi road to Central institute for Subtropical Horticulture at Rehman kheda Lucknow. | 19-Aug-2020 09:00 AM | 557.01 | | |
172 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_507499_1 | N.K./Lko/ E-Nivida/2020-456 Dated 02.09.2020 | Rep. and strengthing of internal road with C.C Road, R.C.C drain work widing and const. of 2 No. Main gate, Rep. of Canteen Building 3 Nos., Rep. sewer line and manhole, Const. and laying water supply Pipe line etc work at NMY Sitapur Road Lko. | 03-Sep-2020 09:00 AM | 5000.00 | | |
173 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_507508_1 | N.K./Lko/E-Nivida/2020-456 Dated 02.09.2020 | Const. of Gate and Gate pillar, P/L of Trimix on old C.C. and Repair/Maintenance of 500M.T. Godown, A, B and C type shop of F/V Market, C.C. work and internal Drain and Drain cover etc. at NMY SITAPUR | 03-Sep-2020 09:00 AM | 1503.89 | | |
174 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_514264_1 | N.K./Lko/E-Nivida/2020-586 Dated 23.09.2020 | Installation of 06 No. India Mark-2 Hand pump At NMY Mahmudabad Dist. Sitapur. | 24-Sep-2020 09:00 AM | 250.00 | | |
175 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_514271_1 | N.K./Lko/E-Nivida/2020-586 Dated 23-09-2020 | Reboring of india mark II hand Pump at NMY Sitapur road (3 No.) and F/V market yard Dubagga (4 No.) Lucknow. | 24-Sep-2020 09:00 AM | 250.00 | | |
176 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_519047_1 | N.K./lko/E-nivida/2020-697 Dated 08.10.2020 | Installation of 06 No. India Mark-2 Hand pump At NMY Mahmudabad Dist. Sitapur. | 09-Oct-2020 09:00 AM | 250.00 | | |
177 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_519055_1 | N.K./lko/E-Nivida/2020-697 Dated 08.10.2020 | Reboring of india mark II hand Pump at NMY Sitapur road (3 No.) and F/V market yard Dubagga (4 No.) Lucknow. | 09-Oct-2020 09:00 AM | 250.00 | | |
178 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_523502_1 | N.K./LKO/E-Nivida/2020-757 Dated 21.10.2020 | Installation of 06 No. India Mark-2 Hand pump At NMY Mahmudabad Dist. Sitapur. | 21-Oct-2020 03:00 PM | 250.00 | | |
179 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_526335_1 | N.K./lko/E-Nivida/2020-821 Dated 29.10.2020 | Installation of 06 No. India Mark-2 Hand pump At NMY Mahmudabad Dist. Sitapur. | 30-Oct-2020 09:00 AM | 250.00 | | |
180 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_527789_1 | N.K./LKO/E-Nivida/2020-866 Dated 04.11.2020 | Const. of Gate and Gate pillar, P and L of Trimix on old C.C. and Repair and Maintenance of 500M.T. Godown, A, B, C type shop of F and V Market, C.C. work and internal Drain and Drain cover etc. at NMY SITAPUR. | 04-Nov-2020 03:30 PM | 1503.89 | | |
181 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_533995_1 | N.K/lko/E-Nivida/2020-981 Daded 28.11.2020 | Construction of link road mall-Bhrawan road Naubasta villege marg at Gudd field to jindana under mandi samiti Lucknow. Length 1-55 K.M. | 28-Nov-2020 04:00 PM | 477.22 | | |
182 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_535366_1 | (E-Quatation)/2020-1023 Dated 04.12.20 | Supply, Erection, Testing and commissioning work of sewerage treatment plant ( Capacity/Daily average flow-100 cum/day) | 05-Dec-2020 09:00 AM | 250.00 | | |
183 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_537291_1 | N.K./lko/E-Nivida/2020-1064 Dated 11-12-2020 | Repairing and Maintenance Existing 3 Nos A.P.F (9X40)M, 1 nos 9x40 Godown A.P.F Sheet at N.M.Y Madhoganj | 12-Dec-2020 09:00 AM | 250.00 | | |
184 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_537299_1 | N.K./Lko/E-Nivida/2020-1064 Dated 11-12-2020 | Providing and Laying of Brick Soling , Earth work in embankment, cartage arround existing A.P.F at N.M.Y Hardoi. | 12-Dec-2020 09:00 AM | 250.00 | | |
185 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_537309_1 | N.K./Lko/E-Nivida/2020-1064 Dated 11-12-2020 | Repairing and Painting Existing 1 Nos A.P.F (12X44) M and 1 Nos A.P.F (12X88)M | 12-Dec-2020 09:00 AM | 250.00 | | |
186 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_537343_1 | N.K./Lko/E-Nivida/2020-1064 Dated 11-12-2020 | construction of damage boundary wall crossing and minor repairing of AC sheet on A.P.F at N.M.Y Gola Distruct Lakhimpur. | 12-Dec-2020 09:00 AM | 250.00 | | |
187 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_537347_1 | N.K./Lko/E-Nivida/2020-1064 Dated 11-12-2020 | Repairing and mentanance of internal mandi yard at N.M.Y Lakhimpur | 12-Dec-2020 09:00 AM | 250.00 | | |
188 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_539579_1 | N.K./Lko/E-Nivida/2020-1098 Dated 19.12.20 | Repairing and Maintenance of 9x40 M. coverd APF and drain etc. At NMY Raibareilly. | 21-Dec-2020 03:00 PM | 250.00 | | |
189 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_539585_1 | N.K./Lko/E-Nivida/2020-1098 Dated 19.12.20 | Repairing/Maintenance of boundary wall for damage old boundary wall, c type shop and 9x40 M. coverd shed etc. At SMY Maharajganj (Bachrawan) | 21-Dec-2020 03:00 PM | 250.00 | | |
190 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_539587_1 | N.K./Lko/E-Nivida/2020-1098 Dated 19.12.20 | Repairing/Maintenance of 9x40 M. covered APF, Office bulding, boundary wall etc at SMY Laherpur. | 21-Dec-2020 03:00 PM | 250.00 | | |
191 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_539571_1 | N.K./Lko/E-Nivida/2020-1098 Dated 19.12.20 | Reparing of Coverd APF sheeting work at NMY. Dubagga Lucknow. | 21-Dec-2020 03:10 PM | 250.00 | | |
192 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_539575_1 | N.K./Lko/E-Nivida/2020-1098 Dated 19.12.20 | Reparing of Coverd APF sheeting work, Toilet, sewer line connection, main hole cover and main hole cleaning work and miner reparing of C.C. patch work at Fish mandi Hardoi road, Dubagga Lucknow. | 21-Dec-2020 03:10 PM | 250.00 | | |
193 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_540865_1 | N.K./Lko/E-Nivida/2020-1126 Dated 24.12.2020 | R/M of Link road Noharipurwa to Mohriya via Shivpuri under mandi samiti Lucknow. | 26-Dec-2020 09:00 AM | 250.00 | | |
194 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_540878_1 | N.K./Lko/E-Nivida/2020-1126 Dated 24.12.2020 | Reparing and Meaintinance of L/R Ahmad Nager to Dhaurahra at UMS Gola. | 26-Dec-2020 09:00 AM | 313.01 | | |
195 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_540886_1 | D.D.C. Mandi Parishad Lucknow. | Jhaupur Chauraha to Nya Gaun. | 26-Dec-2020 09:00 AM | 250.00 | | |
196 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_540891_1 | N.K./Lko/E-Nivida/2020-1126 Dated 24.12.2020 | Gola bakeyganj to Imaliya | 26-Dec-2020 09:00 AM | 250.00 | | |
197 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_540893_1 | N.K./Lko/E-Nivida/2020-1126 Dated 24.12.2020 | Chapkaha road to Kabirpur via kuti purwa road (Part-1) | 26-Dec-2020 09:00 AM | 257.39 | | |
198 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_541821_1 | N.K./Lko/E-Nivida/2020-1151 Dated 29.12.2020 | Repairing/Maintenance of link road from Godwa to Sahabganj Under Mandi Sitapur, Distt. Sitapur. | 30-Dec-2020 09:00 AM | 257.59 | | |
199 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_541851_1 | N.K./Lko/E-Nivida/2020-1151 Dated 29.12.2020 | Repairing/Maintenance of Link road from Tindwar to Luximanpur under Mandi Samiti Sitapur Distt. Sitapur. | 30-Dec-2020 09:00 AM | 250.00 | | |
200 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_541849_1 | N.K./Lko/E-Nivida/2020-1151 Dated 29.12.2020 | Reparing/Maintenance of Link road from Ailiya marg to Malikapur marg via Sujawalpur under Mandi Samiti Sitapur Distt. Sitapur. | 30-Dec-2020 09:00 AM | 250.00 | | |
201 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_541847_1 | N.K./Lko/E-Nivida/2020-1151 Dated 29.12.2020 | Repairing/Maintenance of link road from Bhanwapur to Sujaulapur Under Mandi Hargoan Distt. Sitapur. | 30-Dec-2020 09:00 AM | 250.00 | | |
202 | SE Zone-5||Dy Director Construction, Lucknow | 2020_RKUMP_541830_1 | N.K./Lko/E-Nivida/2020-1151 Dated 29.12.2020 | Repairing/Maintenance of link road from Pipri-Bhattha to Bhelawan via Gokulaha under Mandi Samiti hargoan Distt. Sitapur. | 30-Dec-2020 09:00 AM | 250.00 | | |
203 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_544183_1 | N.K./Lko/E-Nivida/2020-1208 Dated 07.01.2021 | Repairing and Maintenance Existing 3 Nos A.P.F (9X40)M, 1 nos 9x40 Godown A.P.F Sheet at N.M.Y Madhoganj | 07-Jan-2021 02:00 PM | 250.00 | | |
204 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_544189_1 | N.K./Lko/E-Nivida/2020-1208 Dated 07.01.2021 | Providing and Laying of Brick Soling , Earth work in embankment, cartage arround existing A.P.F at N.M.Y Hardoi. | 07-Jan-2021 02:00 PM | 250.00 | | |
205 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_544193_1 | N.K./Lko/E-Nivida/2020-1208 Dated 07.01.2021 | Repairing and Painting Existing 1 Nos A.P.F (12X44) M and 1 Nos A.P.F (12X88)M at N.M.Y Shahabad | 07-Jan-2021 02:00 PM | 250.00 | | |
206 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_544198_1 | N.K./Lko/E-Nivida/2020-1208 Dated 07.01.2021 | construction of damage boundary wall crossing and minor repairing of AC sheet on A.P.F at N.M.Y Gola Distruct Lakhimpur. | 07-Jan-2021 02:00 PM | 250.00 | | |
207 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_544204_1 | N.K./Lko/E-Nivida/2020-1208 Dated 07.01.2021 | Repairing and mentanance of internal mandi yard at N.M.Y Lakhimpur | 07-Jan-2021 02:00 PM | 250.00 | | |
208 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_545147_1 | N.K./LKO/E-NiViDA/2021-1227 Dated 11.01.2021 | Repairing/Maintenance of Link road from Khuchma to Kosokhas under Mandi Samiti Raibarelly. | 12-Jan-2021 09:00 AM | 279.94 | | |
209 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_545158_1 | N.K./Lko/E-Nivida/2021-1227 Dated 11-01-2021 | Repairing/Maintenance of Link road from End of gangapurva to Sanika via pure Chandey under Mandi Samiti Raibarelly. | 12-Jan-2021 09:00 AM | 250.00 | | |
210 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_545390_1 | Latter No. 1233 Dated 12.01.2021 | SUPPLY, ERECTION, TESTING and COMMISSIONING WORK of SEWERAGE TREATMENT PLAN, Capacity, Daily average flow 100 Cum per day. | 12-Jan-2021 03:00 PM | 250.00 | | |
211 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_545459_1 | N.K./Lko/E-Nivida/2020-1242 Dated 12.01.2021 | Reparing of Coverd APF sheeting work at NMY. Dubagga Lucknow. | 13-Jan-2021 09:00 AM | 250.00 | | |
212 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_545466_1 | N.K./Lko/E-Nivida/2020-1242 Dated 12.01.2021 | Reparing of Coverd APF sheeting work, Toilet, sewer line connection, main hole cover and main hole cleaning work and miner reparing of C.C. patch work at Fish mandi Hardoi road, Dubagga Lucknow. | 13-Jan-2021 09:00 AM | 250.00 | | |
213 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_545473_1 | N.K./Lko/E-Nivida/2020-1242 Dated 12.01.2021 | Repairing/Maintenance of 9x40 M. covered APF, Office bulding, boundary wall etc at SMY Laherpur. | 13-Jan-2021 09:00 AM | 250.00 | | |
214 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_545481_1 | N.K./Lko/E-Nivida/2020-1242 Dated 12.01.2021 | Repairing/Maintenance of boundary wall for damage old boundary wall, c type shop and 9x40 M. coverd shed etc. At SMY Maharajganj (Bachrawan) | 13-Jan-2021 09:00 AM | 250.00 | | |
215 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_545494_1 | N.K./Lko/E-Nivida/2020-1242 Dated 12.01.2021 | Repairing/Maintenance of 9x40 M. coverd APF and drain etc. At NMY Raibareilly. | 13-Jan-2021 09:00 AM | 250.00 | | |
216 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_547301_1 | N.K./LKO/E-Nivida/2021-1274 Dated 19.01.2021 | Construction of Proposed boundry wall (1112.00)m and Gate and gate pillar at sub mandi yard Mawai Bramhanan | 20-Jan-2021 09:00 AM | 998.66 | | |
217 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_547432_1 | N.K./Lko/E-Nivida/2021-1276 Dated 20.01.2021 | R/M of Link road Noharipurwa to Mohriya via Shivpuri under mandi samiti Lucknow. | 21-Jan-2021 09:00 AM | 250.00 | | |
218 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_548839_1 | N.K./Lko/E-Nivida/2021-1304 Dated 25-01-2021 | Construction of 02 No. coverd A.P.F. (6x20M), Boundary wall, 02 No. Gate and gate pillar, 02 No. Toilet, Inter Locking, Drain etc. in Hot Path at village Sultanpur Khera Under Mandi Samiti Raibareilly Distt. Raibareilly. | 25-Jan-2021 06:00 PM | 422.52 | | |
219 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_549351_1 | N.K./Lko/E-Nivida/2021-1315 Dated 27-01-2021 | Repairing and Maintenance Existing 3 Nos A.P.F (9X40)M, 1 nos 9x40 Godown A.P.F Sheet at N.M.Y Madhoganj | 27-Jan-2021 06:00 PM | 250.00 | | |
220 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_549519_1 | N.K./Lko/E-Nivida/2021-1327 Dated 28-01-2021 | L/R Hilauli Sandana Road to Ganjrajkheda under Mandi Samiti Purwa Disst. Unnao. | 28-Jan-2021 03:00 PM | 250.00 | | |
221 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_549527_1 | N.K./Lko/E-Nivida/2021-1327 Dated 28-01-2021 | L/R Maha Vidyalay Gadakola marg to via Jalesar va shahiviya talab hote huye Nankau Pasi Ke Ghar tak Under Mandi Samiti Bangarmau Disst. Unnao. | 28-Jan-2021 03:00 PM | 250.00 | | |
222 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_549532_1 | N.K./Lko/E-Nivida/2021-1327 Dated 28-01-2021 | L/R Ajraikheda Road to Maniya tak Under Mandi Samiti Unnao, Disst. Unnao. | 28-Jan-2021 03:00 PM | 250.00 | | |
223 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_549953_1 | N.K./Lko/E-Nivida/2021-1355 Dated 29-01-2021 | Construction of 05 No. C Type Shop, Intarnal road, 01 No. 09x40M APF (Shed and civil Work), and Drain Crossing at NMY Biswan. Distt. Sitapur | 30-Jan-2021 09:00 AM | 779.32 | | |
224 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_550521_1 | N.K./Lko/E-Nivida/2021-1373 Dated 01-02-2021 | Reparing of Coverd APF sheeting work, Toilet, sewer line connection, main hole cover and main hole cleaning work and miner reparing of C.C. patch work at Fish mandi Hardoi road, Dubagga Lucknow. | 02-Feb-2021 09:00 AM | 250.00 | | |
225 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_551906_1 | N.K./Lko./E-Nivida/2021-1414 Dated 05-02-2021 | Repairing and mentanance of L/R Fattepur Chattapur Marg to Ballipur at N.M.Y Maigalganj Dist. Lakhimpur kheri. | 06-Feb-2021 09:00 AM | 250.00 | | |
226 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_554042_1 | N.K./Lko/E-Nivida/2021-1446 Dated 10-02-2021 | Construction of one side Drain and C.C. Road at Jura to Sarra Remaining part Under Mandi Samiti Hardoi. | 11-Feb-2021 09:00 AM | 250.00 | | |
227 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_554056_1 | N.K./Lko/E-Nivida/2021-1446 Dated 10-02-2021 | L/R Bilgram Unnao road to Kazipur Under Mandi Samit Madhoganj Dist. Hardoi. | 11-Feb-2021 09:00 AM | 270.04 | | |
228 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_554073_1 | N.K./Lko/E-Nivida/2021-1446 Dated 10-02-2021 | L/R Ganj Jalalabad Sesh Bhikhari pur Under Mandi Samiti Madhoganj Dist. Hardoi. | 11-Feb-2021 09:00 AM | 250.00 | | |
229 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_554088_1 | N.K./Lko/E-Nivida/2021-1446 Dated 10-02-2021 | L/R S.P. coat Naher Kothi to Sultanpur under Mandi Samiti Madhoganj Disst. Hardoi. | 11-Feb-2021 09:00 AM | 288.70 | | |
230 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_554098_1 | N.K./Lko/E-Nivida/2021-1446 Dated 10-02-2021 | L/R Kallepur road to Lodhkheda remaining part Under Mandi Samiti Sandila Dist. Hardoi | 11-Feb-2021 09:00 AM | 250.00 | | |
231 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_554107_1 | N.K./Lko/E-Nivida/2021-1446 Dated 10-02-2021 | Repairing/Maintenance of Link road from On Nihadstha gaheri marg Sarai Mishon to Jogapur Under Mandi samiti Lalganj Dist. Raibareli. | 11-Feb-2021 09:00 AM | 322.23 | | |
232 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_554112_1 | N.K./Lko/E-Nivida/2021-1446 Dated 10-02-2021 | Repairing/Maintenance of Link road from Dalmau marg to Mahmdmau Under Mandi samiti Lalganj Dist. Raibareli. | 11-Feb-2021 09:00 AM | 250.00 | | |
233 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_554905_1 | N.K./Lko/E-Nivida/2021-1476 Dated 12-02-2021 | Installation of 06 No. India Mark-2 Hand pump At NMY Mahmudabad Dist. Sitapur. | 12-Feb-2021 06:00 PM | 250.00 | | |
234 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_556605_1 | N.K./Lko/E-Nivida/2020-1515 Dated 18-02-2021 | Construction of coverd A.P.F (12x28 M.) At F/V market yard Dubagga Lucknow. | 18-Feb-2021 06:00 PM | 250.00 | | |
235 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_557972_1 | N.K./Lko/E-Nivida/2021-1548 Dated 22.02.2021 | L/R Hilauli Sandana Road to Ganjrajkheda under Mandi Samiti Purwa Disst. Unnao. | 22-Feb-2021 04:00 PM | 250.00 | | |
236 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_557987_1 | N.K./Lko/E-Nivida/2021-1548 Dated 22.02.2021 | L/R Madhmik Vidyalay Gadakola marg to via Jalesar va shahiviya talab hote huye Nankau Pasi Ke Ghar tak Under Mandi Samiti Bangarmau Disst. Unnao. | 22-Feb-2021 04:00 PM | 250.00 | | |
237 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_558000_1 | N.K./Lko/E-Nivida/2021-1548 Dated 22.02.2021 | L/R Ajraikheda Road to Maniya tak Under Mandi Samiti Unnao, Disst. Unnao. | 22-Feb-2021 04:00 PM | 250.00 | | |
238 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_558458_1 | N.K./Lko/E-Nivida/2021-1563 Dated 23.02.2021 | Construction of 05 No. C Type Shop, Intarnal road, 01 No. 09x40M APF (Shed and civil Work), and Drain Crossing at NMY Biswan. Distt. Sitapur | 23-Feb-2021 02:00 PM | 779.32 | | |
239 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_568712_1 | N.K./Lko/E-Nivida/2021-1673 Dated 12-03-2021 | Construction of one side Drain and C.C. Road at Jura to Sarra Remaining part Under Mandi Samiti Hardoi. | 12-Mar-2021 01:00 PM | 250.00 | | |
240 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_568723_1 | N.K./Lko/E-Nivida/2021-1673 Dated 12-03-2021 | L/R Bilgram Unnao road to Kazipur Under Mandi Samit Madhoganj Dist. Hardoi. | 12-Mar-2021 01:00 PM | 270.04 | | |
241 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_568756_1 | N.K./Lko/E-Nivida/2021-1673 Dated 12-03-2021 | L/R S.P. coat Naher Kothi to Sultanpur under Mandi Samiti Madhoganj Disst. Hardoi. | 12-Mar-2021 01:00 PM | 288.70 | | |
242 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_568772_1 | N.K./Lko/E-Nivida/2021-1673 Dated 12-03-2021 | L/R Kallepur road to Lodhkheda remaining part Under Mandi Samiti Sandila Dist. Hardoi | 12-Mar-2021 01:00 PM | 250.00 | | |
243 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_570436_1 | N.K./Lko/E-Nivida/2021-1695 Dated 15.03.2021 | L/R Hilauli Sandana Road to Ganjrajkheda under Mandi Samiti Purwa Disst. Unnao. | 15-Mar-2021 06:00 PM | 250.00 | | |
244 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_570466_1 | N.K./Lko/E-Nivida/2021-1695 Dated 15.03.2021 | L/R Madhmik Vidyalay Gadakola marg to via Jalesar va shahiviya talab hote huye Nankau Pasi Ke Ghar tak Under Mandi Samiti Bangarmau Disst. Unnao. | 15-Mar-2021 06:00 PM | 250.00 | | |
245 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_570503_1 | N.K./Lko/E-Nivida/2021-1695 Dated 15.03.2021 | L/R Ajraikheda Road to Maniya tak Under Mandi Samiti Unnao, Disst. Unnao. | 15-Mar-2021 06:00 PM | 250.00 | | |
246 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_575195_1 | N.K./Lko/E-Nivida/2021-1740 Dated 23.03.2021 | Construction of 02 No. coverd A.P.F. (6x20M), Boundary wall, 02 No. Gate and gate pillar, 02 No. Toilet, Inter Locking, Drain etc. in Hot Path at village Sultanpur Khera Under Mandi Samiti Raibareilly Distt. Raibareilly. | 23-Mar-2021 04:00 PM | 441.92 | | |
247 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_575219_1 | N.K./Lko/E-Nivida/2021-1738 Dated 23.03.2021 | Construction of Proposed boundry wall (1112.00)m and Gate and gate pillar at sub mandi yard Mawai Bramhanan | 23-Mar-2021 04:00 PM | 998.66 | | |
248 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_591624_1 | N.K./LKO/E-Nivids/2021-1911 Dated 02.06.2021 | Construction of 02 No. coverd A.P.F. (6x20M), Boundary wall, 02 No. Gate and gate pillar, 02 No. Toilet, Inter Locking, Drain etc. in Hot Path at village Sultanpur Khera Under Mandi Samiti Raibareilly Distt. Raibareilly. | 02-Jun-2021 02:00 PM | 441.92 | | |
249 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_591636_1 | N.K./LKO/E-Nivida/2021-1911 Dated 02.06.2021 | Construction of Proposed boundry wall (1112.00)m and Gate and gate pillar at sub mandi yard Mawai Bramhanan | 02-Jun-2021 02:00 PM | 998.66 | | |
250 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_599599_1 | N.K./Lko/E-Nivida/2021-2063 Dated 28.06.2021 | Construction of Proposed boundry wall (1112.00)m and Gate and gate pillar at sub mandi yard Mawai Bramhanan | 28-Jun-2021 03:00 PM | 998.66 | | |
251 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_610492_1 | N.K./LKO/E-Nivida/2021-2388 Dated 11.08.2021 | Construction of (12x72) M. A.P.F. with truss and sheeting work at N.M.Y. Sitapur road Lucknow. | 12-Aug-2021 09:00 AM | 250.00 | | |
252 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_610523_1 | N.K./LKO/E-Nivida/2021-2388 Dated 11.08.2021 | Construction of 02 No. coverd A.P.F. (6x20M), Boundary wall, 02 No. Gate and gate pillar, 02 No. Toilet, Inter Locking, Drain etc. in Hot Path at village Sultanpur Khera Under Mandi Samiti Raibareilly Distt. Raibareilly. | 12-Aug-2021 09:00 AM | 441.92 | | |
253 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_616837_1 | N.K./Lko/E-Nivida/2021-2592 Dated 08.09.2021 | Construction of (12x72) M. A.P.F. with truss and sheeting work at N.M.Y. Sitapur road Lucknow. | 09-Sep-2021 02:00 PM | 250.00 | | |
254 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619424_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | Renewal of link road Sandana to Sultanpur under NMY Misrit. | 24-Sep-2021 09:00 AM | 250.00 | | |
255 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619422_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | Renewal of link road Gangapur Chauraha to Terwa under NMY Misrit | 24-Sep-2021 09:00 AM | 250.00 | | |
256 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619414_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | REPAIRING of link road Tekari SE Nathuapur Tak Under N.M.Y. Raibarelly | 24-Sep-2021 09:00 AM | 250.00 | | |
257 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619412_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | REPAIRING OF LINK ROAD BHITARGAON SE NAYAGAON HOTE HUE SAINI TAK Under N.M.Y. lalganj | 24-Sep-2021 09:00 AM | 387.20 | | |
258 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619410_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | REPAIRING OF Link Road Raibareily Parshadepur Road Se Bilawarpur hote huwe RashidpurTak Under N.M.Y. SALON. | 24-Sep-2021 09:00 AM | 313.20 | | |
259 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619409_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | Repairing of link road Ganjmuradabad shridhar marg to jaferabad under NMY Bangermau. | 24-Sep-2021 09:00 AM | 250.00 | | |
260 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619407_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | Repairing of link road Gulapur marg to shahpur khurd under NMY Bangermau. | 24-Sep-2021 09:00 AM | 250.00 | | |
261 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619406_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | Repairing Of Link Road Kanpur road to Kasrawan upto Lucknow Hardoi road Under N.M.Y. Hardoi | 24-Sep-2021 09:00 AM | 583.01 | | |
262 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619404_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | Repairing of link road Ahirori to Barkhervar NMY Hardoi | 24-Sep-2021 09:00 AM | 436.65 | | |
263 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619403_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | Renewal of link road Rudrapur Hulasipurwa to Hatwa under NMY Lakhimpur | 24-Sep-2021 09:00 AM | 250.00 | | |
264 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619402_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | Renewal of link road Nighasan Road to Bangla Kutti under NMY Tikonia | 24-Sep-2021 09:00 AM | 250.00 | | |
265 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619401_1 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | Renewal of link road Khajuha to Shankerpur under NMY Lakhimpur. | 24-Sep-2021 09:00 AM | 343.13 | | |
266 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_625633_1 | N.K./Lko/E-Nivida/2021-2782 Dated 28.09.2021 | Construction of (12x72) M. A.P.F. with truss and sheeting work at N.M.Y. Sitapur road Lucknow. | 28-Sep-2021 04:00 PM | 250.00 | | |
267 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_619412_2 | N.K./Lko/E-Nivida/2021-2631 Dated 13.09.2021 | REPAIRING OF LINK ROAD BHITARGAON SE NAYAGAON HOTE HUE SAINI TAK Under N.M.Y. lalganj | 01-Oct-2021 03:30 PM | 387.20 | | |
268 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_629760_1 | N.K./Lko/E-Nivida/2021-2892 Dated 06.10.2021 | Repairing of link road Ganjmuradabad shridhar marg to jaferabad under NMY Bangarmau Dist. Unnao. | 11-Oct-2021 09:00 AM | 250.00 | | |
269 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_629773_1 | N.K./Lko/E-Nivida/2021-2892 Dated 06.10.2021 | Repairing of link road Gulapur marg to shahpur khurd under NMY Bangermau Dist. Unnao. | 11-Oct-2021 09:00 AM | 250.00 | | |
270 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_639993_1 | N.K./LKO./E-Nivida/2021-3276 Dated 03.11.2021 | Construction of Under Ground water tank at NMY Sitapur road Lucknow. | 03-Nov-2021 05:00 PM | 465.70 | | |
271 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_641260_1 | N.K./lko/E-Nivida/2021-3299 Dated 09.11.2021 | Construction of (12x72) M. A.P.F. with truss and sheeting work at N.M.Y. Sitapur road Lucknow. | 09-Nov-2021 03:00 PM | 250.00 | | |
272 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_648418_1 | N.K./Lko/E-Nivida/2021-3419 Dated 27.11.2021 | Construction of Under Ground water tank at NMY Sitapur road Lucknow. | 27-Nov-2021 05:00 PM | 465.70 | | |
273 | SE Zone-5||Dy Director Construction, Lucknow | 2021_RKUMP_644606_1 | N.K./LKO/E-Nivida/2021-3367 Dated 18.11.2021 | Repair of Link road Malhour Railway crossing to satrikh road via Gosainpur pusepurwa erakhas under Mandi Samiti Lucknow. | 02-Dec-2021 12:00 PM | 250.00 | | |
274 | SE Zone-5||Dy Director Construction, Lucknow | 2022_RKUMP_671653_1 | N.K./Lko/E-Nivida/2022-3662 Dated 05.01.2022 | Repairing of 06 No. A.P.F. (12x88) and 15 No. A type, 09 No. B type and 30 No. C type shops, earth filling, 01 No. culvert, repairing of broken boundary wall and 04 No. India Mark-2 hand pump reboringb at N.M.Y Hardoi. | 06-Jan-2022 09:00 AM | 250.00 | | |
275 | SE Zone-5||Dy Director Construction, Lucknow | 2022_RKUMP_674347_1 | N.K./Lko/E-Nivida/2022-3709 Dated 12.01.2022 | Repairing and Maintenance of Most Necessary Chhut-put work and 04 No. India Mark-2 hand pump reboringb at N.M.Y Lakhimpur. | 12-Jan-2022 03:00 PM | 250.00 | | |
276 | SE Zone-5||Dy Director Construction, Lucknow | 2022_RKUMP_675018_1 | N.K./Lko/E-Nivida/2022-3780 Dated 21.01.2022 | Repairing of 06 No. A.P.F. (12x88) and 15 No. A type, 09 No. B type and 30 No. C type shops, earth filling, 01 No. culvert, repairing of broken boundary wall and 04 No. India Mark-2 hand pump reboringb at N.M.Y Hardoi. | 21-Jan-2022 05:00 PM | 250.00 | | |
277 | SE Zone-5||Dy Director Construction, Lucknow | 2022_RKUMP_675201_1 | N.K./Lko/E-Nivida/2022-3807 Dated 27.01.2022 | Repairing and Maintenance of Most Necessary Chhut-put work and 04 No. India Mark-2 hand pump reboringb at N.M.Y Lakhimpur. | 27-Jan-2022 06:00 PM | 250.00 | | |
278 | SE Zone-5||Dy Director Construction, Lucknow | 2022_RKUMP_675332_1 | N.K./Lko/E-Nivida/2022-3829 Dated 31-01-2022 | Repairing of 06 No. A.P.F. (12x88) and 15 No. A type, 09 No. B type and 30 No. C type shops, earth filling, 01 No. culvert, repairing of broken boundary wall and 04 No. India Mark-2 hand pump reboringb at N.M.Y Hardoi. | 01-Feb-2022 02:00 PM | 250.00 | | |
Total | | | | | | 138236.85 | | |